Loading...
HomeMy WebLinkAboutBLD96-092CITY OF PORT TOWNSEND PERMTT & INSPECTION RECORD THIS CARD MUST BE POSTID AT CONSTRUCTION SITE CALL 385-2626 FOR INSPECTION Permit No: B -i~96-00092 Issued: 7/18/46 Receipt No. Date Job Addtess: 450 Fir Street - Hieh School Math/Scienceg Building Zot-ing: P-1 Nature of Work: Inc_tall Fire Snr nkler System Use of Building: ~h School Owner: Port Townsend School District /<50 Contractor: Foz Fire Prevention_ Inc. • ^. Fire Department Connection ^ Vault ^ Post Indicator Valve (the P.I.V. may be omitted, however, the double check valve assembly (DCVA) vault shall be fitted with tamper switch connected to the fire alarm system) Inspector Date ^ Piping, Bracing, Valve Installation ^ Check valves ^ Drain and drip device between FDC and Check Valve ^ Thrust Block Installations ^ Approval for Cover (except joints-prior to flow test) Inspector • ^ Hydrostatic Test (2 hour, 200 psi min.) Dafe t Tnanectiena & Teats fce~'d.) D O d a O O d O O Pressurized Air Test (24-hour dry test to 40 psi) Flush (with sieve) Flow Test(s) (Water pressure gauge reading:_ Dmp:~) Fire Alarm System Interne Test (Tamper and Flow) _ Seconds Sprinkkex head installatiast inspection Piping, bracing, system installation inspection Labeling (Control Valves, Drains, etc.) Sprinkler Box Contents (wrench, heads, etc.) Water Motor Alarm Fire Department Connection Adequate heat provision for piping protection Magetoi D~t~ O Contractor's Material 8c Test Certificate filed: As-built Plans filed: Fire Department Final Inspection Approval 4,;wceoi vsr. Public Works Department Final Inspection Approval /n~ctoi