HomeMy WebLinkAboutBLD01-206Watemtvt~Katz
181 Quincy Street Suite 30I
PcetTownund WA 98368
Pnooe (360) 3rz3zos Pex (360) 3ssa6s
CITY OF PORT TOWNSEND
i CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MIDST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDO1-2O6 Issued: 10131/Ol Parcel Number: 957311404
Job Address: 510 Walker Street Zoning:R-II Type: VV=N Occupancy: R-3
Total Occupant Load: No Chanee Nature of Work: Construct 256 sa. ft. deck
Owner: Karen Gates Hildt Contractor: Crai¢ Johnson
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RF.nTTTRF,D TNSPECTTONS
•
APPROVED/DATE
FOOTINGS
Setbacks
Deck Pier Footings
Reinforcement
FLOOR FRAMING(DECK
All framing members to be pressure treated or wood of
natural resistance to decay
Posts
Beam
Joists (2" x 8'~
Positive Connection
Post-to-Pier
Post-to-Beam
Treated Wood to Concrete
Lag Bolts @ ledger - %:" x 4" bolts @ 24" o.c., staggered
Blocking
Door U-factor..29 or better per calculatlons
FINAL
House Numbers posted (min. 5'~
Guardrails
Handrails
Smoke Detectors throughout existing construction per 1997
UBC
Deck -Final
Ca1148 hours before you dig utility line locates: 1-800-424-5555
Page 1 of 2
~~$~~.~
GENERAL CONDTTIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number snd a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A
minimum of twenty-four hours notice is required. Public Works aooroval must be received prior to
scheduling the Building Department's final inspection.
Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig utility line locates: 1-800-424-5555
Page 2 of 2