Loading...
HomeMy WebLinkAboutBLD01-216 _{ CITY OF PORT TOWNSEND way ~ xav a~aa~ ~s~ Query sou, suu 30~ PoM1Towrue~d, WA 98368 Pfione: (360)379-3206 Fax: (360)385-7675 CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION STTE Call 385-2294 for Inspection Permit Number: BLDO1-2168-2 Issued: 10/31/02 Parcel Number: 001044010 Tob Address: 2522 Hastines Avenue_ Zoning: C-I/MiJ Nature of Work: Revision #Z:Remodel shell to heated space Type: V_N Occupancy: R-3 Owner: John Paul Davies and Erin Lamb Contractor: caner GENERAL CONDITIONS APPLY -SEE LAST PAGE Occupant Load• 1 NOTE: BUILDING SHELL & FOUNDATION UNDER SEPARATE PERMITS RE UIRED INSPECTIONS L_. APPROVED/DATE TEMPORARY EROSION & SEDIMENT CONTROL See General Condition No. Z -install on-site as needed during construction to prevent sediment from leaving and site and to eliminate tracking of soil onto the street. PLUMBING Rough-In (D-V-T & Clean-Outs) Water Supply Water Hammer Arrestor @ clothes washer Hose Bibbs (backflow protection required) Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi Water Heater Seismic Straps @ 1/3 points Pressure relief valve drain to exterior, terminate 6" - 24" above ground MECHANICAL Whole House Fan Laundry Fan Environmental Air Exhaust ducting (w/ backdraR dampers), insulation (R-4) and terminus (located 3' from openings) Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 Permit#BIDOI-2I6R-2 RE UIRED INSPECTIONS APPROVEDiDATE FRAMING Walls Ceiling. Headers Roof Venting Windows -escape Windows -safety glazing Windows U-factor - .40 or better NFRC sticker must be on windows and doors at inspection time Doors Ufactor - .20 or better Air Seal Roof INSULATION Floor (R-30) Walls (R-19) Ceiling (R-38) Vapor Barrier required: faced balls, V. B. paint, etc Baffles DRYWALL Walls Ceiling FINAL Health Department -septic approval House number -check for 5" numbers Smoke Detectors Plumbing Mechanical Vapor Barrier Paint Certificate Insulation Certificate DecklStairs/HandrailslGuazdrails Final -building GENERAL 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 2 of 3 Permit#BLDOI-]IQt-2 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled • construction entrance. Adjacent rights-of--way shall be kept free of dirt & debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspeMions. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required Public Works aaoroval must be received prior to scheduling the Buildine Deaartment's final insnection. 7, Final Inspections are required prior to occupancy. A Certificate of Occupancy is required for anon- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. • 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH TIIE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3 1 1. Watexmm & KMZBudding 181 Quinry HVed. Suit 301 Port 7owound, WA 98368 Phone: (360)379-3208 Fax: (360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD I L THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOl-2168-Z Issued: 04/18/02 Parcel Number: 001044010 Job Address: 2522 Hastines Avenue Zoning: C-I/MU Type: VV=N Occupancy: NA -not allowed Nature of Work: Construct shell addition to existine outbuildine Occupant Load: NC Owner: John Paul Davies and Erin Lamb Contractor: Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE NOTE: BUILDING SHELL PERMIT ONLY-OCCUPANCY PROHIBITED RF.nTITRED TNSPF.CTI(7NS APPROVED/DATE TEMPORARY EROSION & SEDIMENT CONTROL See General Condition No. 2 -install on-site as needed during construction to prevent sediment from leaving and site and to eliminate tracking of soil onto the street. FOOTINGS Setbacks Footings Forms Reinforcement Interior Footings UFER FOUNDATION Stem WaIUCMU wall ~~~~~ Forms Reinforcement - CMUwall requires horizontal and vertical resteel at 48" on center wish bond beam at top of wall Anchor Bolts w/2" x 2" x 3/16" square washers Vents Crawl space access Positive Connection Treated Woad to Concrete 6 mil black poly • Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 rmwascnot-xtel{ l REQUIRED INSPECTIONS APPRnyF.nmATF. ' FLOOR FRAMING Girder (if applicable) Joists Blocking Positive Connections Treated Wood to Concrete Anchor Bolts & Washers FRAMING (plumbing, mechanical, insulation, & drywall covered under future permit) Walls Roof Windows -escape window required from all sleeping rooms Window Safety Glazing Rafter Positive Connection Weather Resistive Barrier FINAL House number -check for 5" numbers Final -building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construMion; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance. Adjacent rights-of--way shall be kept free of dirt 8c debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc, once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required. inspeMions. 5. Re-inspection is required after inspection report corrections are completed. Ca1148 hours before you dig for utility line locates • i-soo-4ia-ssss Page 2 of 3 PermitSBLD01-216(2 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A 7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • • Cali 48 hours before you dig for utility line locales 1-800-424-5555 Page 3 of 3 •,~ y • `~ u Waterman R Katz Buildhtg 181 Quincy SUxt, Suite 301 Pmt Townxtd, WA 96368 Phone: (360)379-3208 Fax: (360)385-7675 CITY OF-PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO1-216 Issued: 11/05/01 Parcel Number: 001044010 Job Address: 2522 Hastines Avenue Zoning: C-I/MU Type: VV=N Occupancy: U-1 Nature of Work: Construct new foundation. Occupant Load: NC Owner; JohnPaul Davies and Erin Lamb Contractor: Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE NOTE: FOUNDATION PERMIT ONLY RFf)TiTRFT) TN~PF.('TInNS • APPROVED/DATE TEMPORARY EROSION & SEDIMENT CONTROL See General Condition No. 2 -instals on-site as needed during construction to prevent sediment from leaving and site and to eliminate tracking of soil onto the street. FOOTINGS Setbacks Footings Forms Reinforcement Interior Footings LIFER FOUNDATION Stem Wall Forms Reinforcement Anchor Boits w/2" x 2" x 3/I6" square washers Vents Crawl space access Girder to Concrete Beam Pockets Positive Connection Treated Wood to Concrete Shield under Posts 6 mil black poly Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 .. Pemut k BLDOI-216 _ House number -check for 5" numbers Final -building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TE5C) measures shall be installed on-site and inspected prior to beginning construMion; cal1385-2294. Measures shall include installation of silt fencing and graveled construMion entrance. Adjacent rights-of--way shall be kept free of dirt & debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection otadjacent properties. 3. A11 elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project un61 Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to schedulin¢ the Buildine Departments final inspection. 7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Ca11 for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates I-800-424-5555 Page 2 of 2