Loading...
HomeMy WebLinkAboutBLD01-204Waterman & Katz Building 181 Quincy Street Suite 301 PoR Townsend, WA 98368 Phone (360) 379-3208 Fax (360) 385-7675 ~J CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection CITY OF PORT TOWNSEND Permit Number: BLDOI-2O4R-1 Issued: 01/29/03 Parcel Number: 969 912 501 Job Address: '619 Scott Street Zoning: R-II Type: V;N Occupancy: RR_3 Total Occupant Load: N/C Nature of Work: Revision #1: new partial CMU perimeter foundation alon¢ portions of south and west walls. Owner: David Simpson Contractor: Owner (379-4801) GENERAL CONDITIONS APPLY -SEE LAST PAGE NOTE: See original permit BLDOl-204 for other inspections RE UIRED INSPECTIONS APPROVED/DATE FOOTINGS Setbacks -existing; no change Footings Forms Reinforcement Existing Slab/New Footing Connection FOUNDATION 'Block Reinforcement ,/ ,~' ~ ~E ~ ~ Bond Beam j,; ' ~ ` Foundation WalUChimney Footin Co osl rve Connections Anchor Bolts w/ 2" x 2" x 3/16" washers Treated Wood to Concrete FINAL See original permit for final inspection Ca1148 hours before you dig for utility line locates 1-800.424-5555 Page 1 of 2 Building Prnnit #BLD01-204Rd GENERAL 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job stint down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construMion is complete. AppGcent is responsible for proteMion of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after sny corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspeMion call 385-2294; a minimum of twenty-four hours notice is required Public Works approval must be received prior to scheduling the Building Departments final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within six months, or if no inspeMions ue done by the Building Department within one yeu. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval rior to making changes in the field. Contact the Building Department at 379-5086 arior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 Waterman & Katz Building 181 Quincy SVeet Suite 301 Port Tawnsrnd WA 98368 Phone (360)379-3208 Fax (360)385-7675 r 1 f, J CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDO1-2O4 Issued: 10/17/01 Parcel Number: 969 912 501 Job Address: 619 Scott Street Zoning: RR=II Type: V_N Occupancy: RR=3 Total Occupant Load: N/C Nature of Work: Realace six footings in existing foundation. Owner; David Simpson Contractor: Owner (379-4801) GENERAL CONDITIONS APPLY -SEE LAST PAGE RF.(iT1TRF.lI TNCPRC'TTnNS APPRC)VF,i)/DATF TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 -install on-site as needed during construction to prevent sediment from leaving the site and to eliminate tracking of sold onto the street. FOOTINGS JO~~ ~D` Setbacks -existing; no change Footings - 1 I" x 24" with bottom of Footing 12" below grade ' Interior footings with post bases Forms Reinforcement FOUNDATION Positive connections -post-to-pier & post-to-beam %/Zljjt/°7" ~ ~~,~Q' Treated wood to concrete; beams within 12" of earth and joists within 18" must be treated or of natural resistance to decay. Vents - 3 vents Shield under posts Treated sill plate Anchor bolts and washers Crawl space access 6 mil black poly Call 48 hours before you dig for utility Tine locates I-800-424-5555 Page 1 of 2 Building Pmnit #BLDOI-204 FINAL House Numbers - S"minimum Smoke Detectors -required throughout existing house per 1997 UBC; one in each sleeping room and in each area hallway leading to each sleeping room with a minimum of one detector on each floor; battery powered OK Final GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's r~istration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept tree of dirt and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shalt be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panel (ABWP) require inspection prior to cover. 4. Owner or owner's agent shal- review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire it no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspeMion per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 374-5086 rior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. CaII 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2