HomeMy WebLinkAboutBLD01-229Watnmm & Katz Building
181 Qtinry Street, Suite 301
Pon Towuutd, WA 98368
Phoce: (360) 379-3208 Fax: (360) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERNIIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11 3 85-22 94 for Inspection
Permit Number: BLDO1-ZZ9 Issued: 11/13/01 Parcel Number: 989 704 005
Job Address: 918 Water Street Zoning: C-HI Type: V_N Occupancy: M/R-3
Nature of Work: Remove existing cedar shingle roofine on historic building, and realace with like.
Owners: Gerald & Kelly Anthony
GENERAL CONDITIONS APPLY -SEE LAST PAGE
•
r~
LJ
RF.(li1TRF.TI TNCPF.fTTnNC
Contractor: All About Buildine
385-2139
APPRC)VFT)/i)ATF,
DEMOLITION
All construction debris to be deposited in Jefferson
County Landfill or other location in accordance with
all local, state and federal laws.
SEDIMENT CONTROL
Sweep rights of way during construction as needed
PEDESTRIAN PROTECTION -Inspection
required prior to begrmrrng work
Provide protection as needed per UBC
SHEATHING
Spaced sheathing boards min. I" x 4" installed per
UBC Chapter 15 Table 15B-2
ROOFING
Install all roofing material per manufacturer's
specifications and UBC Chapter I5.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Permit %BLSJ01239
FINAL
Building Numbers - 5" numbers of contrasting color
posted near main entrance of building and visible
from street per City Ordinance for both downstairs ~ l~~ n
mercantile space and upstairs dwelling unit (Apt. A) IJ,/ Q`~//'
Final -Building
ENERAL CONDTTION
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. If temporary erosion and sediment control (TESC) measures are required, they shall be installed on-site
and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silk
fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept
free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and alt deficiencies noted by required •
inspections.
5. Re-inspection is required after inspection report corrections are completed.
b. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
minimum of twenty-four hours notice is required. Public Works approval mustbe received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non-
residential project.
8. All building permits ezpire if no progress has been made within sia months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
u