HomeMy WebLinkAboutBLD01-172Waterman & Katz Building
I81 Quitrcy SL, Suite 301
Pon Townsend, W A 98368
Phone (360) 379-3208 Fax: (360) 379-6927
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDO1-172 Issued: 07/25/01 Parcel Number: 957607001
Job Address: 2205 Sims Way Zoning: CC=II Type: V-N Occupancy: M
Nature of Work: _Reolace existing composition roofing with new composition shingles. venting, and
torchdown membrance to parapet walls-
Owner: Dennis McGuire
Contractor: Hoae Roofing
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RF.(1TTTRF.1) TNSPF,C'TTONS
APPROVED/DATE
DEMOLITION
All construction debris to be deposited in
Jefferson County Landfill or other location in
accordance with all local, state and federal
laws.
ROOFING
Per Manufacturer's Specs and
UBC Chapter 15
ROOF VENTING
Ridge & End Wall
Net free ventilation area shall not be less than
1 square foot per I50 square feet of the
area of the space ventilated, unless 50% of
the required vent opening area is provided
in the upper portion of the roof and
therefore the rate may be reduced to 1
square foot of venting to 300 square feet of
area vented. Openings shall be covered
with corrosion resistant'/<" mesh.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of Z
Permit #BLDOI-172
FINAL
Site Address - 5 inch numbers of
contrasting color posted near main entrance
of building and visible from street per Port
Townsend Municipal Code.
Final -Roof
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
re¢istration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils sha-1 be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's .agent shall review and oversee correction of any and all deficiencies noted t.
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
regwrements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-tour hours notice is required. Public Works aaaroval must be received prior to
scheduling the Buildin¢ Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within siz months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 2 of 2