HomeMy WebLinkAboutBLD01-182Waterman&Katr BuiWinB _
181 Quinq Slreet, Suite 301
Port Townsend, WA 98365
Phase: 360-379-3086 Fa:360-3857678
CITY OF PORT. TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
-THIS CARD MUST BE POSTED AT CONSTRUCTION STTE
Calf 385-2294 for Inspection
Permit Number: BLDOl-182R-1 Issued: 02/19/02 Parcel Number: 001 012 007
Job Address: 311 Lincoln Street Zoning: RR_II Type: VV=N Occupancy: R-3/U-1
Total Occupant Load: NC Nature of Work: Revision #1: change garage walls to concrete
from wood frame
Owner: Phil Hallin
Contractor: Discovery Bav Construction
GENERAL CONDITIONS APPLY: See last sage
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries'360-417-2702
NOTE• Annlicrrnt shall schedule u Preconstruction tYfeetiny prior to ,grading ar excavation.
RF,nTTTRF.T) TNRPF,C.TTONS
APPROVED/DATE
REVISION #1
All elements of engineering including positive
connections, straps, hangers, steel framing members,
ledgers, etc. require inspection prior to cover
FOOTINGS -refer to revised sheets A5, A13 &
A14
Setbacks
Footings
Forms
Reinforcement
Interior Footings ~~~~,1~~1L~ ~ . 1~~L
Porch Piers '1•! ~y, ~~
~f ~/~C,i
LIFER
FOUNDATION
Stem Wall
y ~/~~Z (:I"
Forms / l
Reinforcement Anchor Bolts & Washers
Engineered Aoldowns Q
S
~
~
~
` /~ ~]
~ ~ /
~ ~
/
-c
i
/ ~r
! V
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 3
/" ~j b[' ~ 2 ~ "j ~~ Building Permit ilOl-1828-1 -
1 IZ~~UIRE INSPEC/TGIO~NS /J (_J -
APPROVED/DATE
FLOOR FRAMING
En
NOTE
i
d TJI
l
l
it
d
g
:
neere
f
oor p
an on-s
e an
available to the Inspector at inspection time n / ~~
(
/
Steel Girders & Beams (
Joists
Blocking
Hangers
Positive Connection
Girder to Concrete
Ledger Connections
Straps
Hilti Bolts
LTT Tension Ties
FRAMING/INSTJLATION, ETC.
See original.insgectton record
FINAL -refer to original inspection record
Final -building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; ca11385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
Call 48 hours before you dig for utility tine locates
I-800-424-5555
Page 2 of 3
Building Permit #O1-182R-1
6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is reauired. Public Works approval
must be received riot to schedulin the Buildin De artment's final ins ection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
8. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval arior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WTTH THE APPROVED PLANS.
~_
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3
-,
[1
Watemm f Kele B~dldiog
I8I Qufney sa«S SuBe 301
Pat TowmeM, WA A&768
Phone: 360J79-5086 Fas 360JB5-7673
CITY OF PORT TOWNSEND
•
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDOl-182 Issued: 01/09/02 Parcel Number: 001012 007
Job Address: 311 Lincoln Street Zoning: RR=II Type: V-N Occupancy: R-3/U-1
Total Occupant Load: 9 Nature of Work: Construct Single-family Dwelling with Garage
Owner: Phil Hallin
Contractor: Discovery Bav Construction
GENERAL CONDTTIONS APPLY: See last page
SEPARATE PERMITS REOUIltED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
NOTE: Annlicant shall schedule a Preconstruction Meetine prior to nradin~ or excavation.
