Loading...
HomeMy WebLinkAboutBLD01-233ware,~~x,~~ia,~ psi ~r street, suu 30( PoM1 Towmmd, WA 98368 Phone: (360) 379-3208 Fmr. (360) 385-7675 i CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO1-233 Issued: 12/27/01 Parcel Number: 968-500-065 Job Address: 4166 Jackman Street Zoning: Lvnnesfield PUD Type: VV=N Occupancy: R-3 Total Occupant Load: 4/2 Nature of Work: Construct sinele-family residence w/ ag rage Owner: Harold & Edie Erickson Contractor: Camabell Construction GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 • RE UIRED INSPECTIONS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence Drive Off Matto restrict sediment from leaving the site FOOTINGS Setbacks G ~~~bZ- Footings Forms Reinforcement Interior Footings Porch Piers ( - `~/,lJY1~GLvY-~Gf T,/ ~~J/ UFER [! ~ Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 Pmnil # BLDOI-2i3 REQUIRED INSPECTIONS APPROVED/DATE FOUNDATION Engineered Holdawns Stem Wall Forms Reinforcement Beam Pockets Anchor Bolts w/ 2" x 2" x 3/16" washers Foundation Vents -10 required Crawl Space Access / //~D lG/ FLOORFRAMING -Engineered BCI joist plan shall be on-site at time of inspection Girders ~Z Z/O Z Joists Blocking Shield under Posts Positive Connection Girder to Concrete Beam Pockets Treated Wood to Concrete Anchor Bolts w12" x 2"x 3116" washers Crawl Space Access PLUMBING: Rough-In (D-V-T & Ctean outs) ~~~ /D !/ ' Water Supply J '~~~ Gas Supply -t~ Water Hammer Arrestor @ clothes washer and dishwasher Hose Bibs (backflow protection required) Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi Water Heater R-10 under I8" A. F. F. Seismic Restraint - 2 places Pressure relief valve drain to exterior, terminate 6" - 24" above ground 1 J Ca1148 hours before you dig for utility line locates • I-800-424-5555 Page 2 of d Pmnit#HLD01.233 REQUIRED INSPECTIONS APPROVED/DATE • • MEC ICAL G Fve Whole House Fan -Utility Room !~ /~~~ y, Source Specific Fans !! / !/ Environmental Air Exhaust ducting (w/back draft ! dampers), insulation (R-4) and terminus (located 3' from opening into building) FRAMING Engineered Shear Walls Walls ~/J~~ ~~ Ceilings Roof Rafter Positive Connection Attic Venting - eave & ridge Windows -escape Window safety glazing Windows Ufactor - .45 or better NFRC sticker must be on windows, doors & skylights at inspection time Air Seal Fresh Air Intake (Window or Wall Ports) Doors U-Factor - .40 or better Skylights - .68 or better Fire Blocking Weather Resistive Barrier CHIMNEY Termination INSULATION Floor (R=25) l j i/~~1/ ~~ ~ ~GZ~, Walls (R=19) j Ceiling (R-38 attic/R-30 vault) Baffles Vapor Barrier: paint Crawl space - 6 mil black poly DRY WALL NAILING Walls Ceiling Enclosed Usable Space Under Stairs Engineered Interior Shear Walls Garage/House Occupancy Separation • Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 r~x~,no~.zas FINAL Public Works Sign-Off LPG House Numbers Plumbing MechanicaVHeating Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors Final -Building 5~iz~o z 3~Zg167~ 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number snd a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled constrnMion entrance (see attached details): Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspeMion call 385-2294. A minimum of twenty-four hours notice is required. Public Works auoroval must be received urior to scheduling the Building Deuartment's final inspeMion. Final InspeMions are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspeMion per year to keep your building permit active. Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 4 of 4 • Permit k BLI70I-233 - 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 5 of 4