Loading...
HomeMy WebLinkAboutBLD01-220Waterman &. Kau Buildiry{ 181 Quinry Slree4 Suite 301 Port 7ownaend, WA 98368 Phone: 360379J208 Fa:360J85-7675 CITY OF PORT TOWNSEND C~ U CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOI-220 Issued: 11/16/01 Parcel Number: 948 305 802 Job Address: 1630 Gise Street Zoning: R-II Type: V_N Occupancy: RR=3 Total Occupant Load: 4 Nature of Work: Set New Manufactured Home Owner: Evelvn Brewer Contractor:Washineton Home Center WAINS#0078 ****Installer: See Attached Installer Tae**** GENERAL CONDITIONS APPLY -SEE LAST PAGE ~,n ~t rssU~ SEPARATE PERMITS REQUIRED: l///~/01~ Electrical -Contact Labor & Industries @ 360-417-2702 ~ NOTE: Set-up manual shall be on-site at time of inspection. RRf1TiTRRT) TNCPFC'TTONC APPROVFn/nATF, TEMP EROSION & SEDIMENT CONTROL See general condition #2 Silt Fence as needed Drive Off Mat to prevent sediment from leaving the site FOOTINGS/SLAB Setbacks Forms Reinforcement FLOOR FRAMING (prior to skirting) Anchors ~~ /~~~ ^ n // c ,L % ~ / Steel Support Piers -Load-stamped and installed /~ / / / per marn~facturer's installation manual; clearance of IS"mire from Irnvest point of I-beam and the ground or footing for min. of 75 % of area under home w/ I2 "min. elsewhere unless installation marmal specifies; otherwise area around home graded to provide runoff away from home. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page I of 3 PermB gBLD03-220 REOUIRF.D iNCPF('Ti(lNC ~uunnvcnrn~m>c ' ------ PLUMBING: ~V •L/L/LA1L' Water Supply -Main shut-off valve (port or ball valve) installed in water supply piping prior to connection to / ~Z(l / 6 home, min. '/. "diameter, same as supply pipe Pressure Reduction Valve if> 80 psi Hose Bibs (backflow protection required) Pipe Insulation -Outside & in crawl space Pressure Test -100 p.s. i. for 15 minutes Pressure relief valve drain - to exterior of skirling, exhaust dawmvard between 6"and 24"above ground Drainage Piping -sloped min. /J.' per foot MECHANICAL Ducts & Duct Insulation Dryer Exhaust -vented to outside. Extension into crawl ,~ n ~~Zr1~~2 (l+~''/ r space rewires venting through skirting with no dips; follow dryer manufacturer's instructions; total combined length of ducting not to exceed 14' w/ 2-90° elbows VAPOR BARRIER 6 mil black poly ground cover (not required where area C ~ ^~O~ c~ under home is concrete slab floor with a minimum thickness of 3-%z inches) FINAL Public Works Sign-Off Electrical (L & I) Sign-Off House Number -minimum 5" numbers Plumbing Mechanical Final -Building No Notes or gaps greater than %"allowed in skirting. Crawl space ventilation per installation manual @ 1/150 (10 required), located close to corners, on at least two opposing sides for cross ventilation. Crawl space access must provide access to all areas under home, minimum 18"x 24 ", covered with virryl, pressure treated wood or metal. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 3 Permit #BLDOl-220 GENERAL CONDITIONS i 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. • 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Ca11 for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3 n