Loading...
HomeMy WebLinkAboutBLD01-239Watefmm & KetzB~rildivg - 181 Quincy Strta, 8~rite 301 Pon 7cumaend, WA 96368 PMne: (360) 379.3208 Fu: (360) 379-69Ti tT, ~J CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11 3 85-2 2 94 for Inspection Permit Number: BLDO1-239 Issued: 02/11/02 Parcel Number: 001 023001 Job Address: 380 Jefferson Street Zoning: M-II B Type: VV=N Occupancy: B Nature of Work: Replace existin¢ guardrail and handrail aer attached eneineerine.. • • Owner: Port of Port Townsend Tenant: Wooden Boat Foundation Contractor: Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE REQUIRED INSPECTIONS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL See General Condition No 2 FRAMING Guardrail Handrail FINAL Final inspection may be done at Framing Inspection if all work is visible (uncovered) Property address Ca1148 hours before you dig for utility line locates I-800-424-SSSS Page 1 of 2 Peanit NBLDOI-239 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall tie installed.on-site and inspected prior to beginning construction; ca11 385-2 2 9 4. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for proteMion of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection caI1385-2294. A minimum of twenty-four hours notice is required Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the' Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in tfie field. Contact the Building Department Q 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2