Loading...
HomeMy WebLinkAboutBLD01-229Watnmm & Katz Building 181 Qtinry Street, Suite 301 Pon Towuutd, WA 98368 Phoce: (360) 379-3208 Fax: (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERNIIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11 3 85-22 94 for Inspection Permit Number: BLDO1-ZZ9 Issued: 11/13/01 Parcel Number: 989 704 005 Job Address: 918 Water Street Zoning: C-HI Type: V_N Occupancy: M/R-3 Nature of Work: Remove existing cedar shingle roofine on historic building, and realace with like. Owners: Gerald & Kelly Anthony GENERAL CONDITIONS APPLY -SEE LAST PAGE • r~ LJ RF.(li1TRF.TI TNCPF.fTTnNC Contractor: All About Buildine 385-2139 APPRC)VFT)/i)ATF, DEMOLITION All construction debris to be deposited in Jefferson County Landfill or other location in accordance with all local, state and federal laws. SEDIMENT CONTROL Sweep rights of way during construction as needed PEDESTRIAN PROTECTION -Inspection required prior to begrmrrng work Provide protection as needed per UBC SHEATHING Spaced sheathing boards min. I" x 4" installed per UBC Chapter 15 Table 15B-2 ROOFING Install all roofing material per manufacturer's specifications and UBC Chapter I5. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Permit %BLSJ01239 FINAL Building Numbers - 5" numbers of contrasting color posted near main entrance of building and visible from street per City Ordinance for both downstairs ~ l~~ n mercantile space and upstairs dwelling unit (Apt. A) IJ,/ Q`~//' Final -Building ENERAL CONDTTION 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. If temporary erosion and sediment control (TESC) measures are required, they shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silk fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and alt deficiencies noted by required • inspections. 5. Re-inspection is required after inspection report corrections are completed. b. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval mustbe received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non- residential project. 8. All building permits ezpire if no progress has been made within sia months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 u