RF.OiTIRF,D iNSPEC'TiONS
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
Per approved plan. Inspection required
Graveled construction entrance required to prevent
dirt and sediment from leaving the site Z/2~6y ~J/
(/iJ
FOOTINGS
Setbacks
Footings
Forms
Reinforcement refer to Sheets A12 A14
Interior Footings
Porch Piers
UFER
FOUNDATION
Stem Wall
Forms
Reinforcement refer to Sheets A12 A19
Anchor Bolts & Washers
Beam Packets
Engineered Holdovms Highlighted on Sheet A2
CALL 48 hours before you dig for Utility line loeates
1-800-424-5555
Page 1 of 4
Bm7ding Pemtit #01-182
REQUIRED INSPECTIONS APPROVED/DATE
FLOOR FRAMING
NOTE: Engineered LPI floor plan on-site and
available to the Inspector at inspection time
Girders
Joists
Blocking
Positive Connection
Girder to Concrete
Beam Pockets
Treated Wood to Concrete
Anchor Bolts & Washers
~ !~/~
1/ (/
PLUMBING
Rough-In (D-V-T & Clean outs)
Water Supply ~ I201®v
Water Hammer Arrestor
Gas Supply
Hose Bibbs - backflow protection required
Pipe Insulation (R-3)
Pressure Reduction Valve if> 80 psi
Water Heater
18" A. F. F.
R-10 under if electric
Seismic Restraint - 2 places
Pressure Relief Valve drain to exterior, terminate
6" -24" above ground
L
MECI~,xaCAL
LPG Fireplace: provide specs on-site ,J ~
Boiler -installation instructions shall be on~rite dF~ /
L-P G "~ N~ ~ P~P~ ~/5/ Z
r ll~~
time of inspection
Whole house fan Laurulry room
S ecific Exhaust Fans (a3 bathrooms ~~
~ d~ l~L/
Ocfm),
kitchen (100 cfm) an room (50 cfin)
nvironmental air exhaust duct (with backdraR
dampers), in lation (R-4) an (3' from
o s into b
Ca1148 hours before you dig for utility line locates
1-800.424-5555
Page 2 of 4
1
•
REQUIRED INSPECTIONS
Building Permit #01.182
APPROVED/DATE
FRANIING
Walls Engineered shear walls & holdowns highlighted on '
~~~ /may ~ /
plans 'yl} (J //
Ceiling Joists
Roof Engineered connectors highlighted on plans
Rafter/mass positive connection ,
Attic venting -1 sq. ft. per 150 sq. ft. of azea vented
Posts, beams and headers
Windows -escape
Windows -safety glazing
Window U-factor - .65 or better
NFRC sticker must be on windows at time of inspection
Air Seal
Fresh Air Intake Wall Ports ~~ //d
/%
~~(/~J ~~ ~ ;~ ~~ ~
Fireblocking ~
Weather Resistive Barrier
INSULATION
Floor (R-19 required) //~~
'7 /~~/p~
Walls (R 19 including gazage/house common wall) r
Ceiling (R-30)
Baffles
Vapor Barrier -Walls: face stapled backed baits; Floor &
ceiling: poly plastic
DRYWALL NAILING
Walls
~/L
/~~
f
Ceiling ~
~
Garage/House Occupancy Separation
Interior Braced Wall Panels
FINAL p I/ /
~ ~ Z
~
c 3
Z I
Landscaping -contact ,john McDonagh at 379-5085 Y
C [
(
G c Works Sign-off
~ ~, a S~ ~~~ ~ ~
I
P
House Numbers - 5" numbers ~ C~ ~~ ~`~~
Plumbing
Insulation Certificate
Vapor Barrier Paint Certificate
Smoke Detectors
Final -building
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 3 of 4
Building Permit HOl-182 ~.
GENERAL CONDITIONS
1. Contractors working on this project are requu•ed to have a Labor & Industries
contractor's reeistration number and a Ciri business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures sha0 be installed on-site and
inspected prior to beginning construction; ca11385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached detas7s).
Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final iuspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenri-four hours notice is required. Public Works annroval
7. Final Inspections are required- prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
8. All building permits expire if no progress 'has been made within siz months, or if no
inspections are done by the Bus7ding Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility tine locates
1-800-424-5555
Page 4 of 4