HomeMy WebLinkAboutBLD01-184w.c~®axus
181 Qrinry 3trxf, Suitc301
Pwt Towmmd. WA 98368
rmoo: (360 3~9-ssoe a..:1360~ 379~9zs
CITY OF PORT TOWNSEND
CONSTRUCTION PERNIIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDO1-1848-1 Issued: 1/24/02 Parcel Number: 947 600101
Job Address: 4114 Wilson Street Zoning: R-I Type: VV=N Total Occupant Load: 8/3
Occupancy: R-3 /U-1 Nature of Work: Revision #1: revised shear wall at earase oer attached eneineerin¢.
Owner: Allen & Alice Foa
ContraMor: Steve Coouer ConstruMion
****All elements of engineering including holdowns, framing, nailing, sheathing and
other engineered connections require inspection prior to cover****
GENERAL CONDTI'IONS APPLY -SEE LAST PAGE
SEPARATE PERMTTS REOUIItED:
Electrical -Contact Labor & Industries @ 360-417-2702
.NOTE: see original permit BLDOl-184 for other inspections.
RE UIItED INSPECTIONS
APPROVED/DATE
FRAMING:
Alternate sheaz wall:
5/8" type X GWB with 6d cooler or wallboazd nails @ 4" o.c. at
gazage side;
'h" GWB with Sd cooler or wallboard nails at 7" o.c. at house
side.
FINAL
See original inspection record.
•
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Permit # BLDDl-1848-1
1. Comractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils
ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, eta once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
minimum of twenty-four hours notice is reauired. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon- •
residential project.
8. All building permits expire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
CJ
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
r
CITY OF PORT TOWNSEND
Waterman & Katz Building
181 Qwnry Street, Suite 301
Port 7ownaend. WA 98368
Phone: (360)379-3208 Fax: (360)379-6923
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDO1-184 Issued: 9113/01 Parcel Number: 947 600 101
Job Address: 4114 Wilson Street Zoning: R-I Type: VV=N Total Occupant Load: 8/3
Occupancy: R-3/U-1 Nature of Work: Construct Sinele family residence with attached earage
Owner: Allen & Alice Fox Contractor: Steve Cooner Construction
****All elements of engineering including holdowns, framing, nailing, sheathing and
other engineered connections require inspection prior to cover****
~ssv~D ~3~0~
GENERAL CONDITIONS APPLY -SEE LAST PAGE ~~i -v '
v p~i~~s 1 ~l `~C Oy
SEPARATE PERMTTS REOUHtED: ~i
Electrical -Contact Labor & Industries @ 360-417-2702
• RE UIRED INSPECTIONS
APPROVED/DATE
TEMP EROSION & SDM'T CONTROL
See Genera! Condition No. 2 and MIP01-091
Erosion control measures shall be installed on-site per Duncan
SEPA approved plan
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS
Setbacks '' / ,/
~/ ~l~/`
Footings 111
Forms
Reinforcement
Interior Footings
Porch Pi rs
R
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 5
e~~ u e~noi-i ad`
REQUIRED INSPECTIONS
APPROVED/DATE
.J
FOUNDATION
Stem Wall
~ ~ /„r O r
Forms {
{ Y~1 l
Reinforcement
Anchor Bolts & Washers
Engineered Holdowns
Vents - ]I required
Crawl Access
Post-to-Foundation Wall Positive Connection
SLAB
Interior Footing
FLOOR FRAMING 1 nn
NOTE: Engineered BCI floor joist plan shall be on-site at time of Q'
~ ~j ~ ~ (` ''J`/
inspection
Girder
Joists
Blocking
Shield under Posts
Post-to-Foundation Wall Positive Connection
Treated Wood to Concrete
Anchor Bolts and Washers
Radiant Heat Tubing
PLUMBING:
Rough-In (D-V-T & Clean outs) 1
~
y
Water Supply //~
Gas Supply r- ~~ $ ~O'ff'J ~Iz~OLCQ I Z-~ Z
1
~
0
Water Hammer Arrestor ~a clot sand di washer 'T~~t~..~ ~Lr A7' ~Z3/OL
Hose Bibs (backflow protection required)
Pipe Insulation (R-3)
Pressure Reduction Valve if> 80 psi
Water Heater
R-I O Insulation under
Seismic Restraint - 2 places
Pressure relief valve drain to exterior, terminate
6" - 24" above ground
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 5
'-,
,J
Pemtit B BLDO7-184
RE UIRED INSPECTIONS APPROVED/DATE
MECHANICAL
Boiler -installation instructions shall be on-site at
time of inspection
Whole House Fan -upstairs laundry room
Source Specific Fans
Environmental Air Exhaust ducting (w/ backdraft
dampers), insulation (R-4) and terminus (located 3'
from opening)
FRAMING:
Walls
12/if
Engineered shear walls @ garage ®~
1 !i
Treated Wood to Concrete
Engineered Beams & Headers
Ceiling
Roof -engineered truss plan to be on-site at time of inspection
Truss Positive Connection
Engineered nailing & blocking @ roof sheathing
Roof Venting -ridge & eave
Windows -escape
Windows -safety glazing
Windows U-factor - .65 or better
Door U-factor - .40 or better
Skylights - .40 U-factor proposed/.68 required
NFRC window sticker must be on windows, skylights and doors
at inspection time
Fresh Air -window ports
Air Seal
Fire Blocking
Weather Resistive Barrier
INSULATION
Floor (R-30) _, / /jft ~~
(.(/~y~
Walls (R_19) ,/Z
~
ot
Ceiling (R-30) ~
~
Battles
Vapor Barrier: paint
6 mil black poly
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page 3 of 5
Permit k BI.D01-ISa~
REQUIRED INSPECTIONS APPROVED/DATE
DRY WALL NAII.ING
Walls
~/
Ceiling ~
~
6
Enclosed Usable Space under Stairs
Garage/House Occupancy Separation
Inferior Engineered Shear Walls
FINAL
LPG /
~~µ~D S/ QL
/ n(
_
i
l
`7
Public Works Sign-Off
House Numbers - 5" minimum
Plumbing
Mechanical
Insulation Certificate
Vapor Barrier Paint Certificate
Smoke Detectors
Final -Building `~~/d
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report correMions are completed.
_J
•
Catl 48 hours before you dig for utility line locates
I-800-424-5555
Page 4 of 5
Permit q BI,D01-I84
• 6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
minimum of twenty-four hours notice is required Public Works approval must be received prior to
scheduline the Buildine Department's final inspection.
7. Final Inspections are required prior to occupancy; A CertiScate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9, Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
n
U
• Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 5 of 5