Loading...
HomeMy WebLinkAboutBLD01-240Waterman & Katz BuiWiog 181 Quincy St., Suite 30I Port Tonxaeend, WA98368 Phone (360) 379-3208 Fax: (360) 385-7673 U CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Catl 385-2294 for Inspection Permit Number: BLDUI-240 Issued: 12/14/Ol Parcel Number: Job Address: 1610 Blaine Street Zoning: P_I Type: NC Occupancy: N/C Total Occupant Load: No Chance Nature of Work: Replace Light Fixtures, Sheetrock & Paint Ceiling of PTTV Owner: Port Townsend School District (PTTV) Contractor: Northwest Construction (leJj'Porter 385-tf833) GENERAL CONDITIONS APPLY -SEE LAST PAGE Separate Permit Rewired for Electrical Work contact Labor & Industries @ 417-2702 REOi1iRED INSPECTIONS APPROVED/DATE DEMOLITION All construction debris to be deposited in Jefferson County Landfill or other location in accordance with all local, state and federal laws DRYWALLNAII.ING Ceiling r ~r2,//D (I~J/ J `f' J `~ ~ / FINAL Electrical Sign-Off (Labor & Industries} Final -Lighting replace seven (7} existing fixtures Final -Building Call 48 hours before you dig for utility line locates 1-800-424-5555 Page I of 2 Permit kBLD07-240 GENERAL CONDITIONS ~~ 1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istratiod number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished 2. Temporary erosion and sediment cmrtrol (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 3852294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-o! way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspeMion is required after inspection report corrections sre completed. 6. The Building Depardnent is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca113852294. A i ~. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department Q 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424.5555 Page 2 of 2