HomeMy WebLinkAboutBLD01-225Waterman & Katz
187 Quinry Street Swle 301
Port Townsend, WA 98368
Phone (360) 379-3208 Fex (360) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION STTE
Ca11385-2294 for Inspection
Permit Number: BLDOl-225 Issued: 11/7/01 Parcel Number: 999100114
Job Address: 2276 Towne Point Ave. Zoning: R_II Type: VV=N Occupancy: R-3/U-1
Total Occupant Load: No Chance Nature of Work: Install structural supports for patio cover.
Owner: Bvron Painter
Contractor: Same as Owner
GENERAL CONDITIONS APPLY - 5EE LAST PAGE
REQUIRED INSPECTIONS
APPROVED/DATE
FOOTINGS
i Epoxy post base to existing concrete slab.
/FRAMING
All framing members subject to water splash or in contact
with concrete to be pressure treated or wood of natural
resistance to decay f
/ ~ ~~ ~ ,~-
~ ~I
f
Posts (,`
~ 7 - I
Beam 4X8
Positive Connection
Post-to-Pier
Post-to-Beam
Rafter to beam
Treated Wood to Concrete
Blocking
FINAL
House Numbers posted {minimum 5")
/ /~
~ ~/' ~~
Smoke Detectors throughout existing construction per 1997 L
/
/
UBC /
Deck -Final
Call 48 hours before you dig utility line locates: 1-800-424-5555
Page 1 of 2
r~ a at~oiazs
GENERAL CONDITIONS
~.
1. ContraMors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently. stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. A11 building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the Geld. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig utility line locates: 1-800-424-5555
Page 2 of 2