Permit Number: BLDO1-178R-4 Issued: 08/27/02 Parcel Nmnber: 001022 023
Job Address: 350 Castellano Wav Zoning: R-III Type: V 1-hour Occupancy: R-1
Total Occupant Load: 29 Nature of Work: Revision #4: Divide eaistina parlor saace into smaller
parlor and seaarate stora¢e area
Owner: San Juan Avenue LLC Contractor: Owner - (206) 790-4860
GENERAL CONDITIONS APPLY -SEE LAST PAGE ~ L p , V ~l/ / 7s
SEPARATE PERMTI'S REQUIRED: ZS,(/rv /~~D~83
Electrical -Contact Labor & Industries @ 360-417-2702 l(
vZ~ ze2 ~ Zt~
NOTE: Hours of Construction are limited to 7a.m. - 6 p.m., Monday through Friday
and prohibited on weekends and national holidays
REOUIItED INSPECTIONS APPROVED/DATE
FRAMING -barrier free design required
20 minute door
Door to not intrude greater than''/z of corridor
width
Threshold n
~Z71~
Door Hardware
Approach
DRY WALL NAILING
One-hour walls
FINAL -see original inspection record
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
ra®easimvnsa-~
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contraMor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures per the approved plans shall be installed on-
site and inspected prior to beginning construction; cs11385-2294. Measures may include installation of
sik fencing and graveled construction entrance. Adjacent rights-of-way shall be kept free of dirt debris.
Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc.
Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
App6cairt is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your projeM until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenri-four hours notice is required Public Works anuroval must be received prior to
_L _.l__.!_ - •. _ T • 1. _ w . .• r • • .•
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits ezpire if no progress bas been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval rior to making changes in the field. ContaM the Building
Department at 379-5086 rip to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS..
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
WaWmm R Katzauildieg
18I Quinry Street, Suite 301
Pat Tamsmd, WA 98368
Phone: (360) 3A-5086 Fu: (360) 3817675
CITY OF PORT TOWNSEND
CONSTRUCTION PERNIIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Pernik Number: BLDOl-178R-3 Issued: 04/29/02 Parcel Number: 001022 023
Job Address: 350 Castellano Wav Zoning: R=III Type: V 1-hour Occupancy: R-I
Total Occupant Load: 29 Nature of Work: Revision #3: submit details for 1-hour floor & roof
assemblies
Owner: San Juan Avenue LLC Contractor: Windward Construction
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REOUIItED:
Electrical -Contact Labor & Industries @ 360-417-2702
NOTE: Hours of Construction are limited to 7a.m. - 6 p.m., Monday through Friday
and prohibited on weekends and national holidays
~REOUIRED INSPECTIONS
•
APPROVED/DATE
FLOOR FRAMING
Joists -engineered TJI plan shall be on-site at
time of inspection
One -hour floor ceiling assembly per TJI specs
FRAMING
Ceilings -One-hour roof/ceiling assembly per
Gypsum Association
Roof -pre-engineered truss plan required to be
on-site at time of framing inspection
DRY WALL NAILING
One-hour floor/ceiling assembly per attached TJI
specs
One-hour rooflceiling assembly per attached
Gypsum Association details
FINAL -see original inspection record
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Pavrit%BIDOI.I7B&d
GENERAL CONDITIONS
1. Contractors working on this project are required to Gave a Labor 8t Industries contractor's registration
nnm r sad a City business license. Failure to provide proof of tlis documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures pa the approved plans shall be installed on-
site sad iospeded prior W begiming construction; ca11385-2294. Measures may include installation of
siU fencing and graveled construction e~rance. Adjacent rights-of-way shall be kept free of dirt debris.
Soils ezposed during construction shalt be temporan7y stabil'rced with mulching, plastic sheeting, etc.
Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. AU elements of engineeri~ including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are wmpleted.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements Gave been completed and inspected. For Public Works inspection ca11385-2294. A
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required tot a non-
residential project.
8. All building perroits ezpire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. CaU for at keel one inspection per year to keep your
building permit active.
