Loading...
HomeMy WebLinkAboutBLD01-182Waterman&Katr BuiWinB _ 181 Quinq Slreet, Suite 301 Port Townsend, WA 98365 Phase: 360-379-3086 Fa:360-3857678 CITY OF PORT. TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD -THIS CARD MUST BE POSTED AT CONSTRUCTION STTE Calf 385-2294 for Inspection Permit Number: BLDOl-182R-1 Issued: 02/19/02 Parcel Number: 001 012 007 Job Address: 311 Lincoln Street Zoning: RR_II Type: VV=N Occupancy: R-3/U-1 Total Occupant Load: NC Nature of Work: Revision #1: change garage walls to concrete from wood frame Owner: Phil Hallin Contractor: Discovery Bav Construction GENERAL CONDITIONS APPLY: See last sage SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries'360-417-2702 NOTE• Annlicrrnt shall schedule u Preconstruction tYfeetiny prior to ,grading ar excavation. RF,nTTTRF.T) TNRPF,C.TTONS APPROVED/DATE REVISION #1 All elements of engineering including positive connections, straps, hangers, steel framing members, ledgers, etc. require inspection prior to cover FOOTINGS -refer to revised sheets A5, A13 & A14 Setbacks Footings Forms Reinforcement Interior Footings ~~~~,1~~1L~ ~ . 1~~L Porch Piers '1•! ~y, ~~ ~f ~/~C,i LIFER FOUNDATION Stem Wall y ~/~~Z (:I" Forms / l Reinforcement Anchor Bolts & Washers Engineered Aoldowns Q S ~ ~ ~ ` /~ ~] ~ ~ / ~ ~ / -c i / ~r ! V CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 3 /" ~j b[' ~ 2 ~ "j ~~ Building Permit ilOl-1828-1 - 1 IZ~~UIRE INSPEC/TGIO~NS /J (_J - APPROVED/DATE FLOOR FRAMING En NOTE i d TJI l l it d g : neere f oor p an on-s e an available to the Inspector at inspection time n / ~~ ( / Steel Girders & Beams ( Joists Blocking Hangers Positive Connection Girder to Concrete Ledger Connections Straps Hilti Bolts LTT Tension Ties FRAMING/INSTJLATION, ETC. See original.insgectton record FINAL -refer to original inspection record Final -building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. Call 48 hours before you dig for utility tine locates I-800-424-5555 Page 2 of 3 Building Permit #O1-182R-1 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is reauired. Public Works approval must be received riot to schedulin the Buildin De artment's final ins ection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval arior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WTTH THE APPROVED PLANS. ~_ Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3 -, [1 Watemm f Kele B~dldiog I8I Qufney sa«S SuBe 301 Pat TowmeM, WA A&768 Phone: 360J79-5086 Fas 360JB5-7673 CITY OF PORT TOWNSEND • CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOl-182 Issued: 01/09/02 Parcel Number: 001012 007 Job Address: 311 Lincoln Street Zoning: RR=II Type: V-N Occupancy: R-3/U-1 Total Occupant Load: 9 Nature of Work: Construct Single-family Dwelling with Garage Owner: Phil Hallin Contractor: Discovery Bav Construction GENERAL CONDTTIONS APPLY: See last page SEPARATE PERMITS REOUIltED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 NOTE: Annlicant shall schedule a Preconstruction Meetine prior to nradin~ or excavation. RF.OiTIRF,D iNSPEC'TiONS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL Per approved plan. Inspection required Graveled construction entrance required to prevent dirt and sediment from leaving the site Z/2~6y ~J/ (/iJ FOOTINGS Setbacks Footings Forms Reinforcement refer to Sheets A12 A14 Interior Footings Porch Piers UFER FOUNDATION Stem Wall Forms Reinforcement refer to Sheets A12 A19 Anchor Bolts & Washers Beam Packets Engineered Holdovms Highlighted on Sheet A2 CALL 48 hours before you dig for Utility line loeates 1-800-424-5555 Page 1 of 4 Bm7ding Pemtit #01-182 REQUIRED INSPECTIONS APPROVED/DATE FLOOR FRAMING NOTE: Engineered LPI floor plan on-site and available to the Inspector at inspection time Girders Joists Blocking Positive Connection Girder to Concrete Beam Pockets Treated Wood to Concrete Anchor Bolts & Washers ~ !~/~ 1/ (/ PLUMBING Rough-In (D-V-T & Clean outs) Water Supply ~ I201®v Water Hammer Arrestor Gas Supply Hose Bibbs - backflow protection required Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi Water Heater 18" A. F. F. R-10 under if electric Seismic Restraint - 2 places Pressure Relief Valve drain to exterior, terminate 6" -24" above ground L MECI~,xaCAL LPG Fireplace: provide specs on-site ,J ~ Boiler -installation instructions shall be on~rite dF~ / L-P G "~ N~ ~ P~P~ ~/5/ Z r ll~~ time of inspection Whole house fan Laurulry room S ecific Exhaust Fans (a3 bathrooms ~~ ~ d~ l~L/ Ocfm), kitchen (100 cfm) an room (50 cfin) nvironmental air exhaust duct (with backdraR dampers), in lation (R-4) an (3' from o s into b Ca1148 hours before you dig for utility line locates 1-800.424-5555 Page 2 of 4 1 • REQUIRED INSPECTIONS Building Permit #01.182 APPROVED/DATE FRANIING Walls Engineered shear walls & holdowns highlighted on ' ~~~ /may ~ / plans 'yl} (J // Ceiling Joists Roof Engineered connectors highlighted on plans Rafter/mass positive connection , Attic venting -1 sq. ft. per 150 sq. ft. of azea vented Posts, beams and headers Windows -escape Windows -safety glazing Window U-factor - .65 or better NFRC sticker must be on windows at time of inspection Air Seal Fresh Air Intake Wall Ports ~~ //d /% ~~(/~J ~~ ~ ;~ ~~ ~ Fireblocking ~ Weather Resistive Barrier INSULATION Floor (R-19 required) //~~ '7 /~~/p~ Walls (R 19 including gazage/house common wall) r Ceiling (R-30) Baffles Vapor Barrier -Walls: face stapled backed baits; Floor & ceiling: poly plastic DRYWALL NAILING Walls ~/L /~~ f Ceiling ~ ~ Garage/House Occupancy Separation Interior Braced Wall Panels FINAL p I/ / ~ ~ Z ~ c 3 Z I Landscaping -contact ,john McDonagh at 379-5085 Y C [ ( G c Works Sign-off ~ ~, a S~ ~~~ ~ ~ I P House Numbers - 5" numbers ~ C~ ~~ ~`~~ Plumbing Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors Final -building Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 3 of 4 Building Permit HOl-182 ~. GENERAL CONDITIONS 1. Contractors working on this project are requu•ed to have a Labor & Industries contractor's reeistration number and a Ciri business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures sha0 be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached detas7s). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final iuspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenri-four hours notice is required. Public Works annroval 7. Final Inspections are required- prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits expire if no progress 'has been made within siz months, or if no inspections are done by the Bus7ding Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility tine locates 1-800-424-5555 Page 4 of 4