Loading...
HomeMy WebLinkAboutBLD01-210wata~nen ~ x.~su;wing 181 Quincy Street, Suite 301 Pmt Towmend, WA 98368 Phone: (360)3793208 Fax: (360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOl-21O Issued: 10/23/01 Parcel Number: 932400027 Job Address: 1807 Sunrise Place Zoning: R_II Type: VV=N Occupancy: R_3 Nature of Work: Realace 3 windows and move non-bearing kitchen wall Owner: Bob & Linda Tillev Contractor: Same as Owner 379-1946 GENERAL CONDTI'IONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 REQUIRED INSPECTIONS APPROVED/DATE FRAMING/FINAL: Electrical inspection required prior to framing % ,~, ll ~ L~ Walls Windows Window Ufactor - .40 or better (electric heat) NFRC window sticker must be on windows at inspection time Air Seal Window Safety Glazing DRYWALL NAILING Walls l ~l FINAL Smoke Detectors throughout house per 1997 j / Uniform Building Code; battery powered ! f! ~~~ smoke detectors adequate in existing 66G construction House Numbers -check for 5" high Final- Building Ca1148 hours before you dig Tor utility line locates 1-800-424-5555 Page 1 of 2 Permit XBLDOI-210 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a Ci business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for proteMion of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for st least one inspection per year to keep your building permit active. 9. Revisions require submittal 8c approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2