Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BLD01-227
w.m~aw~ewame ~a~ QwMr spa, s~ 30~ 3brt rowmrnd. wa 98368 19wne: (360) 3793208 Fa (360) 383.7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO1-227 Issued: 11/27/01 Parcel Number: 988802305 Job Address: 1040 Tavlor Street Nature of Work: Construct New Foundation Owner: Jim & Jean Roueh Zoning: RR=II Type: V N Occupancy: R-3 Occupant Load• NC Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE NOTE: FOUNDATIONPERMIT ONLY RF.nTTTRF.n TN~PF,('.Ti()NS r~ L • APPROVED/DATE TEMP EROSION & SDM'T CONTROL See General Condition No. 2 -install on-site as needed during construction to prevent sediment from leaving the site and to eliminate tracking of soil onto the street FOOTINGS Setbacks /O/ ~ Z/~ Footings Forms Reinforcement Porch footings FOUNDATION Stem Wali Forms / ~~/~©~ Reinforcement Anchor Bolts w/ 2" x 2" x 3/16" square washers Vents Crawispace access Girder to Concrete '` Beam Pockets -- Positive Connection Treated Wood to Concrete Shield under Posts 6 mil black poly Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Permit # HLDDL2rl FINAL House Number -check for 5" numbers Smoke Detectors -update existing house per UBC Final -building /~/ ~OZ GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept tree of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, hotdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your projeM until Public W orks requirements have been completed and inspected For Public Works inspection call 385-2244. A minimum of twenty-four Lours notice is reauired. Public Works approval must be received prior to scheduling the Building Department's final inspection. Final Inspections sre required prior to occupancy; a Certificate of Occupancy is required fora non- residential project. $. All building permits expire if no progress has been made within siz months, or if no inspections are dog by the Building Department within one year. Csll for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Obtain revisions from the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2