Loading...
HomeMy WebLinkAboutBLD01-225Waterman & Katz 187 Quinry Street Swle 301 Port Townsend, WA 98368 Phone (360) 379-3208 Fex (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION STTE Ca11385-2294 for Inspection Permit Number: BLDOl-225 Issued: 11/7/01 Parcel Number: 999100114 Job Address: 2276 Towne Point Ave. Zoning: R_II Type: VV=N Occupancy: R-3/U-1 Total Occupant Load: No Chance Nature of Work: Install structural supports for patio cover. Owner: Bvron Painter Contractor: Same as Owner GENERAL CONDITIONS APPLY - 5EE LAST PAGE REQUIRED INSPECTIONS APPROVED/DATE FOOTINGS i Epoxy post base to existing concrete slab. /FRAMING All framing members subject to water splash or in contact with concrete to be pressure treated or wood of natural resistance to decay f / ~ ~~ ~ ,~- ~ ~I f Posts (,` ~ 7 - I Beam 4X8 Positive Connection Post-to-Pier Post-to-Beam Rafter to beam Treated Wood to Concrete Blocking FINAL House Numbers posted {minimum 5") / /~ ~ ~/' ~~ Smoke Detectors throughout existing construction per 1997 L / / UBC / Deck -Final Call 48 hours before you dig utility line locates: 1-800-424-5555 Page 1 of 2 r~ a at~oiazs GENERAL CONDITIONS ~. 1. ContraMors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently. stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. A11 building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the Geld. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig utility line locates: 1-800-424-5555 Page 2 of 2