CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number. $LDO1-196 Issued: 10101/OI Parcel Number: 957-901-607
Job Address: 2805 Jackman Street Zoning: R-II Type: VV=N Occupancy: RR=3
Total Occupant Load: 5 Nature of Work: Set New Manufactured Home
Owner: Marilyn Brown Contractor: Valley Properties & Construction WAINS#1690
****Installer: See Attached Installer Tae****
s
GENERAL CONDITIONS APPLY- SEE LAST PAGE
SEPARATE PERIIIITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
NOTE; Set-up manual shall be on-site at time of inspection.
AFOTTTRFTI TN.CPFC''TTfINC
APPRnVF,n/nATF,
TEMP EROSION & SEDIMENT CONTROL
See general condition #2
Silt Fence as needed
Drive Off Mat to prevent sediment from leaving
the site
FOOTINGS/SLAB
Setbacks G /z ?l0~
Forms j
Reinforcement (,
FLOOR FRAMING (prior to skirting)
Anchors
Steel Support Piers -Load-stamped and installed
' I I Ij ~ /v 1
l
s installation manual; clearance
per manufacturer
of IS"min. from lowest point ofI-beam and the
ground or footing for min. of 75% of area under
" ~~ r
l~
min: elsewhere unless installation
home w/ 12
manual specifres; otherwise area around home ~/
~
F"'
graded to provide runoff away from home. ~
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 3
Permit #BI,DOI-1% .~
., .
REQUIRED INSPECTIONS APPROVF,D/T)ATF.
PLUMBING:
Water Supply -Main shut-off valve (port or ball valve)
installed in water supply piping prior to connection to
home, min. '/. "diameter, same as supply pipe
Pressure Reduction Valve if> 80 psi
Hose Bibs (backflow protection required)
Pipe Insulation -Outside & in crawl space
Pressure Test - 100 p.s.i. for IS minutes
Pressure relief valve drain - to exterior of skirting,
exhaust dowmvard between 6"and 24"above ground
Drainage Piping -sloped min. '/,'per foot
MECHANICAL
Ducts & Duct Insulation
Dryer Exhaust -vented to outside. Extension into crawl
space requires venting through skirting with no dips;
follow dryer manufacturer's instructions; total combined
length of ducting not to exceed 14' w/ 2-90° elbows
VAPOR BARRIER
6 mil black poly ground cover (not required where area O
under home is concrete slab floor with a minimum
thickness of 3-%s inches) 1
~ ~ ((1 l ~ ~
FINAL
Public Works Sign-Off
Electrical (L & I) Sign-Off
House Number -minimum 5" numbers
Plumbing
Mechanical ((~~
p~.,([~ '1rZ9j03
Final -Building ~~ l~~``
No holes or gaps greater than '/. "allowed in skirting.
Crawl space ventilation per installation marmal @
1/150 (I2 required), located close to corners, on at least
rivo opposing sides for cross ventilation.
Crawl space access must provide access to all areas
under home, minimum 18 " x 24 ", covered with vinyl,
pressure treated wood or metal.
s
•
Ca1148 hours before you dig for utility line locates ~~
1-800-424-5555
Page 2 of 3
GENERAL CONDITIONS
Perrttil gBLD01-] 96
1. Contractors working on this projeM are required to have a Labor & Industries contractor's
reeistration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Soils exposed during construction shall be
temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with
seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of
adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.