9. Revisions require review and approval prior to mating changes in the field. Contact the Building
Department at 379-5086 prior to mating changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
C~
•
CaB 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
W etemun & ICetx Building
18I Quiny Street, Suite 301
Port Townsend, WA98368
Phone: (360) 379-3208 Fac: (360) 3857675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDO1-1788-2 Issued: 09/18/01 Parcel Number: 001022023
Job Address: 350 Castellano Wav Zoning: R_III Type: V_N Total Occupant Load: NIA -Revise
Foundation Holdowns
Occupancy: R-I Nature of Work: Chance Foundation Holdowns
Owner: San Juan Avenue LLC Contractor: Owner
****All elements of engineering including holdowns, reinforcing steel, anchor bolts and
connections require inspection prior to cover****
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
. Electrical -Contact Labor & Industries @ 360-417-2702
FOUNDATION
Engineered Holdowns -Revise Holdown & Fastener schedule
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 3852294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept tree of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
CaII 48 hours before you dig for utility line locates
I-800-424-5555
Page 1 of 2
Parttit # BLD01-1788-2
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any snd all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
'8. All building permits expire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Coil for at least one inspeMion per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800.424-5555
Page 2 of 2
Waterman & Katz Building
]87 Qninry Street, Suite 301
Port Townsend WA 98368
Phone: (360)379-3208 Fax: (360)385-7675
•
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call •385-2294. for Inspection
CITY OF PORT TOWNSEND
Permit Number: BLDOl-1788-1 Issued: 09/04/01 Parcel Number: 001022023
Job Address: 350 Castellano Wav Zoning: R=III Type: VV=N Total Occupant Load: NIA -
Foundation Only
Occupancy: R-1
Owner: San Juan Avenue LLC
Contractor: Owner
***flll elements of engineering including holdowns, reinforcing steel, anchor bolts and
connections require inspection prior to cover****
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
• Electrical -Contact Labor & Industries @ 360-417-2702
RF.nTTTRFn TNSPF,C"i'TnNS
APPRnVF.T)/nATF.
EROSION & SEDIMENT CONTROL
Erosion control measures shall be installed and inspected per
approved stormwater plan prior to footing work; see SDP#01-
042
FOOTINGS
Setbacks „q
~/~f /O/
/
///
`
Footings ~
l
/ / l
I/
Forms
Reinforcement -grade 60 steel
Interior Footings
UFER
• Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Nature of Work: Construct Foundation
Pemtil#BLD01-176R-1'
FOUNDATION
Stem Wall
Forms
Reinforcement
Anchor Bolts & Washers -per shear wall schedule
Engineered Holdowns
Crawl Access
Foundation Vents - 42 required
Beam Pockets
Elevator Pit
Ri~~~o~ ~
fl. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC~ measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels,
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project untH Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made wkhin six months, or if no inspections are done
by the Building Department within one year. CaII for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the Tield. ContaM the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800.424-5555
Page 2 of 2
Waterman & Katz Buildin8
181 Quincy StreeS Suile 307
Port Townsend, WA 98368
Plane 0360) 379-5086 Fax: (360) 385-7675
r~
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDO1-178 Issued: 10/10/01 Parcel Number: 001022023
Job Address: 350 Castellano Wav Zoning: R-III Type: V 1-hour Occupancy: R-1
Total Occupant Load: 29
Owner: San Juan Avenue LLC
Contractor: Windward Construction
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
' ~ p3GI0~
~~~ ~Nl~
q y~°y ~
I ~ I Dyl j'DL
~, L, o
TE: Hours of Construction are limited to 7a.m. - 6 p.m., Monday through Friday
and prohibited on weekends and national holidays
RF,OTTTRF,D TNSPF,CTTnNS
APPROVED/DATE
FOOTINGS/ FOUNDATION -refer to foundation
permit BLD01-178R-1
FLOOR FRAMING
Girders
~ ~ l~ '
~ //'~~
~/
Girder to Concrete
Beam Pockets
Joists -engineered TJI plan shall be on-site at
time of inspection
Blocking
Craw( Access @ janitor closet
Shield under Posts
Porry Walls
Double joists under bearing walls
Positive Connections
Treated Wood to Concrete
Anchor Bolts & Washers - S/8"per shear wall
schedule
Nature of Work: Construct 9 unit condominium comolex
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page 1 of 5
REQUIRED INSPECTIONS APPROVED/DATE
Permit#BLD01-178
PLUMBING:
Rough-In (D-V-T & Clean Outs)
Water Supply
Gas Supply
Water Hammer Arrester @ clothes 8c dishwashers
Hose Bibs (backflow protection req'd)
Pipe Insulation (R-3)
Pressure Reduction Valve if> 80 psi
Water Heaters
Seismic Restraint - 2 places
Pressure relief valve drain to exterior
Barrier-Free Required - no Type A; all units on
level one shall be Type B units
/,,/
~ W/ ~T/
I
MECHAHICAL -electric heat; budding complies
prescrtptiveljn
Fire/Smoke Dampers 1;s needed @ corridor
penetrations, etc.
