HomeMy WebLinkAboutBLD01-189Waterman & Katz
I81 Quincy Street Srtile 301
Pat Toxmseal, WA 98366
Phone (360) 379-37A8 Faz (360) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD~ 1-1 g9
Job Address: 1029 Lawrence Street
Total Occupant Load: No Chance
Issued: 9110/01 Parcel Number: 989 713 507
Zoning: MC-III Type: VV=N Occupancy: B
Nature of Work: Reulace window with door: construct aorch
Owner: Crvstie Kisler
Contractor: Wallvworks
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RF(TTTTRFTI TNCPF.('TTnNC
APPROVF,D/DATF.
FOOTINGS
Setbacks
Porch Pier Footings
Reinforcement
Positive Connection/Post Base
FRAMING l~~ /~`
Posts
Beams
Rafters
Blocking
Positive Connections.
Treated Wood to Concrete
FINAL -Accessible entrance located Lawrence Street side
Fire Department Sign-Off
House Numbers posted (minimum 5")
Exit Signage
Step
"Threshold
Lever Hardware
Deck -Final
Call 48 hours before you dig utility line locates: I-800-424-5555
Page 1 of 2
Permit # BLDOI-189
GENERAL CONDTITONS
1. Contractors working on this projert are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294.. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for proteMion of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review snd oversee correction of any snd all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received arior to
scheduling the Buildin¢ DepartmenPs final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-
residential project.
8. All building permits expire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active..
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig utility line locates: 1-800-424-5555
Page 2 of 2