Loading...
HomeMy WebLinkAboutBLD96-083City of Port Townsend Port Townsend?Wq 98368 t` Building and Community Development BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD 8~ APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address; 2333 SAN JUAN AVE Issued: 12/11/97 Parcel No: 958502301 Lot: Block: Project: BLD96-83R3 -CONTRACTOR/OWNER QUIMPER UNITARIAN UNIVERSALIST FELLOWSHIP PO BOX 1967 PnRT TnwnrRFNr) WA GR36R OWNE QUIMPER UNITARIAN UNIVERSALIST FELLOWSHIP PO BOX 1967 -PROJECT DESCRIPTIO Revision No 3: Enclose entry breezeway, fully on south side and partially on north side. City Contact: RNS Construction Type/Occ Use/Occ Load Type of work: NEW Construction Occupancy Type of use: COM Type 1: SN Group 1: A3 Load 1: Census Category: 319 Type 2: Group 2: load 2: Estimatetl Value: $2,500.00 Type 3: Group 3: Load 3: Zoning: R1 SI Code: Type 4: Group 4: Load 4: REQUIRED INSPECTIONS Inspection Date Inspector ,FRAMING Z ~~ r . ~ ~s~I~ FINAL GENERAL CONDITIONS 1. A separate electrical permit is required for any electrical work. 2. Reinspections are required after any corrections are complete. 3. Final Inspections and approvals are required prior to occupancy. 4. All building permits expire if no progress has been made within six months, or if no inspections have been made by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 5. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page i of 2 r/~ ~~ ~,~.~-q~l ,~.- ~ 3-R~ City of Port Townsend Po W ~~~d WA>,>~ Building and Community Development BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD 8 APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: 2333 SAN JUAN AVE Parcel No: 958502301 Project: QUIMPER UNITARIAN UNIVERSALIST FELLOWSHIP PO BOX 1967 Construct new church Issued: 7124/96 Lot: Block: BLD96-00083 WNER----- QUIMPER UNITARIAN UNIVERSALIST FELLOWSHIP PO BOX 1967 City Contact: JAN Construction TypelOcc UselOcc Load Type of work: NEW Construction Occupancy Type of use: COM Type 7: 5N Group 1: A3 Load 1: Census Category: 319 Tyce 2: Group 2: Load 2: Estimated Value: 5192,869.60 Type 3: Group 3: Load 3: Zoning: R1 - SI Code: Type 4: Group 4: Load 4: SPECIAL CONDITIONS/RESTRICTIONS APPLY -SEE LAST PAGE REQUIRED INSPECTIONS Call 48 hours before you dig for utility line locates 1-800-424-5555 Page t of 4 Inspection Date Inspector Inspection Date Inspector Insp-See Special Conditions FOUNDATION Insp-See Special Conditions -ReinforcementR~' Gi~~ ~ g r~~ ~ ~' EROSION & SEDIMENT CONTROL Insp-See Special Conditions ;GROUNDWORK PLUMBING FLOOR FRAMING ~ /~ / (FOOTINGS/SLAB ~~ (~ 1' ` -Girders Insp-See Special Conditions -Joists -Footings g 'S -Positive Connection -Forms ~ ~ -Treated Wood to Concrete -Reinforcement -Anchor Botts 8 Washers -LIFER ~ 2, ~ PLUMBING (Slab ~~~ ~' ?~ ~~z ~ -Rough-In ulation -Vents ~rior Footing -Traps • City of Port Townsend Bad lNater Street _- ~.. Pat Townsend, WA 88388 Building and Community Development BUILDER'S PERMIT AND INSPECTION RECORD ;~ THIS CARD 8 APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection ;~ J Site Address: 2333 SAN JUAN AVE Issued: 7124!96 ~ ~'. Parcel No: 958502301 Lot: Block: ~`"' Project: BLD96-000$3 ~.~ Inspection Date Inspector Inspection Date Inspector -Drains K7 /~. ~~ ~ -Baffles ~ ~ ~ ' . ~' S -Clean-Outs VAPOR BARRIER -Water Supply -Paint -Hose Bibs (Vacuum Break) ~ DRYWALL NAILING ~ ~+ ~~S -Barrier-Free Required _.~~ -Walls ~ ; ',-Pipe Insulation Ceiling i' -Pressure Reduction Valve -~"7 S DRAINAGE IMECHANiCAL "' -Engineered Plan ~ i Water Heater ~ Insp-See Special Conditions ~ --sh Air ~ - PARKING rce Specific Fan LANDSCAPING -Heat Source Equip. & Controls LIGHTING Insp-See Special Conditions -Equipment Controls FRAMING SANITARY SEWER -Walls WATER LINE -Ceiling HYDRANTS '-Roof FINAL -Windows Insp-See Special Conditions -Air Seaf Insp-See Special Condtions -In WaII.Penetrations Final-Building ~ ~~ A " Insp-See Special Conditions Final-Barrier Free Access !