Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BLD01-234
were~n~xeezaww~¢ isi Q~y saeec su;~ 3oi Pat 7otw+md WA 98368 Phone: (360) 379-3208 Faz: (360) 385-76)5 • CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO1-234 Issued: 12/31/01 Parcel Number: 957 902103 Job Address: 1093 30th Street Zoning: RR=II Type: V_N Total Occupant Load: 7/2 Occupancy: R-3 /U-1 Nature of Work: Construct Sinele family residence with attached earaee Owner; Christouher & Mareie Lvon Contractor: Same as Owner ****All elements of engineering including holdowns, framing, nailing and other engineered connections require inspection prior to cover**** GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUH2ED: Electrical -Contact Labor & Industries @ 360-417-2702 REOiJIRED INSPECTIONS APPROVED/DATE TEMP EROSION & SDM'T CONTROL See Genera! Condition No. 2 Silt Fence as needed Drive OffMat to restrict sediment from leaving the site FOOTINGS Setbacks Footings /~~/D Forms l `` Reinforcement Interior Footings Porch Piers iJFE~R C~ Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 Pemtit A BLDDI-234 ' REQUIRED INSPECTIONS APPROVED/DATF. FOUNDATION Stem Wa11- CMiJ Forms r/ n /~ ! 11! !/~ ~6 Reinforcement with bond beam ~ C I„ly Anchor Bolts & Washers Vents -18 required Crawl Access Beam Pockets or Post w/positive connection post to fdn, wall Engineered Holdowns SLAB Setbacks n~~~ `~ D '~f ~~~~/~ Forms Monolithic Pour Reinforcement Interior Footings Anchor Bolts Engineered Holdowns FLOOR FRAMING Joists ~~ Double Joists @ Bearing ~ Girders Radiant Heat Tubing Blocking Shield under Posts Positive Connections Girder to Concrete Beam Pockets Treated Wood to Concrete Anchor Bolts and Washers PLUMBING: Rough-In (D-V-T & Clean outs) ~~ Water Supply ~ ~//~o ~// h` Water Hammer Arrestor @ clothes and dishwasher / ~ Hose Bibs (backflow protection required) Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi Water Heater R-10 under 18" A. F. F. Seismic Restraint - 2 places Pressure relief valve drain to exterior, terminate 6" - 24" above ground Call 48 hours before you dig for utility line locates I-800-424-5555 Page 2 of 4 Pamil # BLDOb2i4 RFCITTTRF.TI TiVCPRI"Ti[)NC APPROVED/DATE MECHANI Boiler- insta on instructions shall be on-site at t ~ eCtlon Whbte Ouse Fan Source Specific Fans / ~/ ,~ / Environmental Air Exhaust ducting (w/ backdraft dampers), ~ ~ ~ / / !/ insulation (R-4) and terminus (located 3' from opening) f/ c FRAMING: Walls ~X~ ~~~n ~ /~ ~/~i //,/' Engineered shear walls `~~ Treated Wood to Concrete Ceiling/Roof Rafter Positive Connection Roof Venting -ridge & soffit Windows -escape Windows -safety glazing Skylights U-factor - .68 or better Windows U-factor - .60 or better NFRC window sticker must be on windows, skylights and doors at inspection time Air Seal Fresh Air Intake (Window Ports) Doors U-factor - .40 or better ire Blocking ~~~ ©Z Bather Resistive Barrier CHIMNEY Termination INSULATION Floor - (R=19 ) Walls-(R=19) Ceiling - (R=30 ) Bathes Vapor Barrier: paint 6 mil black poly in crawl space DRY WALL NAILING Wallsg Ceilin 1/~~/d~- ~+ ~(.~ Garage/House Occupancy Separation Engineered Shear Walls Enclosed Usable Space under Stairs f • Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 PaetiIRBLD01-33M1 •- FINAL Public Works Sign-Off House Numbers - 5"minimum Plumbing MechanicaVHeating Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors Final -Building (~G Tl~k-e f~i~JS' L ~~~~o ~/ 1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties: 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels. (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspeMions. 5. Re-inspection is required after inspeMion report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works approval must 6e received prior to scheduline the Buildine Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval riot to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4