Loading...
HomeMy WebLinkAboutBLD01-190Waterman & Katz Bwlding 181 Quinry 54ee1, Suite 301 P«t 7ownvend, WA 98368 Phone'(360)379-3208 Fsc: (360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERNIIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO1-190 Issued: 9/20101 Parcel Number: 931200105 Job Address: 1137 Van Ness Street Zoning: RR=II Type: V-N Occupancy: R-3 Nature of Work: Construct New Residential Foundation Occupant Load: NC Owner: Claudia Cutsinaer Contractor: Dave Johnson Construction GENERAL CONDITIONS APPLY -SEE LAST PAGE NOTE: FOUNDATION PERMIT ONLY RF.nTTTRF,T) TNSPF.CTIONS APPROVED/DATE TEMP EROSION & SDM'T CONTROL See General Condition No. 2 -install on-site as needed during construction to prevent sediment from leaving the site and to eliminate tracking of soil onto the street FOOTINGS Setbacks - NC l Z~~ z~g/ Footings Forms Reinforcement I 'or footings FOUNDATION Stem Wall Forms `f~~O~® I Reinforcement Anchor Bolts w/ 2" x 2" x 3/16" square washers Vents Crawl space access Girder to Concrete Beam Pockets 1 ~~ ~f//QC/ ~J~ %~' l ' Positive Connection Treated Wood to Concrete Shield under Posts 6 mil black poly Call 48 hours before you dig Tor utility line locates 1-800-424-5555 Page 1 of 2 Pmnit q BLD01-I90 FINAL House Number -check for 5" numbers Smoke Detectors required throughout existing house per 1997 UBC: one in each sleeping room and in each area hallway leading to each sleeping room with a minimum of one detector on each floor 1 Z~!°Z Final -building GENERAL CONDTI'IONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for proteMion of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-229'4. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Departments final inspection. 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within sia months, or if no inspections are done by the Building Department within one year. Call for at {east one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Obtain revisions from the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. !~ Ca1148 hours before you dig for utility tine locates 1-800-424-5555 Page 2 of 2