HomeMy WebLinkAboutBLD96-053
City of Port Townsend P«t T~awnWl1~936Y
Building and Community Development
BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD 8r APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIMf~
Call 385-2294 For Inspection
Site Address: 2305 LANDES ST
Parcel No: 958201901
Project:
Issued: 5/21/96
Lot: Block:
BLD96-0OOs~
-CONTRACTOR/OWNE
EVERSOLE CAROLS A
PO BOX 744
PORT TOWNSEND, WA 98388
WNE
EVERSOLE CAROLS A
PO BOX 744
PORT TOWNSEND, WA 88368
Construct new outbuilding wish guest quarters above garage
Cily Contact: JAN Conatruetion TypalOee Usa/Oee Load
Type of work NEW ConsWetion - 9ccupa~y
Type of use: SF Type 1: 5N Group 1: R3 Load 1:
Censua Category: 438 Type 2: Group 2 U1 Load 2:
Estimated Value: 580,847.81
Type 3. Group 3: Load 3:
Zoning: R1
r^ SI Code: Typa 4: Group 4: Load 4:
SPECIAL CONDITIONS/RESTRICTIONS APPLY -SEE LAST PAGE
REQUIRED INSPECTIONS
Inspection Date Inspector Inspection Date Inspector
GROUNDWORK PLUMBING ~'~~~ ? ~ -Girders ~Z-/p-(~~ ~2~
FOOTINGS/SLAB ~j ~~. ~ ~, , ~)oists
-Footings ~3 • -Positive Connection
-Setbacks .,~ ,, r,~~'~~ -Treated Wood to Concrete
-Stem Wall -Anchor Botts & Washers
-Forms PLUMBING
-Reinforcement -Rough-In
Slab -Vents
-Anchor Bolts -Traps
-Column Bases -Drains
-Interior Footing ~ (~ I -Clean-Outs
In.s See Special Conditions -Water Supply
RFRAMING ~t~b,' MECHANICAL
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Paw ~ or 3
City of Port Townsend """~"'""`
PoR Town~d, WA sp6s
Building and Community Development
BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD ali APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
Call 385-2294 For Inspection
Site Address: 2305 LANDES ST Issued: 6/21/99
Parcel No: 958201901 Lot: Block:
Pro)ed: BLD96-00053
Inspection Date Inspector Inspection Data Inspector
-Exhaust IZ~ IU~ ~{ ~ -Fire Rated Walls
-Water Heater -Fire Rated CelNrtgs
-Fresh Air -Braced Wall Panels
-Seismic Restraint DRAINAGE - 3
-Whole House Fan -Infiltration Trench
-18"A.F.F. FINAL NsE~ FLB~! ~v1.fY+ S ~ (9
FRAMING Final- uiltling
-Walls Final-Plumbing
-Braced Wail Panels g 13 Final-MechanicaUHeating
-Ceiling ` Final-Smoke Detectors
-Roof Final-Insulation Certificate
-Windows
-Air Seal ,p,,,,
~Q~Yk~ rp.I,E. 1/k1,U>i I~I~ ~, t~6~ ~i~
-In Wall Penetrations
-Fresh Air Intake (Window)
-Seismic Anchors
-Rafter Positive Connection
JNSULATION ' , ~~
-Floor (R-19)
-Wall (R-19)
-Ceiling (R-30)
-Baffles
VAPOR BARRIER ~[~rr( ~'t'~f)k9 f ~ ~,~r,~ py}~ ~~LS ~' GLI.I[ ~Q, y ~ P,
-4 Mil Poly .
DRYWALL NAILING , +
-Walls
-Ceiling
I
Ca1148 hours before you dig for utility line locates
1-800-4245555
Ppa2d3