~ Insp-See Special Conditions Final-Plumbing INSULATION ~;/~L 7 ~~ ~ Final-MechanicaUHeating -Slab (R10) ,r Final-House Number !-Floor (R-30) ~` Final-Vapor Banier Cert. !-Ceiling (R-38) \ Final-Insulation Certificate ng (R-30) Final-Public Works Sign-off Call 48 hours before you dig for utility line locates 9-800-424-5555 `U ~~,~ Page z or a City of Port Townsend Port ownsend tWA 98368 Building and Community Development BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: 2333 SAN JUAN AVE Parcel No: 958502301 Project: Inspection Date Inspector Final-Fire Department Sign-off -Smoking/Non Area Signage I-Fire Extinguishers -Exit Lighting Issued: 7124198 Lot: Block: BLD96-00083 SPECIAL CONDITIONS /RESTRICTIONS 1 . Prior to any construction per engineered drainage plan: 1. Create 50' construction access ramp with 4" (min.) quarry spalls leading to 24th Street. All traffic is to use this access. 2. Stormwater detention basin must be constructed prior to clearing and grubbing and will serve as a siltation basin during construction. Provide field verification of infiltration capacity used in design calcs for infiltration basin. Perform test at location of detention basin. 3. Swale to detention basin constructed prior to building activity. All runoff to detention basin via this Swale. Note straw bale barrier requirement in Swale. INSPECTION REQUIRED FOR ABOVE REQUIREMENTS PRIOR TOANY CONSTRUCTION. 2. Separate permit required for Manual Fire Alarm System. 3. Test concrete for slump and strength (7 & 28 day breaks) by WABO certified special inspector~~- j i listed is WABO Register, Ed: 96-02, July 1, 1996. Copy of test results to Port Townsend L ~' ~ 2i (v q~ Building Department. Any deficiencies requiring correction are the responsibility of the owner or owner's agent. 4. Walls are ENER-GRID Wall System. See engineering for resteel placement, lintel design and top plate connections. 5. Prior to Mechancial inspection complete and submit as revision NREC requirements re: HVAC & WSVIAQ. 6. Truss plan to be submitted as revision prior to Framing inspection for Building Department approval. 7. Prior to Framing inspection, submit details of required landscape buffers at parking lot perimeter. 8. Prior to Final Drainage Inspection: Upon completion of final site grading and placing of gravel paving, the detention basin shall be re-excavated to remove all silt and debris. Re-excavation shall be to approximately 3" below final grade to allow placement of 3" topsoil prior to final hydroseeding. Inspection required. 9. Post occupant load per UBC. 10 . Interior lighting is perscriptive path per NREC. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 City of Port Townsend ~W~e-Sereet Port Townsend, WA 88368 Building and Community Development BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: 2333 SAN JUAN AVE Issued: 7!24/96 Parcel No: 958502301 Lot: Block: Project: BLD96-00083 GENERAL CONDITIONS 1. A separate electrical permit is required for any electrical work. 2. Reinspections are required after any corrections are complete. 3. Final Inspections and approvals are required prior to occupancy 4. All building permits expire'rf no progress has been made within six months, or'rf no inspections have been made by the Building Department within one year. Call for at least one inspection per year to keep your building permft active. ' 5. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. u Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4