HomeMy WebLinkAboutBLD01-204Waterman & Katz Building
181 Quincy Street Suite 301
PoR Townsend, WA 98368
Phone (360) 379-3208 Fax (360) 385-7675
~J
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
CITY OF PORT TOWNSEND
Permit Number: BLDOI-2O4R-1 Issued: 01/29/03 Parcel Number: 969 912 501
Job Address: '619 Scott Street Zoning: R-II Type: V;N Occupancy: RR_3
Total Occupant Load: N/C
Nature of Work: Revision #1: new partial CMU perimeter foundation alon¢ portions of south and west
walls.
Owner: David Simpson
Contractor: Owner
(379-4801)
GENERAL CONDITIONS APPLY -SEE LAST PAGE
NOTE: See original permit BLDOl-204 for other inspections
RE UIRED INSPECTIONS
APPROVED/DATE
FOOTINGS
Setbacks -existing; no change
Footings
Forms
Reinforcement
Existing Slab/New Footing Connection
FOUNDATION
'Block
Reinforcement ,/
,~' ~ ~E
~ ~
Bond Beam j,; ' ~
`
Foundation WalUChimney Footin Co
osl rve Connections
Anchor Bolts w/ 2" x 2" x 3/16" washers
Treated Wood to Concrete
FINAL
See original permit for final inspection
Ca1148 hours before you dig for utility line locates
1-800.424-5555
Page 1 of 2
Building Prnnit #BLD01-204Rd
GENERAL
1. Contractors working on this project are required to have a Labor & Industries contractor's
reeistration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job stint down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt
and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construMion is complete. AppGcent is responsible for proteMion of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after sny corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspeMion call 385-2294; a
minimum of twenty-four hours notice is required Public Works approval must be received prior to
scheduling the Building Departments final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits expire if no progress has been made within six months, or if no inspeMions ue
done by the Building Department within one yeu. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require review and approval rior to making changes in the field. Contact the Building
Department at 379-5086 arior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
Waterman & Katz Building
181 Quincy SVeet Suite 301
Port Tawnsrnd WA 98368
Phone (360)379-3208 Fax (360)385-7675
r 1
f, J
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDO1-2O4 Issued: 10/17/01 Parcel Number: 969 912 501
Job Address: 619 Scott Street Zoning: RR=II Type: V_N Occupancy: RR=3
Total Occupant Load: N/C
Nature of Work: Realace six footings in existing foundation.
Owner; David Simpson
Contractor: Owner
(379-4801)
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RF.(iT1TRF.lI TNCPRC'TTnNS
APPRC)VF,i)/DATF
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2 -install on-site as needed
during construction to prevent sediment from leaving the
site and to eliminate tracking of sold onto the street.
FOOTINGS JO~~ ~D`
Setbacks -existing; no change
Footings - 1 I" x 24" with bottom of Footing 12" below grade '
Interior footings with post bases
Forms
Reinforcement
FOUNDATION
Positive connections -post-to-pier & post-to-beam
%/Zljjt/°7" ~ ~~,~Q'
Treated wood to concrete; beams within 12" of earth and
joists within 18" must be treated or of natural resistance to
decay.
Vents - 3 vents
Shield under posts
Treated sill plate
Anchor bolts and washers
Crawl space access
6 mil black poly
Call 48 hours before you dig for utility Tine locates
I-800-424-5555
Page 1 of 2
Building Pmnit #BLDOI-204
FINAL
House Numbers - S"minimum
Smoke Detectors -required throughout existing house per
1997 UBC; one in each sleeping room and in each
area hallway leading to each sleeping room with a
minimum of one detector on each floor; battery powered
OK
Final
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
r~istration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of way shall be kept tree of dirt
and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shalt be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panel
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shal- review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits expire it no progress has been made within siz months, or if no inspections are
done by the Building Department within one year. Call for at least one inspeMion per year to keep
your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 374-5086 rior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
CaII 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2