Loading...
HomeMy WebLinkAboutBLD01-206Watemtvt~Katz 181 Quincy Street Suite 30I PcetTownund WA 98368 Pnooe (360) 3rz3zos Pex (360) 3ssa6s CITY OF PORT TOWNSEND i CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MIDST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO1-2O6 Issued: 10131/Ol Parcel Number: 957311404 Job Address: 510 Walker Street Zoning:R-II Type: VV=N Occupancy: R-3 Total Occupant Load: No Chanee Nature of Work: Construct 256 sa. ft. deck Owner: Karen Gates Hildt Contractor: Crai¢ Johnson GENERAL CONDITIONS APPLY -SEE LAST PAGE RF.nTTTRF,D TNSPECTTONS • APPROVED/DATE FOOTINGS Setbacks Deck Pier Footings Reinforcement FLOOR FRAMING(DECK All framing members to be pressure treated or wood of natural resistance to decay Posts Beam Joists (2" x 8'~ Positive Connection Post-to-Pier Post-to-Beam Treated Wood to Concrete Lag Bolts @ ledger - %:" x 4" bolts @ 24" o.c., staggered Blocking Door U-factor..29 or better per calculatlons FINAL House Numbers posted (min. 5'~ Guardrails Handrails Smoke Detectors throughout existing construction per 1997 UBC Deck -Final Ca1148 hours before you dig utility line locates: 1-800-424-5555 Page 1 of 2 ~~$~~.~ GENERAL CONDTTIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number snd a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works aooroval must be received prior to scheduling the Building Department's final inspection. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig utility line locates: 1-800-424-5555 Page 2 of 2