Loading...
HomeMy WebLinkAboutBLD01-179W ate~man and Katz Building 181 Quincy Street Suite 301 Port Townsend, W A 98368 Phone (360) 379-3208 Faz (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO1-179 Issued: 08/09/01 Job Address: 1230 25`h Street Zoning: R-II Occupancy: RR=II Total Occupant Load: N/C Nature of Work: Renair fire-dama¢ed aaraee. Owner: Corey Roger Contractor: Serv ro GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RF.f1T1TRFT) TNCPF.f TTnNS Parcel Number: 961-200-405 Type: VV=N APPRt7VF.D/DATE PLUMBING Replace valve box DRYWALL NAILING Walls Ceiling FINAL House Numbers -check for 5" numbers Smoke Detectors throughout -one in each sleeping room and in each area leading to sleeping room with minimum one detector on each floor Final -Building Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Building Permit #BLD01-199 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istration number and a City business license. Failure to provide proof at this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt and debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible Tor protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's £mal inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. CaII for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval orior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2