Loading...
HomeMy WebLinkAboutBLD01-178Watamm RKatzBudding 1 Bl Quincy Street, Suite 301 Pat Townwd, WA 98368 Phae: (360)379-5066 Fax: (360)3817675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDO1-178R-4 Issued: 08/27/02 Parcel Nmnber: 001022 023 Job Address: 350 Castellano Wav Zoning: R-III Type: V 1-hour Occupancy: R-1 Total Occupant Load: 29 Nature of Work: Revision #4: Divide eaistina parlor saace into smaller parlor and seaarate stora¢e area Owner: San Juan Avenue LLC Contractor: Owner - (206) 790-4860 GENERAL CONDITIONS APPLY -SEE LAST PAGE ~ L p , V ~l/ / 7s SEPARATE PERMTI'S REQUIRED: ZS,(/rv /~~D~83 Electrical -Contact Labor & Industries @ 360-417-2702 l( vZ~ ze2 ~ Zt~ NOTE: Hours of Construction are limited to 7a.m. - 6 p.m., Monday through Friday and prohibited on weekends and national holidays REOUIItED INSPECTIONS APPROVED/DATE FRAMING -barrier free design required 20 minute door Door to not intrude greater than''/z of corridor width Threshold n ~Z71~ Door Hardware Approach DRY WALL NAILING One-hour walls FINAL -see original inspection record Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 ra®easimvnsa-~ GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contraMor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures per the approved plans shall be installed on- site and inspected prior to beginning construction; cs11385-2294. Measures may include installation of sik fencing and graveled construction entrance. Adjacent rights-of-way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. App6cairt is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your projeM until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenri-four hours notice is required Public Works anuroval must be received prior to _L _.l__.!_ - •. _ T • 1. _ w . .• r • • .• 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits ezpire if no progress bas been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval rior to making changes in the field. ContaM the Building Department at 379-5086 rip to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 WaWmm R Katzauildieg 18I Quinry Street, Suite 301 Pat Tamsmd, WA 98368 Phone: (360) 3A-5086 Fu: (360) 3817675 CITY OF PORT TOWNSEND CONSTRUCTION PERNIIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Pernik Number: BLDOl-178R-3 Issued: 04/29/02 Parcel Number: 001022 023 Job Address: 350 Castellano Wav Zoning: R=III Type: V 1-hour Occupancy: R-I Total Occupant Load: 29 Nature of Work: Revision #3: submit details for 1-hour floor & roof assemblies Owner: San Juan Avenue LLC Contractor: Windward Construction GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUIItED: Electrical -Contact Labor & Industries @ 360-417-2702 NOTE: Hours of Construction are limited to 7a.m. - 6 p.m., Monday through Friday and prohibited on weekends and national holidays ~REOUIRED INSPECTIONS • APPROVED/DATE FLOOR FRAMING Joists -engineered TJI plan shall be on-site at time of inspection One -hour floor ceiling assembly per TJI specs FRAMING Ceilings -One-hour roof/ceiling assembly per Gypsum Association Roof -pre-engineered truss plan required to be on-site at time of framing inspection DRY WALL NAILING One-hour floor/ceiling assembly per attached TJI specs One-hour rooflceiling assembly per attached Gypsum Association details FINAL -see original inspection record Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Pavrit%BIDOI.I7B&d GENERAL CONDITIONS 1. Contractors working on this project are required to Gave a Labor 8t Industries contractor's registration nnm r sad a City business license. Failure to provide proof of tlis documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures pa the approved plans shall be installed on- site sad iospeded prior W begiming construction; ca11385-2294. Measures may include installation of siU fencing and graveled construction e~rance. Adjacent rights-of-way shall be kept free of dirt debris. Soils ezposed during construction shalt be temporan7y stabil'rced with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. AU elements of engineeri~ including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are wmpleted. