Loading...
HomeMy WebLinkAboutBLD01-181Wazemun a 1CatzBuiltiog 181 Quvxy Stag, Snub 301 Pat Tarmaxl, WA 93366 Phone: (360) 3793208. Fax: (360) 3811675 • CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD01-181R-1 Issued: i1-27-O1 Parcel Number: 948-902-806 Job Address: 479 N Street Zoning: R_II Type: VV=N Occupancy: R-3/U-I Total Occupant Load:2/2 Nature of Work: Garage revisions: install exhaust fan: revise window layout: install floor drain in slab Owner: Bill Matthews /Marian Roh C, Contractor: Owner GENERAL CONDTITONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RFniTiRFn iNSPF,CTiONS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site SLAB Floor Drain ~ ~ ~ ~~~ Groundwork Plumbing Pipe Bedding Trap Seal Protection MECHANICAL Exhaust Fan FINAL -see original inspection record Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Permit#BLD01-Ie1R-1 1. ContraMors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspeMion prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduline the Buildine Department's final insceMion. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non- residential projeM. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 Waterman & Katz Building 1 BI Quincy Sveet, Suite 301 Port Townarnd WA98368 Poone: (360)379-3208 Fez: (360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDO1-181 Issued: 09-14-O1 Parcel Number: 948-902-806 Job Address: 479 N Street Zoning: RR=H Type: VV=N Occupancy: R-3/U-1 Total Occupant Load:2/2 Nature of Wark: Detached Garase with uastairs ADU Owner: Bill Matthews /Marian Roh Contractor: Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUHZED: Electrical -Contact Labor & Industries @ 360-417-2702 RE UIRED INSPECTIONS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS Setbacks Footings lO/3~~d7 /~ Forms ~ I , Reinforcement 3 #4 bars P Piers E / , FOUND ION / Stem WaU ~~~~~ ~` Forms Reinforcement Prescriptive Anchor Bolts w! 2" x 2" x 3/16" washers Engineered Holdowns highlighted on plans Waterproofing Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 •; Permit k BLD01-1 S7 REQUIRED INSPECTIONS APPROVED/DATE FLOOR FRAMING Joists Blocking Positive Connections Treated Wood to Concrete Anchor Bolts w/ 2" x 2"x 3/I6" washers ~. ~ P 2'rd ®z , PLUMBING: Rough-In (D-V-T & Clean outs) Water Supply Water Hammer Arrestor at clothes and dishwasher Gas Supply /// j~~i7 . Hose Bibs (backflow protection required) ` ~/l/ Pipe Insulation (minimum R-3) Pressure Reduction Valve if> 80 psi Water Heater Seismic Restraint - 2 places Pressure relief valve drain to exterior, terminate 6" - 24" above ground MECHANICAL LPG Stove -manufacturer's installation instructions shall be on-site at time of Inspection Whote House Fan -Bathroom Kitchen Fan FRAMING n ~J Walls Engineered nailing & hold downs highlighted on plans ~`//// >'l~2 t~D ~ f/ "! Ceilings `7 Roof Rafter Positive Connection Blocking Attic Venting < @ ridge & eave Windows -escape Window safety glazing Windows Ufactor - .40 or better NFRC window sticker musi be on windows and doors at inspection time Air Seal Fresh Air Intake (Wall Ports) Fire Blocking Weather Resistive Barrier J LJ Call 48 hours before you dig for utility line locates I-800-424-5555 Page 2 of 4 Pemtit d BLIJOLI&I RFniTiRF.il TNCPF,f Ti(1NC APPROVED/DATE INSULATION Floor (R_25) Walls (R-19 Ceiling (R=30) Baffles Vapor Barrier: Backed Batts (walls), PVA Primer (foor & ceiling DRY WALL NAILING Walls Ceiling Garage/House Occupancy Separation FINAL LPG House Numbers - 5" Plumbing Mechanical/Heating Insulation Certificate Smoke Detectors Weep Screen/Flashing Vapor Barrier Paint Certificate Final -Building 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shal- be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details).Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Ite-inspection is required after inspection report corrections are completed. • Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 3 of 4 -~ PemitR BLD01-181 6. The Building Department is unable to pass final inspection on your projeM until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works aooroval must be received urior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- . residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval arior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • • Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 4 of 4