Loading...
HomeMy WebLinkAboutBLD01-201W alennan & Katz Building 181 Quincy Street Suite 301 Port Townsend, W A 98368 (Phone) 3793208 (Fax) 385J675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO1-2O1 Issued: 09/27/01 Parcel Number: 957-301-801 Job Address: 1807 Water Street Occupancy: R_I Zoning: C_II Type: 1-F.R. Total Occupant Load: N/C Nature of Work: Repair fire damase in hotel. See attached scone of work. Owner: Simon Lee Business Name: Tides Inn Contractor: Jack's Construction (425)894-6049 GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 REQUIRED INSPECTIONS APPROVED/DATE DEMOLITION Materials from demolition to be placed in approved ]ocation as set forth by state and local law. FRAMING ~~ ~~ Walls Ceiling Doors -thresholds & lever hardware Air Seal Fire Blocking Roof Siding INSULATION i i d ll Fill ~~~~~ ~ I l cav es expose wa t DRYWALL NAILING Walls ~~l ~7 ~ /f ~/ Ceiling FINAL Fire Department Electrical (L&1) Ca1148 hours before you dig for utility line locates -1-500-424-5555 Page I of 2 Building Permit #BLDDI-201 (See next page) FINAL continued Smoke Detectors Barrier-Free All new door hardware to be lever-type. New thresholds -''/z" maximum Final -Building GENERAL CONDTTIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works aaoroval must be received nrior to scheduling the Buildint= Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. AU building permits ezpire if no progress has been made within sia months, or iF no inspections are done by the Building Department within one year. Call Tor at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the Peld. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates -1-800-424-5555 Page 2 of 2