CITY OF PORT TOWNSEND
•
•
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDO1-23rJ Issued: 12/20/01 Parcel Number: 948-317-401
Job Address: 1510 Thomas Street Zoning: RR=I Type: VV=N Occupancy: R-3/U-1
Total Occupant Load: 412 Nature of Work: New Single-family Ihvelline w/ earaee
Owner: Cavette Construction Inc. Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMTTS REQUIRED:
Electrical -Contact Labor & Industries @ 360-427-2702
RF,nTITRF,T) TNSPF.CTTONS
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition #2
Silt Fence as needed
Drive Off Mat per attached details
FOOTINGS
Setbacks / ~/f
~ ~~~ (~
f~
Footings (
Forms
Reinforcement
Interior Footings
Porc 'ers
FOUNDATION
Stem Wall `/O
q,
Forms /n
`/ //
Reinforcement
Anchor Bolts w/ 2" x 2" x 3/16" squaze washers
Vents -15 required
Crawl Access
Beam Pockets
Alternate braced wall panel (ABWP) holdowns
@ garage door
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page I of 4
Building Pmnit #BLD01-235 ,
REQUIRED INSPECTIONS APPROVED/DATE
SLAB -Non-Structural ®garage
FLOOR FRAMING
Engineered BCI plan to be on-site @ time of
/ll~lO Z
inspection
Girders
Joists
Blocking
Shield under Posts
Positive Connection
Girder to Concrete
Beam Pockets
Treated Wood to Concrete
Anchor Bolts & Washers
Foundation Vents - IS required
PLUMBING:
Rough-In (D-V-T & Clean Outs)
Water Supply '
~~U~G f,(~S ~I y~' ~}Z
'
Water Hammer Arrestor @ clothes & 4
dishwasher
Hose Bibs (backflow protection, required)
Pipe Insulation - R-3
Pressure Reduction Valve if> 80 psi
Water Heater
R-10 under
Seismic Restraint - 2 places
18" A.F.F.
Pressure relief valve drain to exterior
MECHANICAL
Electric Forced Air
Manufacturer's Installation Instructions to be /
on-site @ time of inspection ~~
~
/J
Ducts & Duct Insulatio~t -Supply/fresh air
ducts in conditioned space: R-9; heating ducts in
unconditioned space: R-8
Whole House Ventilation
HVAC Integrated Fresh Air
7" Smooth Duct minimum
Terminal Element - 8"
Clock timer on furnace fan
Other than motorized damper requires letter
of certification for flow rates
See neat a e
Cai148 hours before you dig for utility liue locates
1-800-424-5555
Page 2 of 4
LJ
Building Pemtit #HLDOI-235
i
•
RF.nTITRF.>> TNSPECTIONS APPROVED/DATE
MECHANICAL continued
Source Specific Fans
Environmental Air Exhaust ducting (with
backdraft damper), insulation (R-4) and terminus
(located 3' from opening)
FRAMING
Walls
~,-~
Alternate Braced Wall Panels ~~J ~~
Roof - Engineered truss plan to be on-site at
time of inspection
Attic Venting -ridge & eave
Ceilings
Posts, beams & headers
Windows -egress
Windows -safety glazing
Windows Ufactor - .40 or better
NFRC window sticker must be on
Windows, skylights & doors at inspection time
Air Seal
Skylights - .58 or better
Doors Ufactor - .20 or better
Truss Positive Connection.
Fire Blocking
Weather Resistive Barrier
INSULATION
Floor (R-30 )
Wall (R-19)
~/ ~~~i-
Ceiling (R-38 )
Baffles
Vapor Barrier; paint
Crawl space - 6 mil black poly
DRY WALL NAILING
walls
/
~L /fQ
Ceiling ~
~
fib
Gazage/House Occupancy Sepazation
Interior Braced Wall Panels
Ca1148 hours before you dig for utility line locates
I-800-424-SSSS
Page 3 of 4
Building Pm~tit #BIDOI.233
FINAL
Public Works Sign-Off- no occupancy allowed
prior to completion of infrastructure
House Nuttaber - 5 "numbers
Plumbing
Mechanical -Ventilation Certification for
Integrated System
Insulation Certificate
V. B. Paint Certificate
Smoke Detectors
Final -Building
~/2~'~DZ
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
reeistration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-sitd and inspected
prior to beginning construction; caI1385-2294. Measures shall include installation. of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt
and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once .
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your projeM until Public Works
requirements have been completed and inspected. For Public Works inspection call'3852294; a•
minimum of twenty-four hours notice is required, public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections and. Certificate of Occupancy are required PRIOR to occupancy.
8. AU building permits ezpire if no progress has been made within siz months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require review and approval rior to making changes in the field. Contact. the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.