Loading...
HomeMy WebLinkAboutBLD01-238[~ n City of Pat Towaend Waterman & Katz Building 181 Quincy Street Suite 301 Pmt Towrreend, WA98368 Phone (360)379-3208 Fax (360)379.6923 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO1-23g R-1 Issued: 02/14/02 Parcel Number: 988801907 Job Address: 1037 7ackson Street Zoning: R-11 Type: VV=N Occupancy: R-3/U-1 Total Occupant Laad: 2/3 Nature of Work: Construct Garage/Shoa and Attached ADU Owner: Seth Eric Roland Contractor: (Owner) - RASTRA walls to be constructed by certified RASTRA of America contractor GENERAL CONDITIONS APPLY -SEE LAST PAGE ~ G ~ ~r ~~~~ ~~~~ SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RE UIRED INSPECTIONS APPROVED/DATE TEMP EROSION & SDM'T CONTROL (See attached details, SUDP #O1-060 and General Condition #2) Silt Fence Drive OffMat GROUNDWORK PLUMBING Pressure Test Pipe Joints Exposed Pipe Bedding Hydronic Tubing ~~~y /~f (// FOOTINGS Setbacks ///~'/~ ~j Footings 2 ` ("..~ ~ / Forms ( , Relnf rcement s NGmn o m C g c Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 Building Permit IiHLD01-23gR-1 REQUIRED INSPECTIONS APPROVED/DATE FOUNDATION/RASTRA WALLS Rastra wall: //J,Gj p~ Reinforcement / Anchor Bolts Waterproofing/Damproofing ABWP Holdown Hardware @ garage SLAB R-10 Insulation Thickened Footings Radiant Heat Tubing FLOOR FRAMING Joists 4~ P~ ~~ Gf~l;1a 3 Blocking Positive Connection Beams Treated Wood to Concrete Anchor Bolts & W shers Radiant Heat Tubing PLUMBING: Hydronic Heat Tubing Rough-In (D-V-T & Clean Outs) ~~` ~ j~ Water Supply Water Hammer Arrestor @ dishwasher Gas Supply Hose Bibs (backflow protection required) Pipe Insulation (R-3) Pressure Reduction Valve if > 80 psi Water Heater -direct vent Seismic Restraint - 2 places Pressure relief valve drain to exterior; 6" - 24" above ground MECHANICAL Woodstove -installation ins ctions shall be on-site at time of _ Inspection Water eater Source Specific Fans .J Environmental Air Exhaust ducting, insulation ~~i2/~ C/ and terminus (located 3' from opening) Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 Building Permit #BI.DOl-238R-1 RFnrTIRFn INSPF.CTinNS APPROVED/DATE n LJ FRAMING: Engineered roof truss plan to be on-site @ time of inspection w~ls ~-- ~ ~ ' Stairs ~ l ~ / ~ Roof-engineered trusses/structural panels Blocking Seismic Anchors - H6 @ 32" o. c. Attic Venting -Ridge & Eave Ceilings Posts, beams & headers Windows -escape Windows -safety glazing Windows Ufactor - .65 or better. NFRC window sticker must be on windows at inspection time Fresh Air Intake (wall ports etter Fire Blocking Weep Screed INSULATION ~ Slab (R-10_) ~ ~~ Wall (R-22 Rastra ) Ceiling (R-30/R-38 ) Baffles Vapor Barrier: Paint DRYWALL NAILING Walls ~~~~0~ Ceilings Enclosed Usable Space under Stairs Garage/House Occupancy Separation FINAL LPG Public Works Sign-Off House Number - 5"minimum r~ i l \ ~ .r. f G~~C ~ 1 ! > ~7 ~ ~ - Plumbing ~ -~ Y~ - ( Mechanical Insulation Certificate Vapor Barrier Paint Certificate Handrail s/Guardrail s/Landings Smoke Detectors Final -Building Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 3 of 4 Building Prnnit #BLDOI-238R-1 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached deta7s). Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced waI[ panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and aII deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3; minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building DepartmenPs final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval. prior to making changes in the field. Contact the Building Department at 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Catl 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4 • City of Pml Towsend Waterman & Katz Building 181 Quincy Street