HomeMy WebLinkAboutBLD01-174wstmman s x~
t8t Q~~r svca sw>c Sot
Pmt Tomnrnd WA 98368
PFwne (360) 379-3208 Fax (360) 385-7675
CITY OF PORT TOWNSEND
i! CONSTRUCTION PERMIT & INSPECTION RECORD
I THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
I Ca11385-2294 for Inspection
Permit Number: BLDOl-174 Issued: 7/25/Ol Parce! Number: 989706402
Job Address: 331 Benton Street Zoning: R-II Type: VV=N Occupancy: A-3
Total Occupant Load: No Chance Nature of Work: Remove F-2 wall; install new beam
Owner: Seventh-Dav Adventist Church Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RE UIRED INSPECTIONS
APPROVED/DATE
FRAMING
LVL Beam -per engineering
Wall -add 2" x 6" studs per engineering
~~i~~~j
lam/
DRYWALL
Walls ~ ~, ,, r
~ CT I
~
i
FINAL
Fire Departrnent Final Approval (if applicable}
Building Numbers posted (min. 5")
Building -Final
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details}. Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
• (ABWP) require inspection prior to cover.
Ca1148 hours before you dig utility line locates: I-800-424-5555
Page I of 2
Pn+nit q BLDDI-174
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspeMions.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected For Public Works inspection ca11385-2294, press 3. A
minimum of twenty-four hours notice is required. Public Works aoaroval must be received prior to
scheduline the Building Deaartment's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential projeM.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig utility line locates: 1-800-424-5555
Page 2 of 2