CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOl-1g6 Issued: 09/07/01 Parcel Number: 955 900 045
Owner/Contractor: Hamilton Heights LLC Installer: Kozelisky's Home Services WAINS0626
Job Address; Lot 45; 2257 Highland Loop Zoning: PUD Type: V_N Occupancy: R-3/U-1
Total Occupant Load: 512 Nature of W ork: Set Manufactured Home with attached site-built garage
and deck.
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REOUH2ED:
Electrical -Contact Labor & Industries @ 360-417-2702
***Hours of Construction are limited to 7:30 a.m. to 6:00 p. m. Monday through
Friday and prohibited on weekends and national holidays***
APPROVED/DATE
TEMPORARY EROSION & SEDIMENT
CONTROL
See details attached to M]P and general condition #2
Silt Fence
Drive Off Mat
SLAB/CONCRETE
Setbacks
~~~~~®~
(!//
Forms 111 ~~
Monolithic Slab/Foundation (garage)
Reinforcement
Anchor Bolts ~ ~
Deck Piers ~~/Ol
Alternate Braced Wall Panel Holdown Hardware
LIFER
RE UIRED INSPECTIONS
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
r
Permit # BLDOI-186 '
REpUIRED INSPECTIONS APPRnVED/DATE
PLUMBING (prior to skirting)
W
t
l
M
i
t
S
h
l
b
ll
l
a
er
upp
y -
a
u
-off va
n s
ve (port or
a
va
ve)
installed in water supply piping prior to connection to home, f
l ~I l ~ 1 ~1
min. 3/."diameter, same as supply pipe 1.
Pressure Reduction Valve if> 80 psi
Hose Bibs (backflow protection required)
Pipe Insulation -Outside & in crawl space
Pressure Test -100 p.s. i. for 15 minutes
Pressure relief valve drain - to exterior of skirting, exhaust
dowmvard between 6"and 24"above ground
Drainage Piping -sloped min. %."per foot
MECHANICAL (prior to skirting)
Ducts & Duct Insulation ~ ~
f
~
Dryer Exhaust -vented to outside. Extension into crawl space '
I
requires venting through skirting with no dips; follow dryer
marmfaeturer's instructions; total combined length of ducting
not to exceed 14' w/ 2-90° elbows
FLOOR FRAMING (prior to skirting) /~
Anchors ~~''to I ~p ~
Steel Support Piers -Load-stamped and installed per f
`f ~,
manufacturer's installation manual; clearance of I S"min. from
lowest point of I-beam and the ground or footing for min. of
75% of area under home w/ 12"min. elsewhere unless
installation manual specifies; otherwise area around home
graded to provide runoff away from home.
FRAMING:
Engineered roof truss plan to be on-site at time of inspection
Walls ~/ '~18 ~ nn
Alternate Braced Wall Panels V // l.~
Header
Roof
Garage/House Attachment
DRY WALL NAILING /~
'''a/d~
Garage/I-Iouse Occupancy Separation with 20 minute 6
self-closing door
Ca1148 hours before you dig for utility Tine locates
1-800-424-5555
Page 2 of 4
Pem~it # BLD01-186
FINAL
Public Works Sign-Off
Electrical (L & I) Sign-Off
House Number -minimum 5" numbers
Plumbing
Mechanical
Deck
Pressure-Treated Framing
Positive Connections
Final -Building
No holes or gaps greater than '/. "allowed
in skirting. Skirting to be rated for contact with
earth if backfill is involved.
Crawl space ventilation per installation
manual @ I sq. ft./ISO sg. ft. (12 req'd.),~
located close to corners, on at least two
opposing sides for cross ventilation.
Crawl space access must provide access to
all areas under home; minimum 18 " x 24"
unless specifred otherwise; covered with vinyl,
pressure-treated wood or metal.
gi~vbz- .~,.4
GENERAL CONDITIONS
I. Contractors working on this project are required to have a Labor & Industries contractor's
reeistration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Soils exposed during construction shall be
temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with
seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of
adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5, Re-inspection is required after any corrections are completed.
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page 3 of 4
~~~
Permit p BLDOL186 ^
6. The Building Departmenfs unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Departments final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits eapire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Cal! for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555