Suite 301 Port Townsend, WA 98368 Phone (360) 379.32D8 Fax (360) 379-6923 CITY OF PORT TOWNSEND CONSTRUCTION PERNIIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDO1-238 Issued: 01/14/02 Parcel Number: 988801907 Job Address: 1039 Jackson Street Zoning: R-11 Type: VV=N Occupancy: RR=3 Total Occupant Load: 6 Nature of Work: Construct Single-family DwellinE Owner: Seth Eric Roland Contractor: (Owner) - RASTRA walls to be constructed by certified RASTRA of America contractor GENERAL CONDTTIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RE UIRED INSPECTIONS APPROVED/DATE TEMP EROSION & SDM'T CONTROL (See attached details, SUDP #O1-060 and General Condition #2) Silt Fence Drive Off Mat GROUNDWORK PLUMBING Pressure Test Pipe Joints Exposed Pipe Bedding Hydronic Tubing FOOTINGS Setbacks `~ /~i ~ ~~/~/,n ~ /-v/ ~/~a~G/ y~y Footings / Forms Reinforcement LIFER Column Footings Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 Building Permit #BLDOld38 RE UIRED INSPECTIONS APPROVED/DATE FOUNDATION/RASTRA WALLS Rastra Wall: ~y~Cp Z Reinforcement Anchor Bolts Waterproofing/Damproofing SLAB R-10 Insulation Thickened Footings Radiant Heat Tubing FLOOR FRAMING i ' O~ - ~`db~ sts- 6x 10 @ 4 Jo o. c. per engineertngw/hangers ~ Blocking n~ / ~ • !3. ~~ C~ Positive Connection Beams -engineered steel beam @ kitchen Treated Wood to Concrete Anchor Bolts & W eat Tubing ~gSSe zc 03 CC ~ ~~ PLUMBING: Hydronic Heat Tubing rr,, ~ g ~ 6 Rough-In (D-V-T & Clean Outs) ~J L/~ ~ ~~~~ Water Supply Water Hammer Arrestor @ clothes and dishwasher Gas Supply Hose Bibs (backflow protection required) Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi Water Heater -direct vent Seismic Restraint - 2 places Pressure relief valve drain to exterior; 6" - 24" above ground MECHANICAL Boiler -installation instructions shall be on-site at time of Inspection Woodstove HRV 6" smooth duct .Balancing dampers on inlet & exhaust ducts Flow grids on supply & return ducts Source Specific Fans Environmental Air Exhaust ducting, insulation and terminus (located 3' from opening) Call 48 hours before you dig for utility line locates I-800-424-5555 Page 2 of 4 • Building Permit pBLD01-238 RE UIRED INSPECTIONS APPROVED/DATE • • u FRAMING: W ll // ~•~ '7`~ 3h~s a s , . . Stairs t2,.b G~ 9• ~3,p2 Roof Rafters Blocking Seismic Anchors - Hl @ 4' o. c. Attic Venting -Ridge & Eave Ceilings Posts, beams & headers Steel Beam @ Kitchen Windows -escape Windows -safety glazing Windows Ufactor - .65 or better. NFRC window sticker must be on windows at inspection time Air Seal Fresh Air Intake (HRV) Door UFactor - .40 or better Fire Blocking Chimney Weep Screed I ~~lj„~~~ / t" INSULATION Slab (R-10_) Wall (R-22 Rastra ) Ceiling (R-30/R-38 ) Bathes Vapor Barrier: Paint DRYWALL NAILING Walls Ceilings //~/ Enclosed Usable Space under Stairs FINAL LPG Public Works Sign-Off House Number - 5"minimum ~ Plumbing ~ '~ < ~ "f ~ -7 r ~' ~=,~~ -~ Mechanical Insulation Certificate Vapor Barrier Paint Certificate Handrails/Guardrails/Landings Smoke Detectors Final -Building Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 Building Permit #BLDOI-238 GENERAL CONDITIONS 1. Contractors. working on this project are required to have a Labor & Industries contraMor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construMion entrance (see attached details). Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWPj require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required aker any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3; a~ minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Departments final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within su months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility tine locates 1-800-424-5555 Page 4 of 4