Loading...
HomeMy WebLinkAboutBLD01-208w.wmen~x,~auiaNs jai Q~y so-so, six 3oi Pat Towmmd, WA 98368 3Nwne: (3W)3'Ad2W Pu (360)385-7675 CITY OF PORT 'TOWNSEND CONSTRUCTION PERNIIT & INSPECTION RECORD TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO1-2O8 Issued: 10/31!01 Parcel Number: 931403001 Job Address: 450 Fir Street Zoning: PP=1 Type: VV=N Occupancy: E_1 Total Occupant Load: NC Nature of Work: Chanee !arse sinele office to two smaller offices with installation of hard walls and doors Owner: Port Townsend School District Contractor: Kurtzbein Construction Comuanv GENERAL CONDTITONS APPLY -SEE LAST PAGE SEPARATE PERMTTS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 REQUIRED INSPECTIONS APPROVF:n/T1ATF. FRAMING -barrier free design required Walls Positive Connections ~~ Ceiling Blocking i ~~ l~ W ndow Safety Glazing if applicable Fire Blocking 11 / ~~, / p i DRYWALL Walls ~ ~.. ' l Ceiling ~ ~ G ate, 1~ kj FINAL Property address posted -min. S"numbers oy`o g~v4 Fire Department Sign-Off ; Electrical Sign-off (L & ~ ~ / t /.( / Barrier Free Access Thresholds u /t Door Clearances I'-'~ Lever Hazdwaze Exit Signage & IDumination• Final -Building N~~ 6r. ~..~~ O°7 /0$/p~ Call 48 hours before you dig for utility tine locates ~, ® 1-800-424-5555 ~~Gy. Page 1 of 2 ~~_~ GENERAI, CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contraMor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. iVleasures shall include installation of silt fencing snd graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporan7y stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construMion is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project unfit Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A ~,...........~ ...., ..,..,....z ..~..a.......... ~ ....a....~.,~...,,... 7. Final Inspections are required prior to occupancy; A .Certificate of Occupancy is required for anon- residentislproject. 8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for st least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department Qa 379-3208 prior to making changes to the approved plans. ~-- 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. ~I Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 2 of 2