Whole House Fans - 1.5 sones max., with manual
and automatic timer
Kitchen fans - 100 cfin
Environmental air exhaust ducting (with backdraft
'
~
dampers), insulation (R-4), and terminus (3
from / n
openings into bui-ding) ~
lQ D ~ `,'{`/
FRAMING
Walls - 1-hour construction throughout
/
Engineered Shear Walls ~
~~O
/
Dwelling Unit Separation Walls l
Blocking for Type B Accessible Units @ F-1
Ceilings
Roof - pre-engineered truss plan required to be
on-site at time of framing inspection
Attic access
Attic draft stops
Attic Venting
Posts, beams & headers - Glu-lams & parallams
per structural engineering
Windows -escape
Windows -safety glazing
Windows Ufactor - .40 or better
NFRC window sticker must be on
windows at inspection time
Air Seal
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 5
Pemti[ N BLDOI.178
RF.niTiRF.D iNSPF.CTiONS APPROVED/DATE
FRAMING (cont'd.)
Fresh Air -window ports ~~~ 0~
Doors -undercut ''/z" for fresh air
Door UFactor - .20 or better
Truss Positive Connection
Fire Blocking
Firestopping
Rated Shaft
Weather Resistive Barrier
CHIMNEYS
Chimney Straps
Termination
INSULATION
Floor (R-30)
(~/LfiC{'.b" ~~u ~~
Wal( (R-19) ,
Ceiling (R-38)
Baffles
Vapor Barrier: paint
6 mil black poly in crawl space
DRY WALL NAILING
Walls - 1-hour construction throughout ~~~~ ~ ~~~~~
1 IIr. Separation between dwelling units ~a~fr .F~.~~, o~ry~~~ /~k,~ ~` 0
Draft stops
/104 G . S"~~! o ~.
Elevator Shaft -one hour F.R construction
Corridor Construction
Enclosed Usable Space under Stairs
LANDSCAPING
PARKING including bike rack
EXTERIOR LIGHTING
SCREENING for recycling containers & dumpsters
ROOFTOP MEASURES to prohibit seagulls from
perching
Call John McDonagh (BCD) for inspection @
379-5085
Ca1148 hours before you dig for utility line locates
i-800-424-5555
Page 3 of 5
Permit # BLDDI-178:
FINAL
Fve Department Sign-Off
Public Works Sign-Off
Electrical Sign-Off (L.&I)
LPG
Building Numbers - 5"minimum
Plumbing
MechanicaUHeating
Insulation Certificate
Vapor Barrier Paint Certificate
Smoke Detectors
Barrier Free Access to foyer, recycling facilities, etc.
Barrier-free thresholds, lever hardware, etc.
Elevator Signage -floor designation, emergency lighting
Final -Building
~,G J v~G'~ l~ ghl~
-Z.~ b ~~ . ~a ~~ ~ L ~
C.L..
ash ~ ~6b ~
3~~-jo3 ~ ~,~,,~.~.
r?~b G ~7 fb.o~
6 y
Mu.4.v~D..~~• Tt4t-, C1.~c.
'ter :... ~c."~' 1O_S unc~ 6-''ty -
GENERAL CONDITIONS
I. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures per the approved plans shall be installed on-
site and inspected prior to beginning construction; call 385-2294, press 3. Measures may include
installation of silt fencing and graveled construction entrance. Adjacent rights-of--way shall be kept free
of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction
is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. ~
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 5
Permit q BLDOI-178
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required Tor a non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 5 of 5