HomeMy WebLinkAboutBLD01-168Welem~an&Katz
7 n Quinry Streel Swle 301
Port Towr~ssend WA 98366
Phox (360) 379-3208 Far (360) 3857675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT &
RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDO1-16g Issued: 7/20/Ol Parcel Number: 965702808
Job Address: 731 Pierce Street Zoning: RR=II Type: VV=N Occupancy: R-3
Total Occupant Load: No Chance Nature of Work: Rebuild tog portion of 3 chimneys
Owner: Mike Barrs & Therese Rubenstein Contractor: Discovery Bav Construction
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RF.(1TTiRF.il iNCPF.f'TT(INC
•
APPROVED/DATE
CHIMNEYS
Reinforcement
Straps
Termination
Spark Arrester
FINAL
House Numbers posted (min. 5'~
Smoke Detectors throughout existing construction per 1997
UBC
Final
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior
to beginning construction; caI1385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding; plantings, sodding, etc. once construction is
complete. Applicant is responsible for proteMion of adjacent properties.
Ca1148 hours before you dig utility line locates: 1-800-424-5555
Page I of 2
r~~ a e~no~-ws
3. All .elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspeMion is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduline the Buildine Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or it no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS. PERMIT ON-SITE WITH THE APPROVED PLANS.
~~
Ca1148 hours before you dig utility linelocates: I-800-024-5555
Page 2 of 2