Loading...
HomeMy WebLinkAboutBLD01-195 wetemwn & xatz suihlu~p jai rn~r svxt, s~~e 3oi PollTowiuend, WA 98368 Phone: (360)379-3208 Fex: (360)3857675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION STTE Call 385-2294 for Inspection Permit Number: BLDO1-195 Issued: 10/19/01 Parcel Number: 989710201 Job Address: 619 Clav Street Zoning: R-3 Type: V-/hour (existine V-Nl Occupancy: R_1 Total Occupant Load: 1 Nature of Work: Construct 528 so. & atrium Owner: Marine Plaza Apartments Contractor: TBD -see Condition #1 below GENERAL CONDTTIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUHtED: Electrical -Contact Labor & Industries @ 360-417-2702 REQUIRED INSPECTIONS APPROVED/DATE TEMPORARY EROSION & SEDIMENT CONTROL Temporary erosion and sediment control measures shall be installed on-site as needed during construction to contain dirt and sediment on-site. Adjacent rights-of-way shall be kept clean through sweeping of paved surfaces, fire wash, etc. DEMOLITION Materials from construction shall be deposited in approved areas off-site in accordance with all state and local laws and ordinances FOOTINGS Entry Column Footings /"x.~ G / /~ ^ n r c/C OZ. (~j// Setbacks Footings Forms Reinforcement Typical Footing Footings Forms Reinforcement Horizontal Ties/Epoxy to existing w/ PBS66 Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 Permit MBI.DOI-195 REQUIRED INSPECTIONS APPROVED/DATE FOUNDATION Stem Wall Forms //~~~ Reinforcement Anchor Bolts & Washers Engineered Holdowns FRAMING - Type V I-hour walls /1~(wiN ~c.oo~ Ba-t-k ~/LC~oL Treated Wood to Concrete Anchor Bolts Positive Connection Roof -Engineered joist plan to be on-site at time of Inspection ~X7 ~ Glc,)~i 2~~~dL Blocking Roof Drains Window Safety Glazing Roof TII Positive Connection - HI each joist per Engineering Fire Blocking ~A~zfJLAT~esJ R~~ R W h i ti B i q 12~~'u~0 ~~~~Z~ ~C er es s ve arr eat er DRYWALL -Type YI-hour Walls Z l(~ to ~ Ceiling /` FINAL Property address posted -min. S"numbers Fire Department Sign-Off Electrical Sign-off (I. & I) Barrier Free Access Thresholds Power Operated Door Switches Lever Hardware - Exit Signage & Illumination Final -Building /(~ ~l[ ! (©~ GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 3 «B~~-~~ 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; cat1385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to schedulin¢ the Buildine Department's Tinal inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. S 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3