Loading...
HomeMy WebLinkAboutBLD01-200Watmnau &Katz 181 Quincy Street Suits 301 Pat'rowrtvend, WA 98368 Phore (360) 379-3208 Fax (360) 385-7615 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: $LllOl-ZOO Issued: 10/05/01 Parcel Number: 989 700 806 Job Address: 823 Water Street Zoning: C-III Type: VV=N Occupancy: A-3 Total Occupant Load: No Chance Nature of Work: Remove pool room wall: install new beam. Owner: Sirens of Port Townsend Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE RE UIRED INSPECTIONS APPROVED/DATE DEMOLITION Materials from demolition to be transported to Jefferson County Landfill or other approved site in conformauce with all state and local regulations and ordinances. FRAMING HeaderBeam -per engineering Wall -retain studs per engineering INSULATION if applicable Fill exposed cavities DRYWALL if applicable Walls FINAL Fire Department Final Approval (if applicable) Building Numbers posted (min. 5'~ Building -Final Call 48 hours before you dig utility line locates: 1-800-424-5555 Page I of 2 Fermi[ k BLDOI-200 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Ca1148 hours before you dig utility line locates: 1-800-424-5555 Page 2 of 2