CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION STTE
Call 385-2294 for Inspection
Permit Number: BLDO1-2168-2 Issued: 10/31/02 Parcel Number: 001044010
Tob Address: 2522 Hastines Avenue_ Zoning: C-I/MiJ
Nature of Work: Revision #Z:Remodel shell to heated space
Type: V_N Occupancy: R-3
Owner: John Paul Davies and Erin Lamb Contractor: caner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
Occupant Load• 1
NOTE: BUILDING SHELL & FOUNDATION UNDER SEPARATE PERMITS
RE UIRED INSPECTIONS
L_.
APPROVED/DATE
TEMPORARY EROSION & SEDIMENT CONTROL
See General Condition No. Z -install on-site as needed during
construction to prevent sediment from leaving and site and to
eliminate tracking of soil onto the street.
PLUMBING
Rough-In (D-V-T & Clean-Outs)
Water Supply
Water Hammer Arrestor @ clothes washer
Hose Bibbs (backflow protection required)
Pipe Insulation (R-3)
Pressure Reduction Valve if> 80 psi
Water Heater
Seismic Straps @ 1/3 points
Pressure relief valve drain to exterior, terminate 6" - 24"
above ground
MECHANICAL
Whole House Fan
Laundry Fan
Environmental Air Exhaust ducting (w/ backdraR dampers),
insulation (R-4) and terminus (located 3' from openings)
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 3
Permit#BIDOI-2I6R-2
RE UIRED INSPECTIONS
APPROVEDiDATE
FRAMING
Walls
Ceiling.
Headers
Roof Venting
Windows -escape
Windows -safety glazing
Windows U-factor - .40 or better
NFRC sticker must be on windows and doors at inspection
time
Doors Ufactor - .20 or better
Air Seal
Roof
INSULATION
Floor (R-30)
Walls (R-19)
Ceiling (R-38)
Vapor Barrier required: faced balls, V. B. paint, etc
Baffles
DRYWALL
Walls
Ceiling
FINAL
Health Department -septic approval
House number -check for 5" numbers
Smoke Detectors
Plumbing
Mechanical
Vapor Barrier Paint Certificate
Insulation Certificate
DecklStairs/HandrailslGuazdrails
Final -building
GENERAL
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 2 of 3
Permit#BLDOI-]IQt-2
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
• construction entrance. Adjacent rights-of--way shall be kept free of dirt & debris. Soils exposed during
construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is
responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspeMions.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
minimum of twenty-four hours notice is required Public Works aaoroval must be received prior to
scheduling the Buildine Deaartment's final insnection.
7, Final Inspections are required prior to occupancy. A Certificate of Occupancy is required for anon-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
• 9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH TIIE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3
1
1.
Watexmm & KMZBudding
181 Quinry HVed. Suit 301
Port 7owound, WA 98368
Phone: (360)379-3208 Fax: (360)385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD I
L THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOl-2168-Z Issued: 04/18/02 Parcel Number: 001044010
Job Address: 2522 Hastines Avenue Zoning: C-I/MU Type: VV=N Occupancy: NA -not allowed
Nature of Work: Construct shell addition to existine outbuildine Occupant Load: NC
Owner: John Paul Davies and Erin Lamb Contractor: Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
NOTE: BUILDING SHELL PERMIT ONLY-OCCUPANCY PROHIBITED
RF.nTITRED TNSPF.CTI(7NS
APPROVED/DATE
TEMPORARY EROSION & SEDIMENT CONTROL
See General Condition No. 2 -install on-site as needed during
construction to prevent sediment from leaving and site and to
eliminate tracking of soil onto the street.
FOOTINGS
Setbacks
Footings
Forms
Reinforcement
Interior Footings
UFER
FOUNDATION
Stem WaIUCMU wall
~~~~~
Forms
Reinforcement - CMUwall requires horizontal and vertical
resteel at 48" on center wish bond beam at top of wall
Anchor Bolts w/2" x 2" x 3/16" square washers
Vents
Crawl space access
Positive Connection
Treated Woad to Concrete
6 mil black poly
• Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 3
rmwascnot-xtel{ l
REQUIRED INSPECTIONS APPRnyF.nmATF. '
FLOOR FRAMING
Girder (if applicable)
Joists
Blocking
Positive Connections
Treated Wood to Concrete
Anchor Bolts & Washers
FRAMING (plumbing, mechanical, insulation, &
drywall covered under future permit)
Walls
Roof
Windows -escape window required from all sleeping
rooms
Window Safety Glazing
Rafter Positive Connection
Weather Resistive Barrier
FINAL
House number -check for 5" numbers
Final -building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construMion; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance. Adjacent rights-of--way shall be kept free of dirt 8c debris. Soils exposed during
construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc, once construction is complete. Applicant is
responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required.
inspeMions.
5. Re-inspection is required after inspection report corrections are completed.
Ca1148 hours before you dig for utility line locates •
i-soo-4ia-ssss
Page 2 of 3
PermitSBLD01-216(2
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
• Cali 48 hours before you dig for utility line locales
1-800-424-5555
Page 3 of 3
•,~
y
•
`~
u
Waterman R Katz Buildhtg
181 Quincy SUxt, Suite 301
Pmt Townxtd, WA 96368
Phone: (360)379-3208 Fax: (360)385-7675
CITY OF-PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDO1-216 Issued: 11/05/01 Parcel Number: 001044010
Job Address: 2522 Hastines Avenue Zoning: C-I/MU Type: VV=N Occupancy: U-1
Nature of Work: Construct new foundation. Occupant Load: NC
Owner; JohnPaul Davies and Erin Lamb Contractor: Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
NOTE: FOUNDATION PERMIT ONLY
RFf)TiTRFT) TN~PF.('TInNS
•
APPROVED/DATE
TEMPORARY EROSION & SEDIMENT CONTROL
See General Condition No. 2 -instals on-site as needed
during construction to prevent sediment from leaving and
site and to eliminate tracking of soil onto the street.
FOOTINGS
Setbacks
Footings
Forms
Reinforcement
Interior Footings
LIFER
FOUNDATION
Stem Wall
Forms
Reinforcement
Anchor Boits w/2" x 2" x 3/I6" square washers
Vents
Crawl space access
Girder to Concrete
Beam Pockets
Positive Connection
Treated Wood to Concrete
Shield under Posts
6 mil black poly
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
..
Pemut k BLDOI-216 _
House number -check for 5" numbers
Final -building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TE5C) measures shall be installed on-site and inspected prior
to beginning construMion; cal1385-2294. Measures shall include installation of silt fencing and graveled
construMion entrance. Adjacent rights-of--way shall be kept free of dirt & debris. Soils exposed during
construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is
responsible for protection otadjacent properties.
3. A11 elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project un61 Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
schedulin¢ the Buildine Departments final inspection.
7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Ca11 for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page 2 of 2