Loading...
HomeMy WebLinkAboutBLD01-209Watmnm & KatzBuild"mg 181 Quincy Sheet, Suite 301 Port Towtuad, WA 98368 Phone: (360) 379-3208 Fex: (360) 3857675 CITY OF PORT TOWNSEND R CONSTRUCTION PERMIT & INSPECTION RECORD I THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDO1-2O9 Issued: 11/01/101 Parcel Number: 9897000906 Job Address: 435 Water Street Zoning: C-III Type: VV=N Occupancy: N/A Nature of Work: Construct Kav ak Rack attached to existing PT Cv clerv Building Owner: Lessee: Kavak Port Townsend Contractor: Lon Smith dba Kavak Port Townsend, Inc. (385-6240) GENERAL CONDITIONS APPLY -SEE LAST PAGE OTHER PERMITS REQUIRED: HPC Review RE UIRED INSPECTIONS APPROVED/DATE FRAMING -framing members to be pressure treated or wood of natural resistance to decay ~~ ~ ~ ~/ ~r/ o~ ~ t Post Footings / Post-to-Wall Positive Connections Racks-to-Post Positive Connections Blocking FINAL l~ ~ ~~ t Final -building - GENERAL CONDITIONS • 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance. Adjacent rights-of--way shall be kept free of dirt & debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. Cap 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Pem~it MBLbDL2(19 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall pane (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A 7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within sia months, or if no inspections are done by the Building Department within one year. CaII for at least one inspeMion per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Ca1148 hours before you dig for utility line locates • I-800-424-5555 Page 2 of 2