CONSTRUCTION PERNIIT & INSPECTION RECORD
TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDO1-2O8 Issued: 10/31!01 Parcel Number: 931403001
Job Address: 450 Fir Street Zoning: PP=1 Type: VV=N Occupancy: E_1
Total Occupant Load: NC Nature of Work: Chanee !arse sinele office to two smaller offices with
installation of hard walls and doors
Owner: Port Townsend School District Contractor: Kurtzbein Construction Comuanv
GENERAL CONDTITONS APPLY -SEE LAST PAGE
SEPARATE PERMTTS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
REQUIRED INSPECTIONS
APPROVF:n/T1ATF.
FRAMING -barrier free design required
Walls
Positive Connections ~~
Ceiling
Blocking
i ~~
l~
W
ndow Safety Glazing if applicable
Fire Blocking 11 / ~~,
/ p i
DRYWALL
Walls ~ ~..
'
l
Ceiling ~
~ G ate,
1~ kj
FINAL
Property address posted -min. S"numbers oy`o g~v4
Fire Department Sign-Off ;
Electrical Sign-off (L & ~ ~ /
t
/.( /
Barrier Free Access
Thresholds u /t
Door Clearances I'-'~
Lever Hazdwaze
Exit Signage & IDumination•
Final -Building N~~ 6r. ~..~~
O°7 /0$/p~
Call 48 hours before you dig for utility tine locates
~, ® 1-800-424-5555
~~Gy. Page 1 of 2
~~_~
GENERAI, CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contraMor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294, press 3. iVleasures shall include installation of silt fencing snd
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils ezposed during construction shall be temporan7y stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construMion is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project unfit Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A
~,...........~ ...., ..,..,....z ..~..a.......... ~ ....a....~.,~...,,...
7. Final Inspections are required prior to occupancy; A .Certificate of Occupancy is required for anon-
residentislproject.
8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for st least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department Qa 379-3208 prior to making changes to the approved plans.
~-- 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.