CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Catl 385-2294 for Inspection
Permit Number: BLDUI-240 Issued: 12/14/Ol Parcel Number:
Job Address: 1610 Blaine Street Zoning: P_I Type: NC Occupancy: N/C
Total Occupant Load: No Chance Nature of Work: Replace Light Fixtures, Sheetrock & Paint Ceiling
of PTTV
Owner: Port Townsend School District (PTTV) Contractor: Northwest Construction
(leJj'Porter 385-tf833)
GENERAL CONDITIONS APPLY -SEE LAST PAGE
Separate Permit Rewired for Electrical Work contact Labor & Industries @ 417-2702
REOi1iRED INSPECTIONS
APPROVED/DATE
DEMOLITION
All construction debris to be deposited in Jefferson
County Landfill or other location in accordance with all
local, state and federal laws
DRYWALLNAII.ING
Ceiling r ~r2,//D (I~J/
J `f' J
`~ ~
/
FINAL
Electrical Sign-Off (Labor & Industries}
Final -Lighting replace seven (7} existing fixtures
Final -Building
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page I of 2
Permit kBLD07-240
GENERAL CONDITIONS ~~
1. Contractors working on this project are required to have a Labor & Industries contractor's
re¢istratiod number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished
2. Temporary erosion and sediment cmrtrol (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 3852294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-o! way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspeMion is required after inspection report corrections sre completed.
6. The Building Depardnent is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca113852294. A
i
~. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department Q 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.