Loading...
HomeMy WebLinkAboutBLD01-224Waterman S Kmz auildmg i st Q~v so-ee~, swu 3oi PM Tounve~~d WA 98368 Phone: (3W) 379-3208 Faz: (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOI-224 Issued: 11/05/01 Parcel Number: 948 304 603 Job Address: 735 19th Street Zoning: R_II Type: VV^N Occupancy: R_3 Nature of Work: Remove existing roofing on house, install sheeting, felt and composition shingles, provide exhaust and attic ventilation. Garage re-roof not included in permit as sheeting not being reulaced. Owner: Alitva Townsend Contractor: Affordable Services 385-2724 GENERAL CONDITIONS APPLY -SEE LAST PAGE RF.nIIIRED INSPECTIONS • n LJ APPROVED/DATE DEMOLITION All construction debris to be deposited in Jefferson County Landfill or other location in accordance with all local, state and federal taws- SHEATHING Nailing requires 8d @ 6" o.c. edges & 12" o.c. field or 1 '/a" staples @ 6" o.c. edges and field. ROOF VENTING Exhaust and Attic Vents Net free ventilation area shall not be less than 1 square foot per 150 square feet of the area of the space venti]ated, unless 50% of the required vent opening area is provided in the upper portion of the roof and therefore the rate may be reduced to 1 square foot of venting to 300 square feet of area vented. Openings shall be covered with corrosion resistant'/s" mesh. ROOFING Install all roofing material per manufacturer's specifications and UBC Chapter 15. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Pemti[ kBLD01-714 Smoke detectors required per 1997 UBC (battery powered OK) House Numbers - 5" numbers of contrasting color posted near main entrance of house and visible from street per City Ordinance /~~ ~ j~ Final -Building S ~ ~(-'/l[/ ENERAL CONDTTION 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. If temporary erosion and sediment control (TESC) measures are required, they shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. i 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. • 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenri-four hours notice is required, Public Works auaroval must be received prior to scheduline the Buildine Department's final inspection. 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 4. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 374-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. C~ Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2