Loading...
HomeMy WebLinkAboutBLD01-193 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO1-1938-1 Issued: 10/23/01 Parcel Number: 957602902 Job Address: 2016 Water Street Suite C Zoning: CC=11 Type: NC Occupancy: NC Total Occupant Load: NC Nature of Work: Remodel ezistin2 restroom to meet ADA requirements Owner: Liehthouse Associates (tenant: WA State Liquor Storel GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 r' RF.fliiiRF.1) iNSPF.CTinNR Wetamm & Katz Building 181 Quincy Street Suite 301 Pat Townsend WA 98368 Phone: (360) 379-3208 Faz: (360) 3854675 Contractor: Same as Owner APPRnVF.n/nATF, DEMOLITION Materials from construction shall be deposited in approved areas off-site in accordance with all state and local laws and ordinances PLUMBING -Barrier Free design required Rough-In (D-V-T & Clean outs) // / ~ S Water Supply Pipe Insulation (R-3) Pressure Reduction valve if> 80 psi Water Heater R-10 under if on slab Seismic Restraints Pressure Relief Valve Drain to exterior MECHANICAL Bathroom Fan r7 .`~ - Environmental Air Exhaust ducting (with backdraft damper), insulation (R-4) and termination (3' from ~, C building openings) ' IS~°1 i~ r ' CaII 48 hours before you die for utility line locates 1-500-424-5555 Page 1 of 3 r Permit llBLDOld 93R-7 ' RE UIRED INSPECTIONS APPROVED/DATE FRAMIN T~hres old -maximum %a" ~' -' O J< " Fixture Mounting Heights and Dimensions --+-_'~~ ~ [ l • ~ ~ • d --'---`-~- DRYWALL Walls Ceilin ©\1' ~ j ~~ t7 g J~ ~ . I) "1U' ~t FINAL Property address posted -min. 5"numbers Fire Department Sign-Off Electrical Sign-off (L & I) Barrier Free Access Thresholds Lever Hardware Plumbing Wall & Floor Sanitation Final -Plumbing Final -Mechanical Finer] -Building ~ Z/~/~ ~ GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspeMed prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shalt review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspeMion is required after inspection report corrections are completed. Call 48 hours before you dig for utility line locates I-800-424-5555 Page 2 of 3 Pecmi[ #BLD04193R-1 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works aaoroval must be received prior to scheduline the Buildine Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits ezpire if no progress has been made within sia months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3 Watemuut & Katz Building lgl Qu'u~cy St., Suite 301 Port Tow~w~d, WA 9g36g Phone (360) 379-3208 Fax: (360) 383-7673 L~ CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE CaI1385-2294 for Inspection Permit Number: BLDO1-193 Issued: 9/20101 Parcel Number: 957602902 Job Address: 2016 Water Street Suite C Zoning: CC_II Type: N/C Occupancy: N/C Total Occupant Load: No Chance Nature of Work: Install cedar sidine on metal-framed buildine Owner: Lighthouse Associates Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE RF,nTTTRF.n TNSPF,C'TTnNS APPROVED/DATE DEMOLITION All construction debris to be deposited in Jefferson County Landfill or other location in accordance with all local, state and federal laws FRAMING-Permit issued per attached scope of work. Plan revision required rf /O~ ~ ~ / „/1 / ~ ~ i/~ demolition reveals need for additional work l. Sheathing Flashing Siding FINAL Address Numbers - 5" numbers of contrasting color posted near main entrance of building and visible from street per City Ordinance Final -Building Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Pertnh gBLD01-193 GENERAL 1. Contractors working on this project are required to have a Labor 8c Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 3852294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspeMed. For Public Works inspection call 3852294, press 3. A minimum of twenty-four hours notice is required. Public Works souroval must be received arior to scheduline the Buildine Deuartment's final inspection. ?. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within su months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2