HomeMy WebLinkAboutBLD96-030CITY OF PORT TOWNSEND
BUILDER'S PERMIT & INSPECTION RECORD
THIS CARD AND APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION T[ME.
CALL 355-2294 FOR INSPECTION
Permit Number BLD 96-00030 Issued 3-18-96 Treasurer's Number Receipt Date
Job Address 4377 Jackman Street Zoning R-IA Type VV=N Occupancy R-3/U-1
Nature of Work New House w/ Garage
Owner CamFbell Const.
1. GROUNDWORK:
2. FOOTINGS/SLAB: •~
•
3. FOUNDATION WALL: =-
Plumbing
Use. of Structure(s) Single Family Residence
Contractor Same as Owner
Inspector Date
Setbacks Forms / Resteel~ UFER~
/ InspectorDate ~r~"' • ~~
Fotms f! Resteel~Vents~ Crawl Access ,
Weather Pro/offing '~ Inspector ,• ~. Date7~
4. FLOOR FRAMING: ~ Girders V Joists Bridging Girder/Concrete-1/2" /~
Positive Connect Post/Girder & Pads Trtd Wood/Concrete Y
Anchor Bolts w/Washers Inspector•Date~f/`~
5. PLUMBING: Drains ~ Vents ~ Traps e/ Clean-Outs ~/ __"`7~~"~
Water Supply / Gas Supply Hose Bib(Vac. Break)_~
r rl
Inspector /~ Date~s'~ (~
~J~
6. MECHANICAL: Exhaust Ducts Inspector Date
7. FRAMING• Walls t./ Ceiling Goof ~ndows~
Page I of 2 pages
Campbell Construction
BLD96-00030
March 18, 1996
8. INSULATION:
9. DRYWALL NAILING:
10. DRAINAGE:
10. FINAL INSPECTION:
Air Seal
Fireblocking
Wall(R-19)
Baffles Vapor Barrier(Paint)
Floor(R-30 ))
V
Walls Ceiling v
Fresh Air(WinPt) '/
Inspector Dat~K
Ceilin (R-3 38)~
Inspector/ Date~~~,~_~~C~~
Inspector~/ Date~(~~~
Surface & Gutter Water to Jackman St. Ditch per Master Plan
r / /~ Inspector
Building '" Plumbing t/ Mech/Heatir~.g~
Smoke Detectors /
Insulation Certificate /
House Numbe~
Vapor Barrier Certificate~~
Inspector~/Date~(SfC~ (p
If Public Works and/or Fire Department improvements were required as a condition ofvour permit.
please call the Public GYorks Department at 38.i-7212 and ask them to sign o(f on vour proiect prior to
callingthe Building Department~r a final inspection. It is uniawjul to occupy a building before a
FINAL INSPECTION or CERTIFICATE OF OCCUPANCY is obtained.
*****All Building permits expire if no progress has been make within six months, or if no inspections
have been made by the Building Department within one year. Call for at least one inspection per year
to keep your building permit active. *****
Page 2 of 2 pages
•