HomeMy WebLinkAboutBLD01-180W azerman & Kazz Building
I81 Quiiuy Sveet, Swte 301
Port Townsend WA 96368
Phone: (360)379-3208 Faz: (360)385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERNIIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
CaI1385-2294 for Inspection
Permit Number: BLDOl-180 Issued: 09/13/01 Parcel Number: 974 101 002
Job Address: 1656 Tvler Street Zoning: RR=H Type: VV=N Total Occupant Load: 4
Occupancy: R-3 Nature of Work: Construct Sin¢le family residence with Attached
Carport and Upstairs Art Studio
Owner: Elizabeth Merrill Contractor: Owner
*** *All elements of engineering including holdowns, framing, nailing and other engineered connections
require inspection prior to cover****
GENERAL CONDTTIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
REQUIRED INSPECTIONS
APPROVED/DATE
TEMP EROSION & SDM'T CONTROL-
See General Condition Na. 2 andMIP01-088
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS -Contractor shall offer proof of compliance
with State and local licensing /
~ (3i / ~/~ /
Setbacks `
Footings
Forms
Interior Footings
Piers @ exterior deck
Rei rcement -Prescriptive
ER
C~
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 5
E
Permit p BLDOI-I80
REQUIRED INSPECTIONS
APPROVED/DATE
FOUNDATION
Stem Wall
Forms
Reinforcement -prescriptive, sheet A2
Anchor Bolts & Washers -per shear wall schedule
Engineered Holdowns (highlighted on plans)
Vents - IS required
Crawl Access
Beam Pockets
q
~ O l l l
FLOOR FRAMING
Girder
Joists ~~
~
Pony Walls r
l
l
Radiant Heat Tubing
Blocking
Shield under Posts
Positive Connections
Girder to Concrete
Beam Pockets
Treated Wood to Concrete
Anchor Bolts and Washers
PLUMBING: nn '
wU ~ W S
~ Z T~DL
Rough-In (D-V-T & Clean outs) V
Water Supply
Gas Supply 0'K ~wb G ~ •x.6-0 ~.
Water Hammer Arrestor @ clothes and dishwasher
Hose Bibs (backflow protection required)
Pipe Insulation (R-3)
Pressure Reduction Valve if> 80 psi
Water Heater
Seismic Restraint - 2 places
0.K. ~~t, G
I • ~` t " ~° ~-
Pressure relief valve drain to exterior, terminate
6" - 24" above ground
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page 2 oT 5
Permit # 13LW I ~I80
RF.OUIRED INSPECTIONS
APPROVED/DATE
MECHANIC
Boil -installation instructions shall be on- 'eat
ti ' aspeetion-~'~
Whole House Fan -Upper floor ceiling
Source Specific Fans
Environmental Air Exhaust ducting (w/ backdraft / ~~
dampers), ~,
l~a(/6~ ~ Y,~
insulation (R-4) and terminus (located 3' from opening) [1 G `~~
FRAMING:
Walls -engineered paned walls
Engineered Straps & Framing Anchors -Engineered ~ ~ ~ ~
~ ~Z (?
(highlighted on plans)
Treated Wood to Concrete
Engineered Posts, Beams & Headers
CeilinglRoof pre manufactured trusses; engineered truss
plan on-site @ time of inspection.
Roof Positive Connection
Roof Venting -continuous soffit & ridge vents
Windows -escape
Windows -safety glazing
Windows U-factor - .65 or better
Skylights U-factor - .58 or better
NFRC window sticker must be on windows, skylights
and doors at inspection time
Air Seal
Fresh Air Intake (Wall Ports required)
Doors U-factor - .40 or better
Fire Blocking
Weather Resistive Bamer
INSULATION ~~
~
Floor - (R_19) ~~
Walls-(R=19)
Ceiling - (R-30) ~~~~nn
C~l/~
Baffles (if applicable)
Vapor Barrier required - 4 mil poly @ walls
DRY ~'6'ALL NAILING
Walls ~j
~ p /Q~
(~
/
Ceiling (
Enclosed Usable Space under Stairs
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 5
PertnitNBLD01-180 r.
FINAL
Public Works Sign-Off t
House Numbers - 5" /~` b
LPG 1`f'~ 1ory .,
Plumbing C7" ~,.~
MechanicaUHeating
Insulation Certificate
Vapor Barrier Paint Certificate (if applicable
Smoke Detectors
Final -Building
~~
~ l~
I. Contractors working on this project are required to have a Labor & Industries contractor's
re¢istration number and a Ciri business license. Failure to provide proof of this documentation
prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and
inspected prior to beginning construction; ca11 38 5-22 94. Measures shall include installation of
silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way
shall be kept free of dirt debris. Soils exposed during construction shall be temporarily
stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding,
plantings, sodding, etc. once construction is complete. Applicant is responsible for protection oP
adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall
panels (ABWP) require inspection prior to cover.
4. .Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspectio~l iS required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received
prior to schedulin¢ the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a
non-residential project.
•
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page 4 of 5
^' Permit k HLDOI-180
'' 8. All building permits expire if no progress has been made within six months, or if no inspections
are done by the Building Department within one year. Call for at least one inspection per year
to keep your building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the
Building Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH TAE APPROVED PLANS.
CaII 48 hours before you dig for utility line locates
I-800-424-5555
Page 5 of 5
"` ;
~.