Loading...
HomeMy WebLinkAboutBLD01-213Walmom & KatzBuilding 181 Quinry Street, Bui@ 301 Part rownsenQ WA 98368 Phom: (360) 379-3208 Fax: (360) 365-76"15 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number. BLDO1-213 Issued: 10!24101 Parcel Number: 989704001 Job Address: 914 Water Street Zoning: C_III Type: VV=N Occupancy: B & M Total Occupant Load: NC Nature of Work: Replacement of Structural Header Beam Owner: Mt. Baker Block Coruoration Contractor: RAFN Construction GENERAL CONDITIONS APPLY -SEE LAST PAGE RF,(liTiRED iNSPECTinNS APPROVED/DATE DEMOLITION Materials from demolition shall be transported to areas off-site that meet all the requirements of state and local law and ordinances PEDESTRIAN PROTECTION FOOTINGS New 12" minimum thick concrete pad ~ ~J ~~~~~ Reinforcement - #4 @ 10" each way 6l (4) I" A307 rods set in epoxy FRAMING Pier Supports 4" pipe @ pier supports (4) 3/4" x 6" anchors set in epoxy l o ~/~ ~ (10) 1" A307 epoxied threaded rods @ 9" ~" G Details @ Steel Beam 5/8" x 3 1/2" studs @ 18" Reinforcement Steel Straps '/a" x 6" AB @ 18" staggered • Call 48 hours before you -dig for utility line locates 1-800-424-5555 Page 1 of 2 Pemut #BI1701-213 - FINAL Building numbers posted -min. S"numbers r Final -Building / !~/ ~~ GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for proteMion of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A 7. Final Inspections are required prior to occupancy; A Certi£cate of Occupancy is required for anon- residential project,. 8. All building permits expire if no progress has been made within six months, or it no inspections are done by the Building Department within one year. Call for at least. one inspection per year to keep your building permit active.. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. C J Ca1148 hours before you dig for utility line locates 1-800.424-5555 Page 2 of 2