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements Gave been completed and inspected. For Public Works inspection ca11385-2294. A 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required tot a non- residential project. 8. All building perroits ezpire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. CaU for at keel one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to mating changes in the field. Contact the Building Department at 379-5086 prior to mating changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. C~ • CaB 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 W etemun & ICetx Building 18I Quiny Street, Suite 301 Port Townsend, WA98368 Phone: (360) 379-3208 Fac: (360) 3857675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO1-1788-2 Issued: 09/18/01 Parcel Number: 001022023 Job Address: 350 Castellano Wav Zoning: R_III Type: V_N Total Occupant Load: NIA -Revise Foundation Holdowns Occupancy: R-I Nature of Work: Chance Foundation Holdowns Owner: San Juan Avenue LLC Contractor: Owner ****All elements of engineering including holdowns, reinforcing steel, anchor bolts and connections require inspection prior to cover**** GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: . Electrical -Contact Labor & Industries @ 360-417-2702 FOUNDATION Engineered Holdowns -Revise Holdown & Fastener schedule 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 3852294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept tree of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. CaII 48 hours before you dig for utility line locates I-800-424-5555 Page 1 of 2 Parttit # BLD01-1788-2 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any snd all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. '8. All building permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Coil for at least one inspeMion per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800.424-5555 Page 2 of 2 Waterman & Katz Building ]87 Qninry Street, Suite 301 Port Townsend WA 98368 Phone: (360)379-3208 Fax: (360)385-7675 • CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call •385-2294. for Inspection CITY OF PORT TOWNSEND Permit Number: BLDOl-1788-1 Issued: 09/04/01 Parcel Number: 001022023 Job Address: 350 Castellano Wav Zoning: R=III Type: VV=N Total Occupant Load: NIA - Foundation Only Occupancy: R-1 Owner: San Juan Avenue LLC Contractor: Owner ***flll elements of engineering including holdowns, reinforcing steel, anchor bolts and connections require inspection prior to cover**** GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: • Electrical -Contact Labor & Industries @ 360-417-2702 RF.nTTTRFn TNSPF,C"i'TnNS APPRnVF.T)/nATF. EROSION & SEDIMENT CONTROL Erosion control measures shall be installed and inspected per approved stormwater plan prior to footing work; see SDP#01- 042 FOOTINGS Setbacks „q ~/~f /O/ / /// ` Footings ~ l / / l I/ Forms Reinforcement -grade 60 steel Interior Footings UFER • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Nature of Work: Construct Foundation Pemtil#BLD01-176R-1' FOUNDATION Stem Wall Forms Reinforcement Anchor Bolts & Washers -per shear wall schedule Engineered Holdowns Crawl Access Foundation Vents - 42 required Beam Pockets Elevator Pit Ri~~~o~ ~ fl. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC~ measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels, (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project untH Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made wkhin six months, or if no inspections are done by the Building Department within one year. CaII for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the Tield. ContaM the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800.424-5555 Page 2 of 2 Waterman & Katz Buildin8 181 Quincy StreeS Suile 307 Port Townsend, WA 98368 Plane 0360) 379-5086 Fax: (360) 385-7675 r~ CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO1-178 Issued: 10/10/01 Parcel Number: 001022023 Job Address: 350 Castellano Wav Zoning: R-III Type: V 1-hour Occupancy: R-1 Total Occupant Load: 29 Owner: San Juan Avenue LLC Contractor: Windward Construction GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 ' ~ p3GI0~ ~~~ ~Nl~ q y~°y ~ I ~ I Dyl j'DL ~, L, o TE: Hours of Construction are limited to 7a.m. - 6 p.m., Monday through Friday and prohibited on weekends and national holidays RF,OTTTRF,D TNSPF,CTTnNS APPROVED/DATE FOOTINGS/ FOUNDATION -refer to foundation permit BLD01-178R-1 FLOOR FRAMING Girders ~ ~ l~ ' ~ //'~~ ~/ Girder to Concrete Beam Pockets Joists -engineered TJI plan shall be on-site at time of inspection Blocking Craw( Access @ janitor closet Shield under Posts Porry Walls Double joists under bearing walls Positive Connections Treated Wood to Concrete Anchor Bolts & Washers - S/8"per shear wall schedule Nature of Work: Construct 9 unit condominium comolex Call 48 hours before you dig for utility line locates I-800-424-5555 Page 1 of 5 REQUIRED INSPECTIONS APPROVED/DATE Permit#BLD01-178 PLUMBING: Rough-In (D-V-T & Clean Outs) Water Supply Gas Supply Water Hammer Arrester @ clothes 8c dishwashers Hose Bibs (backflow protection req'd) Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi Water Heaters Seismic Restraint - 2 places Pressure relief valve drain to exterior Barrier-Free Required - no Type A; all units on level one shall be Type B units /,,/ ~ W/ ~T/ I MECHAHICAL -electric heat; budding complies prescrtptiveljn Fire/Smoke Dampers 1;s needed @ corridor penetrations, etc. Whole House Fans - 1.5 sones max., with manual and automatic timer Kitchen fans - 100 cfin Environmental air exhaust ducting (with backdraft ' ~ dampers), insulation (R-4), and terminus (3 from / n openings into bui-ding) ~ lQ D ~ `,'{`/ FRAMING Walls - 1-hour construction throughout / Engineered Shear Walls ~ ~~O / Dwelling Unit Separation Walls l Blocking for Type B Accessible Units @ F-1 Ceilings Roof - pre-engineered truss plan required to be on-site at time of framing inspection Attic access Attic draft stops Attic Venting Posts, beams & headers - Glu-lams & parallams per structural engineering Windows -escape Windows -safety glazing Windows Ufactor - .40 or better NFRC window sticker must be on windows at inspection time Air Seal Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 5 Pemti[ N BLDOI.178 RF.niTiRF.D iNSPF.CTiONS APPROVED/DATE FRAMING (cont'd.) Fresh Air -window ports ~~~ 0~ Doors -undercut ''/z" for fresh air Door UFactor - .20 or better Truss Positive Connection Fire Blocking Firestopping Rated Shaft Weather Resistive Barrier CHIMNEYS Chimney Straps Termination INSULATION Floor (R-30) (~/LfiC{'.b" ~~u ~~ Wal( (R-19) , Ceiling (R-38) Baffles Vapor Barrier: paint 6 mil black poly in crawl space DRY WALL NAILING Walls - 1-hour construction throughout ~~~~ ~ ~~~~~ 1 IIr. Separation between dwelling units ~a~fr .F~.~~, o~ry~~~ /~k,~ ~` 0 Draft stops /104 G . S"~~! o ~. Elevator Shaft -one hour F.R construction Corridor Construction Enclosed Usable Space under Stairs LANDSCAPING PARKING including bike rack EXTERIOR LIGHTING SCREENING for recycling containers & dumpsters ROOFTOP MEASURES to prohibit seagulls from perching Call John McDonagh (BCD) for inspection @ 379-5085 Ca1148 hours before you dig for utility line locates i-800-424-5555 Page 3 of 5 Permit # BLDDI-178: FINAL Fve Department Sign-Off Public Works Sign-Off Electrical Sign-Off (L.&I) LPG Building Numbers - 5"minimum Plumbing MechanicaUHeating Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors Barrier Free Access to foyer, recycling facilities, etc. Barrier-free thresholds, lever hardware, etc. Elevator Signage -floor designation, emergency lighting Final -Building ~,G J v~G'~ l~ ghl~ -Z.~ b ~~ . ~a ~~ ~ L ~ C.L.. ash ~ ~6b ~ 3~~-jo3 ~ ~,~,,~.~. r?~b G ~7 fb.o~ 6 y Mu.4.v~D..~~• Tt4t-, C1.~c. 'ter :... ~c."~' 1O_S unc~ 6-''ty - GENERAL CONDITIONS I. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures per the approved plans shall be installed on- site and inspected prior to beginning construction; call 385-2294, press 3. Measures may include installation of silt fencing and graveled construction entrance. Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. ~ Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 5 Permit q BLDOI-178 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required Tor a non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 5 of 5