HomeMy WebLinkAboutBLD01-179W ate~man and Katz Building
181 Quincy Street Suite 301
Port Townsend, W A 98368
Phone (360) 379-3208 Faz (360) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDO1-179 Issued: 08/09/01
Job Address: 1230 25`h Street Zoning: R-II
Occupancy: RR=II Total Occupant Load: N/C
Nature of Work: Renair fire-dama¢ed aaraee.
Owner: Corey Roger Contractor: Serv ro
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RF.f1T1TRFT) TNCPF.f TTnNS
Parcel Number: 961-200-405
Type: VV=N
APPRt7VF.D/DATE
PLUMBING
Replace valve box
DRYWALL NAILING
Walls
Ceiling
FINAL
House Numbers -check for 5" numbers
Smoke Detectors throughout -one in each sleeping room
and in each area leading to sleeping room with
minimum one detector on each floor
Final -Building
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Building Permit #BLD01-199
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
re¢istration number and a City business license. Failure to provide proof at this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt
and debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible Tor protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's £mal inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits ezpire if no progress has been made within siz months, or if no inspections are
done by the Building Department within one year. CaII for at least one inspection per year to keep
your building permit active.
9. Revisions require review and approval orior to making changes in the field. Contact the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2