Loading...
HomeMy WebLinkAboutBLD01-235W~teraau & Keh Bu9ding 131 QuMry Street, Suae 391 Pat 7ewlueud. WA 9&163 Pbone: 963379-3233 Bu36P333-7675 CITY OF PORT TOWNSEND • • CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDO1-23rJ Issued: 12/20/01 Parcel Number: 948-317-401 Job Address: 1510 Thomas Street Zoning: RR=I Type: VV=N Occupancy: R-3/U-1 Total Occupant Load: 412 Nature of Work: New Single-family Ihvelline w/ earaee Owner: Cavette Construction Inc. Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMTTS REQUIRED: Electrical -Contact Labor & Industries @ 360-427-2702 RF,nTITRF,T) TNSPF.CTTONS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL See General Condition #2 Silt Fence as needed Drive Off Mat per attached details FOOTINGS Setbacks / ~/f ~ ~~~ (~ f~ Footings ( Forms Reinforcement Interior Footings Porc 'ers FOUNDATION Stem Wall `/O q, Forms /n `/ // Reinforcement Anchor Bolts w/ 2" x 2" x 3/16" squaze washers Vents -15 required Crawl Access Beam Pockets Alternate braced wall panel (ABWP) holdowns @ garage door Call 48 hours before you dig for utility line locates 1-800-424-5555 Page I of 4 Building Pmnit #BLD01-235 , REQUIRED INSPECTIONS APPROVED/DATE SLAB -Non-Structural ®garage FLOOR FRAMING Engineered BCI plan to be on-site @ time of /ll~lO Z inspection Girders Joists Blocking Shield under Posts Positive Connection Girder to Concrete Beam Pockets Treated Wood to Concrete Anchor Bolts & Washers Foundation Vents - IS required PLUMBING: Rough-In (D-V-T & Clean Outs) Water Supply ' ~~U~G f,(~S ~I y~' ~}Z ' Water Hammer Arrestor @ clothes & 4 dishwasher Hose Bibs (backflow protection, required) Pipe Insulation - R-3 Pressure Reduction Valve if> 80 psi Water Heater R-10 under Seismic Restraint - 2 places 18" A.F.F. Pressure relief valve drain to exterior MECHANICAL Electric Forced Air Manufacturer's Installation Instructions to be / on-site @ time of inspection ~~ ~ /J Ducts & Duct Insulatio~t -Supply/fresh air ducts in conditioned space: R-9; heating ducts in unconditioned space: R-8 Whole House Ventilation HVAC Integrated Fresh Air 7" Smooth Duct minimum Terminal Element - 8" Clock timer on furnace fan Other than motorized damper requires letter of certification for flow rates See neat a e Cai148 hours before you dig for utility liue locates 1-800-424-5555 Page 2 of 4 LJ Building Pemtit #HLDOI-235 i • RF.nTITRF.>> TNSPECTIONS APPROVED/DATE MECHANICAL continued Source Specific Fans Environmental Air Exhaust ducting (with backdraft damper), insulation (R-4) and terminus (located 3' from opening) FRAMING Walls ~,-~ Alternate Braced Wall Panels ~~J ~~ Roof - Engineered truss plan to be on-site at time of inspection Attic Venting -ridge & eave Ceilings Posts, beams & headers Windows -egress Windows -safety glazing Windows Ufactor - .40 or better NFRC window sticker must be on Windows, skylights & doors at inspection time Air Seal Skylights - .58 or better Doors Ufactor - .20 or better Truss Positive Connection. Fire Blocking Weather Resistive Barrier INSULATION Floor (R-30 ) Wall (R-19) ~/ ~~~i- Ceiling (R-38 ) Baffles Vapor Barrier; paint Crawl space - 6 mil black poly DRY WALL NAILING walls / ~L /fQ Ceiling ~ ~ fib Gazage/House Occupancy Sepazation Interior Braced Wall Panels Ca1148 hours before you dig for utility line locates I-800-424-SSSS Page 3 of 4 Building Pm~tit #BIDOI.233 FINAL Public Works Sign-Off- no occupancy allowed prior to completion of infrastructure House Nuttaber - 5 "numbers Plumbing Mechanical -Ventilation Certification for Integrated System Insulation Certificate V. B. Paint Certificate Smoke Detectors Final -Building ~/2~'~DZ GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-sitd and inspected prior to beginning construction; caI1385-2294. Measures shall include installation. of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once . construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your projeM until Public Works requirements have been completed and inspected. For Public Works inspection call'3852294; a• minimum of twenty-four hours notice is required, public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections and. Certificate of Occupancy are required PRIOR to occupancy. 8. AU building permits ezpire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval rior to making changes in the field. Contact. the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4