CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number. BLDO1-213 Issued: 10!24101 Parcel Number: 989704001
Job Address: 914 Water Street Zoning: C_III Type: VV=N Occupancy: B & M
Total Occupant Load: NC Nature of Work: Replacement of Structural Header Beam
Owner: Mt. Baker Block Coruoration Contractor: RAFN Construction
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RF,(liTiRED iNSPECTinNS
APPROVED/DATE
DEMOLITION
Materials from demolition shall be transported to areas
off-site that meet all the requirements of state and local law
and ordinances
PEDESTRIAN PROTECTION
FOOTINGS
New 12" minimum thick concrete pad
~ ~J ~~~~~
Reinforcement - #4 @ 10" each way 6l
(4) I" A307 rods set in epoxy
FRAMING
Pier Supports
4" pipe @ pier supports
(4) 3/4" x 6" anchors set in epoxy l o ~/~ ~
(10) 1" A307 epoxied threaded rods @ 9" ~" G
Details @ Steel Beam
5/8" x 3 1/2" studs @ 18"
Reinforcement
Steel Straps
'/a" x 6" AB @ 18" staggered
• Call 48 hours before you -dig for utility line locates
1-800-424-5555
Page 1 of 2
Pemut #BI1701-213 -
FINAL
Building numbers posted -min. S"numbers r
Final -Building / !~/ ~~
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for proteMion of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
7. Final Inspections are required prior to occupancy; A Certi£cate of Occupancy is required for anon-
residential project,.
8. All building permits expire if no progress has been made within six months, or it no inspections are done
by the Building Department within one year. Call for at least. one inspection per year to keep your
building permit active..
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
C J
Ca1148 hours before you dig for utility line locates
1-800.424-5555
Page 2 of 2