Loading...
HomeMy WebLinkAboutBLD01-169W'a[ertnan & Katz Building 18I Qtinry StreeS Suite 3D7 Port Townsend, W A 98368 Phone'(360)379-3208 Fax: (360)379-6923 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11 3 85-22 94 for Inspection Permit Number: BLDOI-169 Issued: 07/27/01 Parcel Number: 931-403-208 Job Address: 210 Rose Street Zoning: RR=II Type: VAN Occupancy: U-1 Nature of Work: Construct 576 s . ft. Gara e Owner: Ron Priest Contractor: Richard Staaf Construction (301-1199) GENERAL CONDITIONS APPLY -SEE LAST PAGE RFnTiTRFn TNRPFf'TTnNS APPROVEDlDATE TEMPORARY EROSION & SEDIMENT CONTROL See General Condition No 2 FOOTING ~~ `~ J ~~/ L/ Setbacks Footings Forms nforcement Rei ~~ ~~ Nl L~ l ~/~~ FOUNDATI N j ,/I ' 1 Stem Wall Forms Reinforcement Anchor bolts w 2"x 2" x 3/16" washers FRAMING Engineered truss plan to be on-site at time of inspection _ ~ ~~~ j%/ Walls nt Treated Wood to Concrete Anchor Bolts Ceiling/Roof Truss Positive Connection Weather Resistive Barrier FINAL Final -Building Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 (~ Ch v~md~ a auwi GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance. Adjacent rights-of--way shall be kept tree of dirt & debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5, Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. Z. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required for a non, residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year 4o keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (3'79-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Cali 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2