Loading...
HomeMy WebLinkAboutBLD01-174wstmman s x~ t8t Q~~r svca sw>c Sot Pmt Tomnrnd WA 98368 PFwne (360) 379-3208 Fax (360) 385-7675 CITY OF PORT TOWNSEND i! CONSTRUCTION PERMIT & INSPECTION RECORD I THIS CARD MUST BE POSTED AT CONSTRUCTION SITE I Ca11385-2294 for Inspection Permit Number: BLDOl-174 Issued: 7/25/Ol Parce! Number: 989706402 Job Address: 331 Benton Street Zoning: R-II Type: VV=N Occupancy: A-3 Total Occupant Load: No Chance Nature of Work: Remove F-2 wall; install new beam Owner: Seventh-Dav Adventist Church Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE RE UIRED INSPECTIONS APPROVED/DATE FRAMING LVL Beam -per engineering Wall -add 2" x 6" studs per engineering ~~i~~~j lam/ DRYWALL Walls ~ ~, ,, r ~ CT I ~ i FINAL Fire Departrnent Final Approval (if applicable} Building Numbers posted (min. 5") Building -Final GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details}. Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels • (ABWP) require inspection prior to cover. Ca1148 hours before you dig utility line locates: I-800-424-5555 Page I of 2 Pn+nit q BLDDI-174 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspeMions. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected For Public Works inspection ca11385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works aoaroval must be received prior to scheduline the Building Deaartment's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential projeM. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig utility line locates: 1-800-424-5555 Page 2 of 2