Loading...
HomeMy WebLinkAboutBLD01-183Wmerman & Kaa 181 Quincy S1ree~ Suite 30I Port Townsend, W A 98368 ]'horse (360) 379-3208 Fax (360) 385-7675 CITY OF PORT TOWNSEND 4 CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BI,DOl-183 Issued: 8/31/01 Parcel Number: 933 300 303 Job Address: 4748 Haines Street Zoning: RR=II Type: VV=N Occupancy: R-3 Total Occupant Load: No Chance Nature of Work: Construct deck (192 sa. ftJ, stairs and railine. d Owner: Barclay Mustin Contractor: Same as Owner ~/y/~ Z ~ q-t C~ ~P 4-7~ UG E -F~ ~~ 1"~"~ ` } ~` C fi ~e A G GENERAL CONDITIONS APPLY -SEE LAST P -I~,~~y>~ ~f v-1o3. RE UIRED INSPECTIONS APPROVED/DATE FOOTINGS Setbacks Deck Pier Footings Reinforcement FLOOR FRAMING/DECK All framing members to be pressure treated, wood of natural resistance to decay, or treated with an approved preservative such as Woodlife Classic 77 Wood Preservative with water repellant (see attached). Posts Beam Joists (2" x 8") Positive Connection Post-to-Pier Post-to-Beam Treated Wood to Concrete Lag Bolts @ ledger Blocking FINAL House Numbers posted (minimum 5") Guardrails Handrails Stairs Smoke Detectors throughout existing construction per 1997 UBC Deck -Final Ca1148 hours before you dig utility line locates: 1-800-424-5555 Page 1 of 2 Permit A BI.DBI-783 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project unfit Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works aunroval must be received urior to scheduline the Buildine Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-~ residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. ContaM the Building Department C~ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig utility line locates: 1-800-424-5555 Page 2 of 2