HomeMy WebLinkAboutBLD01-209Watmnm & KatzBuild"mg
181 Quincy Sheet, Suite 301
Port Towtuad, WA 98368
Phone: (360) 379-3208 Fex: (360) 3857675
CITY OF PORT TOWNSEND
R CONSTRUCTION PERMIT & INSPECTION RECORD I
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDO1-2O9 Issued: 11/01/101 Parcel Number: 9897000906
Job Address: 435 Water Street Zoning: C-III Type: VV=N Occupancy: N/A
Nature of Work: Construct Kav ak Rack attached to existing PT Cv clerv Building
Owner: Lessee: Kavak Port Townsend Contractor: Lon Smith dba Kavak Port Townsend, Inc.
(385-6240)
GENERAL CONDITIONS APPLY -SEE LAST PAGE
OTHER PERMITS REQUIRED: HPC Review
RE UIRED INSPECTIONS
APPROVED/DATE
FRAMING -framing members to be pressure treated or
wood of natural resistance to decay ~~ ~ ~ ~/
~r/ o~ ~ t
Post Footings /
Post-to-Wall Positive Connections
Racks-to-Post Positive Connections
Blocking
FINAL
l~ ~ ~~ t
Final -building -
GENERAL CONDITIONS
•
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance. Adjacent rights-of--way shall be kept free of dirt & debris. Soils exposed during
construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is
responsible for protection of adjacent properties.
Cap 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Pem~it MBLbDL2(19
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall pane
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within sia months, or if no inspections are done
by the Building Department within one year. CaII for at least one inspeMion per year to keep your
building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
Ca1148 hours before you dig for utility line locates •
I-800-424-5555
Page 2 of 2