Loading...
HomeMy WebLinkAboutBLD01-186 r1 ~~ ~J Building and CommuniTy Development Waterman&Katz Building 181 Quincy Street Suite 301 Pon Townsend, W A 98368 PVwne:{360)379-3208 Fax: (360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOl-1g6 Issued: 09/07/01 Parcel Number: 955 900 045 Owner/Contractor: Hamilton Heights LLC Installer: Kozelisky's Home Services WAINS0626 Job Address; Lot 45; 2257 Highland Loop Zoning: PUD Type: V_N Occupancy: R-3/U-1 Total Occupant Load: 512 Nature of W ork: Set Manufactured Home with attached site-built garage and deck. GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUH2ED: Electrical -Contact Labor & Industries @ 360-417-2702 ***Hours of Construction are limited to 7:30 a.m. to 6:00 p. m. Monday through Friday and prohibited on weekends and national holidays*** APPROVED/DATE TEMPORARY EROSION & SEDIMENT CONTROL See details attached to M]P and general condition #2 Silt Fence Drive Off Mat SLAB/CONCRETE Setbacks ~~~~~®~ (!// Forms 111 ~~ Monolithic Slab/Foundation (garage) Reinforcement Anchor Bolts ~ ~ Deck Piers ~~/Ol Alternate Braced Wall Panel Holdown Hardware LIFER RE UIRED INSPECTIONS Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 r Permit # BLDOI-186 ' REpUIRED INSPECTIONS APPRnVED/DATE PLUMBING (prior to skirting) W t l M i t S h l b ll l a er upp y - a u -off va n s ve (port or a va ve) installed in water supply piping prior to connection to home, f l ~I l ~ 1 ~1 min. 3/."diameter, same as supply pipe 1. Pressure Reduction Valve if> 80 psi Hose Bibs (backflow protection required) Pipe Insulation -Outside & in crawl space Pressure Test -100 p.s. i. for 15 minutes Pressure relief valve drain - to exterior of skirting, exhaust dowmvard between 6"and 24"above ground Drainage Piping -sloped min. %."per foot MECHANICAL (prior to skirting) Ducts & Duct Insulation ~ ~ f ~ Dryer Exhaust -vented to outside. Extension into crawl space ' I requires venting through skirting with no dips; follow dryer marmfaeturer's instructions; total combined length of ducting not to exceed 14' w/ 2-90° elbows FLOOR FRAMING (prior to skirting) /~ Anchors ~~''to I ~p ~ Steel Support Piers -Load-stamped and installed per f `f ~, manufacturer's installation manual; clearance of I S"min. from lowest point of I-beam and the ground or footing for min. of 75% of area under home w/ 12"min. elsewhere unless installation manual specifies; otherwise area around home graded to provide runoff away from home. FRAMING: Engineered roof truss plan to be on-site at time of inspection Walls ~/ '~18 ~ nn Alternate Braced Wall Panels V // l.~ Header Roof Garage/House Attachment DRY WALL NAILING /~ '''a/d~ Garage/I-Iouse Occupancy Separation with 20 minute 6 self-closing door Ca1148 hours before you dig for utility Tine locates 1-800-424-5555 Page 2 of 4 Pem~it # BLD01-186 FINAL Public Works Sign-Off Electrical (L & I) Sign-Off House Number -minimum 5" numbers Plumbing Mechanical Deck Pressure-Treated Framing Positive Connections Final -Building No holes or gaps greater than '/. "allowed in skirting. Skirting to be rated for contact with earth if backfill is involved. Crawl space ventilation per installation manual @ I sq. ft./ISO sg. ft. (12 req'd.),~ located close to corners, on at least two opposing sides for cross ventilation. Crawl space access must provide access to all areas under home; minimum 18 " x 24" unless specifred otherwise; covered with vinyl, pressure-treated wood or metal. gi~vbz- .~,.4 GENERAL CONDITIONS I. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5, Re-inspection is required after any corrections are completed. Call 48 hours before you dig for utility line locates I-800-424-5555 Page 3 of 4 ~~~ Permit p BLDOL186 ^ 6. The Building Departmenfs unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Departments final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits eapire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Cal! for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4