HomeMy WebLinkAboutBLD01-191Walerntan @ Katz Building
181 Quincy SL, Suile 301
Pon Townsend, WA 98368
Phone (360) 379.3208 Faz: (360) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDO1-191
Job Address: 651 Cleveland Street
Occupancy: N/C Type: N/C
Issued: 09/05/01 Parcel Number: 948 324 901
Zoning: C_II
Total Occupant Load: No Chance
Nature of Work: Repair and replace roof: remove existing roofing, and install new
torch-down roof covering on flat sections, and replace slate sections with synthetic
slatee
NOTE Repair/replacement of roof structural members (e.g., roof rafters, joists,
sheeting, etc.) requires revision to this permit.
Owner: Manresa Castle Contractor: All About Building
Terry - (385-2139)
GENERAL CONDITIONS APPLY -SEE LAST PAGE
REQUIRED INSPECTIONS
APPROVED/DATE
SEDIMENT CONTROL
Rights of way shall be kept free of dirt and debris and
swept as needed during construction.
DEMOLITION
Alf construction debris to be deposited in Jefferson
County Landfill or other location in accordance with all
local, state and federal laws.
ROOF VENTING
Provide ventilation if current venting is inadequate to meet
code re uirements.
ROOFING
Install all roofing material per manufacturer's
s ecifications and UBC Cha ter 15
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Pemtit #BLD01.191
REQUIRED INSPECTinNS APPR(IVF,n/nATF.
ROOF DRAINAGE
Drainage to be provided per UBC Section 1506
FINAL
" ~
Building Numbers - 5
numbers of contrasting color /
~5
~~
0
I,V
posted near main entrance of building and visible from ~
/
/
vl
street per City Ordinance
Final -Building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a Ciri business license. Failure to provide proof of this
documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; ca11385-2294. Adjacent rights-of--way shall be kept
free of dirt debris. Soils exposed during construction shall be temporarily stabilized with
mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings,
sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent
properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced k:-`
panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted
by required inspections.
S. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca1138S-2294.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required Tor
anon-residential project.
8. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the
Building Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMTT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-SSSS
Page Z of 2