Loading...
HomeMy WebLinkAboutBLD96-061City of Port Townsend ~°""""~"` Wort Townsend, wn role Building and Community Development BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD ~ APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: 303 FILLMORE ST Parcel No: 989706001 Project: Issued: Lot:1~3 Blodc:80 BLD96-00061 -CONTRACTOR/OWNE PAUL HESS P. O. BOX 814 PORT TOWNSEND, WA 98368 WNE CAROL MCGOUGH 303 FILLMORE 8TREET PORT TOWNSEND, WA 98368 Interior remodel of managers apartment for James House Bed and Breakfast: add second bath, thennai pane windows Il and soffit repair City Contact: JAN Construction Typa/aee UsWOce Load Type ofwwk TEN Conslrue6on ~u~ncY Type of use: MF Typa 1: SN Group 1: R3 Load 1: 4 Census Category: 434 Type 2: Group 2 Load 2 Estimated VaWe: 518,306.00 - Typa 3: Group 3: Load 3: ZonYg: R1 SI Cada: ~ Type 4: Group 4: Load 4: SPECIAL CONDITIONS/RESTRICTIONS APPLY -SEE LAST PAGE REQUIRED INSPECTIONS Inspection Date Inspector Inspection Date Inspector FLOOR FRAMING -Exhaust -Joists FRAMING v; 1 ~ Insp-See Special Conditions #~~ -Walls PLUMBING -Ceiling -Rough-In -Roof -Vents -Windows -Traps -Air Seal -Drains Insp-See Special Conditions ~3 -Clean-Outs -Wall (R-19) -Water Supply -Ceiling (R-30) -Pipe Insulation -Baffles Insp-See Special Conditions ~k,~ ' -Fill Exposed Cavities ~HANICAL .- ~ ~, VAPOR BARRIER ~ Ca1148 hours before you dtg for utility line locates 1-800-424-5555 PaB. 7 of 2 City of Port Townsend :"t ,,~,~.. Building and Community Development BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: 303 FILLMORE ST Parcel No: 888706001 Project: Inspection Date Inspector Insp•See Spedai Conditions ~q DRYWALL NAILING -Walls -Ceiling FINAL Final-Building Final-Plumbing Final-MechanicaUHeating Alt: Smoke Detectors Througout Issued: I.ot: ~! ~ Block: 60 BLD96-00061 SPECIAL CONDITIONS /RESTRICTIONS 1 . Pressure treated joists or layer of polyethylene between untreated wood and slab. 2. If water heater is new, check installation. At rough in plumbing determine ff pressure relief valve is required. 3. Check new skylite installation. Min..85 U value for replaced windows. Check soffd repair Framing, Inspt. 4. At Insulation Inspt. determine type of vapor bartier. GENERAL CONDITIONS 1. A separate electrical permit is required for any electrical woitc. 2. Reinspections are required after any corrections are complete. 3. Final Inspections and approvals are required prior to occupancy. 4. All building permits expire if no progress has been made within six months, or if no inspections have been made by the Buikdirp Department within one year. CaN for at least one inspection per year to keep your building permit alive. 5. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 wo.zaz