HomeMy WebLinkAboutBLD01-200Watmnau &Katz
181 Quincy Street Suits 301
Pat'rowrtvend, WA 98368
Phore (360) 379-3208 Fax (360) 385-7615
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: $LllOl-ZOO Issued: 10/05/01 Parcel Number: 989 700 806
Job Address: 823 Water Street Zoning: C-III Type: VV=N Occupancy: A-3
Total Occupant Load: No Chance Nature of Work: Remove pool room wall: install new beam.
Owner: Sirens of Port Townsend Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RE UIRED INSPECTIONS
APPROVED/DATE
DEMOLITION
Materials from demolition to be transported to Jefferson
County Landfill or other approved site in conformauce with
all state and local regulations and ordinances.
FRAMING
HeaderBeam -per engineering
Wall -retain studs per engineering
INSULATION if applicable
Fill exposed cavities
DRYWALL if applicable
Walls
FINAL
Fire Department Final Approval (if applicable)
Building Numbers posted (min. 5'~
Building -Final
Call 48 hours before you dig utility line locates: 1-800-424-5555
Page I of 2
Fermi[ k BLDOI-200
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
Ca1148 hours before you dig utility line locates: 1-800-424-5555
Page 2 of 2