Loading...
HomeMy WebLinkAboutBLD01-172Waterman & Katz Building I81 Quitrcy SL, Suite 301 Pon Townsend, W A 98368 Phone (360) 379-3208 Fax: (360) 379-6927 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDO1-172 Issued: 07/25/01 Parcel Number: 957607001 Job Address: 2205 Sims Way Zoning: CC=II Type: V-N Occupancy: M Nature of Work: _Reolace existing composition roofing with new composition shingles. venting, and torchdown membrance to parapet walls- Owner: Dennis McGuire Contractor: Hoae Roofing GENERAL CONDITIONS APPLY -SEE LAST PAGE RF.(1TTTRF.1) TNSPF,C'TTONS APPROVED/DATE DEMOLITION All construction debris to be deposited in Jefferson County Landfill or other location in accordance with all local, state and federal laws. ROOFING Per Manufacturer's Specs and UBC Chapter 15 ROOF VENTING Ridge & End Wall Net free ventilation area shall not be less than 1 square foot per I50 square feet of the area of the space ventilated, unless 50% of the required vent opening area is provided in the upper portion of the roof and therefore the rate may be reduced to 1 square foot of venting to 300 square feet of area vented. Openings shall be covered with corrosion resistant'/<" mesh. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of Z Permit #BLDOI-172 FINAL Site Address - 5 inch numbers of contrasting color posted near main entrance of building and visible from street per Port Townsend Municipal Code. Final -Roof GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils sha-1 be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's .agent shall review and oversee correction of any and all deficiencies noted t. required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works regwrements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-tour hours notice is required. Public Works aaaroval must be received prior to scheduling the Buildin¢ Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 2 of 2