CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Pernut Number: BLDO1-202R-1 Issued: l0/31/02 Parcel Number: 985 208102
Job Address: 704 V Street Zoning: R_II Type: V_N Occupancy: RR=3
Total Occupant Load: No Chanee
Nature of Work: Revision #1: Add twa dormers with windows
Owners: Jeff and Lisa Blohm Contractor: Owner
GENERAL CONDTI'IONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REOUIItED:
Electrical -Contact Labor & Industries Qa 360-417-2702
REQUIRED INSPECTIONS
APPROVED/DATE
FRAMING:
Walls ~"
~ '~/~(i/
'/z" CDX Plywood Sheathing with Nailing per G
attached engineering
Ceiling
Window U-factor - .40 or better
Air Seal
Fire Blocking
Ridge Beam
LVLs -per attached engineering
INSULATION
Walls (R-19)
(R-30)
Ceilin ., /'
~ L.,F L--~U Z--
g
DRY WALL NAILING
waus
///~/O 3
Ceiling /
FINAL -see original inspection record '
Final -Building
Call 48 boors before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Building Permit #BLDOI-7MR•1
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor .~ Industries contractor's
reeistration number and a City business license. Failure to provide proof of this documentation prior to
work may resole in job shut down while thks ks accomplished
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294. Measures shall include installation of sik fencing and
graveled construction entrance (see attached details). Ady'acent rights-of way shall be kept free of dirt
and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements Gave been completed and inspected. For Public Works inspection call 385-2294; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Departments final inspection.
7. F'mal Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All bnt7ding permits expire if no progress has been made within siz months, or if no iatpectioos are
done by the Building Department within one year. Call for at least oae inspection per year to keep
your building permit active.
9. Revisions. require review and approval prior to making changes in the field Contact tbe Bmlding
Department st 379-5086 rior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before yon dig for utility tine locates
1-800-424-5555
Page 2 of 2
•
City of Pat Tow~uend
Waterman & [Getz Building
181 Quinry Street, PoRTownaen4 WA98368
(360) 379-3208 Fax (360) 385.7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION STI'E
Call 385-2294 for Inspection
Permit Number: BLDO1-202 Issued: 10/26/01 Parcel Number: 985208102
Job Address: 704 V Street Zoning: R_II Type: V_N Occupancy: RR=3
Total Occupant Load: add 2 Nature of Work: Residential Addition
Owner: Jeff Blohm Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
REQUIRED INSPECTIONS
APPROVED/DATE
EROSION CONTROL
Sweeping of paved surfaces may be required to
eliminate the tracking of dirt and debris onto City
rights-of--way
FOOTINGS
Setbacks
Footings
Forms
Reinforcement
-n r ~~r~
(~ S~
~~~ ~' b G ~/ I J 0
Interior Footings _ J
UFER
FOUNDATION
Stem Wall
~Ort/p ~ ~, /f
Z/O ~ / !/
`
Forms 'T
Reinforcement
Anchor Bolts
Vents - 2 required
Crawl Access
Beam Pockets
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page 1 of 4
Building Pmnil #BLDOI-202
REQUIRED INSPECTIONS APPRnVF,nmATF.
FLOOR FRAMING
TJI joist plan shall be on-site at time of inspection
Girder
~ Zl ~ r d ~ ,~ /!
(
J
V
Joists I l l
~
Blocking
Shield under Posts
Positive Connection Post-to-Beam '4D0/Y'(a W ~/, /Q~
(~
Positive Connection Post-to-Foundation Wall (if
applicable)
Beam Pockets
Treated Wood to Concrete
Girder to Concrete
Anchor Bolts & Washers
PLUMBING ~/
Rough-In (D-V-T & Clean Outs) '~
~
Water Supply
Pipe Insulatlon (R-3)
Pressure Reduction Valve if> 80 psi
MECHANICAL
Bath/Whole House Fan ~J 2~0 /RL
(V nn
j„'j
/
Environmental Air Exhaust ducting (with backdraft l ( `
damper), insulation (R-4) and terminus (located 3'
from openings)
FRAMING:
Walls
ij
Fj~•
d / nn
/
~~37i ("I
~
Attic Venting -ridge & roof I
.
Z
C C
i
Ceilings
Roof
Posts, Beams and Headers
Windows Ufactor - .40 or better
NFRC window sticker must be on windows
at inspection time
Air Seal
Fresh Air: window or wall port required
Rafter Positive Connection
Fire Blocking
Weather Resistive Barrier
i
Call 48 hours before you dig For utility line locates •
1-800-424-5555
Page 3 of 4
Building Permit kBI.D01-202
REOUTRED INSPECTIONS APPROVED/DATE
INSULATION
Wall (R-19) ~-- ___~ ._____----...------. ~.u ~~ Yom:; ~ o:,w 1~ ~~ ' o i
Floor{R-30 ~ Ru~.G.
Ceiling (R-30 in vault)
Baffles
Vapor Barrier:battsand/orpaint ~w~:e
~ ~
~ ~>~r-,h c.~,x~, or1~
~ ~
~
~ ~
6 mil black poly in crawl space "~'
' ~ a'~'
DRY WALL NAILING "~'e ~il~orv~- z ~ L
Walls r
Ceiling
FINAL
House Numbers -check for 5" numbers
Plumbing
Mechanical
V. B. Paint Certificate
Smoke Detectors throughout existing construction: one in
each sleeping room and in each area/hallway leading to
sleeping rooms with a minimum of one on each floor
Final -Building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
reeistration number and a Ciri business license. Failure to provide proof of this documentation
prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and
inspeMed prior to beginning construction; ca11385-2294, press 3. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details). Adjacent
rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be
temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized
with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for
protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall
panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4
Building Permit #HLD01.402
6. The Building Department is unable to pass foal inspection on your project anti{ Public Works
requirements have been completed and inspected. For Public Works inspection ca11 38 5-2 294,
press 3. A minimum of twenri-four hours notice is required Public Works approval must be
7. Final InspeMions are required prior to occupancy; A Certificate of Occupancy is required for a
non-residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections
are done by the Building Department within one year. Call for at least one inspection per year
to keep your building permit active.
9. Revisions require review and approval by the Building Department. Contact them at 379-5086
prior to making changes in the field.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555