Loading...
HomeMy WebLinkAboutBLD01-188W etemian & Katz Building 787 Quinry Street, Suile 301 Port Townsnd, WA 98368 Phone: (360)379-3208 Fax: (360)379b923 CITY OF PORT TOWNSEND l~ CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: I3I.D~ 1-1 g8 Job Address: 4748 Mason Street Nature of Work: Construct 406 so. ft. Garaee Owner: Anthony & Betty Harriman Issued: 09/18/01 Parcel Number: 951-904-701 Zoning: RR=I Type: VV=N Contractor: Cranston Construction (Randy: 301-2390) Occupancy: U-1 GENERAL CONDITIONS APPLY -SEE LAST PAGE RF,OiTiRED INSPECTIONS APPROVED/DATE TEMPORARY EROSION & SEDIMENT CONTROL See General Condition No 2 FOOTING //~J Setbacks ~/ y r Footings Forms Reinforcement LIFER FOUNDATION Stem Wall Forms Reinforcement Anchor bolts w 2"x 2" x 3/16" washers Alternate Braced Wall Panel Holdowns FRAMING Engineered truss plan to be on-site at time of inspectiorT Walls Treated Wood to Concrete Ceiling/Roof Blocking Truss Positive Connection " ~' ~d Weather Resistive Barrier $UL~4T /D^/ ~ /9 Gl~, Call 48 hours before you dig for utility line locates I-800-424-5555 Page 1 of 2 //~ Permit q HLD01-I88 REQUIRED INSPECTIONS APPROVED/DATE DRYWALL/NAILING Walls _ n / ] / ' ~ Ceiling ,®/~igl'(7, Il y~ I / Garage House Occupancy Sepazation FINAL Final -Building ~ ?J/ ~ /~ 2 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance. Adjacent rights-of--way shall be kept free of dirt & debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. ~~ 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspeMion on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A 7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required fora non- residential project. 8. All building permits ezpire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2