HomeMy WebLinkAboutBLD96-187City of Port Townsend 640 Water street
Port Townsend, WA 98368
Building and Community Development
BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD 8~ APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
Call 385-2294 For Inspection
Site Address: 504 FOSTER ST
Parcel No: 974100601
Project:
GERALD T HARPOLE
SD4 FOSTER
Issued: 1 /14/97
Lot: Block:
PERMIT #BLD9s-oo~s~
GERALD T HARPOLE
504 FOSTER
-PROJECT DESCRIPTIO
Residential Addition -Shed dormer added to Floor space of existing bedroom.
City Contact:
Type of work: ADO
Type of use: SF
Census Category.
Estimatetl Value: $5.376.00
Zoning:
~ SI Code:
Construction Type/Occ Use/Occ Load
Construction Occupa ncy
Type 1: 5N Group 1: R-3 Load 1:
Type 2: Group 2: Load 2:
Type 3: Group 3: Load 3:
Type 4: Group 4: Load 4:
SPECIAL GONDITIONS~IRESTRICTIONS APPLY -SEE LAST PAGE
fVG4w ryti'~
1,=3-~G1 -~ ~;~Q ~C~`~ ,,~5~"- REQUIRED INSPECTIONS
Inspection Date Inspector Inspection Date Inspector'
FRAMING i ~ "~ ~.5 VAPOR BARRIER i
Insp-See Special Conditions i Insp-See Special Conditions '~
-Walls DRYWALL NAILING ~ ~~, ~ ~S
-Roof
-Attic Venting
r
,~
~
~ -Walls
-Ceiling /' j
1
~-
-
-Window U Value ~ 3 ~ _
~ ~ FINAL ~i
-Air Seal ' Final-House Number ~,
_
-Fire Blocking
Final-Building
INSULATION I
~ Final-Smoke Det. Througout I
.-Wall (R-19) /
~% y~71
~ -{~L'r21Z,G.~'C~cl f ~c~uL: Lek' ~~S! `l'`f3 `J~
-Ceiling (R-30)
-Raffles _ /3,, L~ ~ ~~ ~~ j I
~ fTli /'
I
Cavities
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page t of 2
City of Port Towns@nd ~tTownaend WA88~88
Building and Community Development
BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
Call 385-2294 For Inspection
Site Address: 504 FOSTER ST
Parcel No: 974100601
Project:
Issued: 1H4/97
Lot: Block:
BLD96-00187
PERMIT
SPECIAL CONDITIONS /RESTRICTIONS
1 . See plans. Many framing elements required per engineer.
Vapor Barrier not speed but required using kraft faced insulation, 4 mil poly or vapor barrier
paint.
GENERAL CONDITIONS
1. A separate electrical permit is required for any electrical work.
2. Reinspections are required after any corrections are complete.
3. Final Inspections and approvals are required prior to occupancy.
4. All building permits expire if no progress has been made within six months, or if no inspections have
been made by the Building Department wthin one year. Call for at least one inspection per year to
keep your building permit active.
5. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2