Loading...
HomeMy WebLinkAboutBLD01-199Wutmman&Rat: BuiWine 181 Quincy Stag Suite 301 Pat TowTSnd, WA 98368 Plwne: (360) 379-3208 Faz: (360) 3857675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD 1 THIS CARD MUST BE POSTED AT CONSTRUCTION SITE I Ca11 38 5-22 9 4 for Inspection Permit Number: $LDO1-199 Issued: 9/25101 Parcel Number: 989704002 Job Address: Intersection otTavlor and Water Zoning: C-III Type: VAN Occupancy: NIA Nature of Work: Erect temaorarv wooden arch aer attached engineered clans Owner: Rockv Friedman (Port Townsend Film Societvl Contractor: PT Film Festival (379-1333) GENERAL CONDTITONS APPLY -SEE LAST PAGE Special Event permit through City Police Department to close Taylor Street from midnight 9/27/01 to Noon 9/30/01 for the Port Townsend Film Festival NOTE: All elements of construction, incfuding fastenings, blocking, etc require inspection prior to cover. Arch shall not block sidewalks, crosswalk, or view ojpedestrians coming off the curb onto the crosswalk. Minimum 1 S feet distance between bottom of sign on arch and surface of street right of way. U REOiJIRED INSPECTIONS FRAMING Scaffolding Cable Braces Screw Jacks Arch Positive Connections Blocking. FINAL Fire Department sign-off Public Works sign-off Police Department sign-off Final -building APPROVED/DATE Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 PamitMBLDO]-199 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance. Adjacent rights-of--way shall be kept free of dirt & debris. Soils ezposed during construMion shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. .. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass Saal inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to_ scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required for anon- residential project. 8. All building. permits expire if no progress has been made within sia months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building .Department at 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 2 of 2