HomeMy WebLinkAboutBLD01-166Waterman & Katy BuOdi~ 181 Quincy Street, Sufte 301 Port To~maend, WA 98368 Phone: 360-379-5086 Fax 360J8&7675 r~ u CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDO1-166R-2 Job Address: 1300 Maale Zoning: RR=II Total Occupant Load: 2 Issued: 06/18/03 Parcel Number: 984 902 801 Type: VAN Occupancy: U-1/R-3(loft) Nature of Work: Revision #2: Add deck connecting house and earaae: cantilever kitchen & add window Owner: Michael Kraiak/Jennifer Foster Contractor: Same as Owner 360-221-8702 GENERAL CONDITIONS APPLY: See last oa¢e SEPARATE PERMTI'S REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 * *See Also Original Inspection Record BLD01-166* RE UIRED INSPECTIONS APPROVED/DATE FLOOR FRAMING Joists Blocking Positive Connections FRAMING Steps/Guardrails Walls Blocking Roof Positive Connections Posts, beams and headers Doors/Landings Weather Resistive Barrier DRYWALL NAII.ING Garage/House Occupancy separation @ deck CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 2 Building Permit #BLiXI t-166RQ FINAL Final -building (refer to Permit BLDO1-166 & R-1) GENERAL CONDITIONS L Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silYfencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is repaired. Public Works approval must be received prior to scheduling the Building Deoartroent's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval rior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 Waterman & Katz Building 181 Quincy Street, Suile 301 Port Townsend, WA 98368 Phone: 360-379-5086 Fax 360385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOI-166R-1 .Issued: 08/27/01 Parcel Number: 984 902.801 Job Address: 1300 Maale Zoning: RR=H Type: VV=N Occupancy: U-1/R-3(loftl Total Occupant Load: 2 Nature of Work: Detached Garage with Loft (see BLDOl-166 for single-family residence) Owner: Michael Kraiak/JenniferFnster Contractor: Same as Owner 360-221-8702 GENERAL CONDITIONS APPLY: See last ease SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 RF.OUiRED INSPECTIONS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL See General Condition #2 & attached Street and Development Permit Silt Fencing Graveled construction entrance required to prevent dirt and sediment from leaving the site MONOLITHIC SLAB Setbacks Forms Reinforcement LIFER Anchor Bolts & Washers Interior Footing CALL 48 hours before you dig for Utility Tine locates 1-800-424-5555 Page 1 of 3 Building Permit g04166R-I REQUIRED INSPECTIONS APPROVED/DATE J FLOOR FRAMING Joists Blocking Positive Connection FRAMING Stairs/Handrails Walls Roof Rafter positive connection Blocking ,1 ~~~~~fthr~lt~~ DX ` a3 ' ~ ` Attic venting -ridge vent 7 ! Posts, beams and headers Doors/Landings Fireblocking Weather Resistive Barrier Garage/loft occupancy sepazation 20 minute rated self-closing door DRYWALL NAILING Walls Ceiling Garage/Loft Occupancy separation including stairs FINAL Final -building (refer to Permit BLDO1-166 for house construction) r'1 Ca1148 hours before you dig for utility line -ocates 1-800-424-5555 Page 2 of 3 GENERAL CONDITIONS Building Permit p01-166R-1 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. ti. The Building Department is unable to pass foal inspection on your project until Public • Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Call 48 hours before you dig Tor utility line locates 1-800-424-5555 Page 3 of 3 ._.~ n u r CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO1-166 Issued: 08/27/01 Parcel Number: 984902801 Job Address: 1300 Maple Zoning: RR=H Type: VV=N Occupancy: RR=3 Total Occupant Load: 4 Nature of Work: Sinele-family Dwelling (see BLDOl-166R-1 for detached earaQe) Owner: Michael KraiaWJennifer Foster Contractor: Same as Owner 360-221-8702 GENERAL CONDITIONS APPLY: See last pate SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 3G0-417-2702 T2F(1TTTRFTI TNCPF(`TT(1Nfi Waterman & Katz Building 181 Quinry Street, Sulte 301 Porl7ownaend, WA 98368 Phone: 360379-5086 Paz 360J83-7675 APPRnVF,n/nATF, TEMP EROSION & SEDIMENT CONTROL See General Condition #2 & attached Street and Development Permit Silt Fencing Graveled construction entrance required to prevent dirt and sediment from leaving the site FOOTINGS Setbacks ~~~~~ Footings Forms C~/~t~'~3G~~ Reinforcement 7/~/~~ ?i1 CCU InteriorFootings Porch Piers LIFER • CALL 48 hours before you dig for Utility line locates 1-800-424-5555 • Page 1 of 4 Building Prnnit #01-166 REQUIRED INSPECTIONS FOUNDATION ~ Stem Wall fC/~/0 ~ / Forms / ( u/ Reinforcement Anchor Bolts & Washers -per shear wall schedule Engineered Holdowns l ,, 1 ~~ /~ U ~~, ~'I©7i ~'{~ l: "I Waterproofing SLAB Hydronic Tubing R-10 Insulation Interior Footing FLOOR FRAMING Joists Blocking Positive Connection Treated Wood to Concrete Anchor Bolts & Washers -per shear wall schedule PLUMBING Rough-In (D-V-T & Clean outs) ~ ~ /~ DUJII b (~ ll / Water Supply ~ O (~' Water Hammer Arrestor @ clothes and dishwasher Gas Supply Hose Bibbs - backflow protection required Pipe Insulation (R-3) Pres re Reduction Valve if> 80 si ater Heater Seismic Restraint - 2 places C t~+~ ""' Pressure Relief Valve drain to exterior, terminate ~ I / `'-v ~~ V 6" -24" above ground 1. MECHANICAL LPG Boiler/water heater Hydronic in-floor heating Whole house ventilation Whole house fan in master bath Wall ports Source Specific Exhaust Fans @ bathrooms (SOcfin), kitchen (100 cfm) and utility room (50 cfin} Environmental air exhaust ducting (with backdraft dampers), insulation (R-4) and terminus (3' from openings into building) APPROVED/DATE. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 RF(liiiRF.n iN~PF,('TinNS Building Permit #01-166 APPROVED/DATE FRAMING --- -- - Wal(s Engineered Shear Walls -- ~~`7 p v-K ~'d ~ n S~~`\ S''0~ '~^'1 Ceiling Joists n~-~ ~`~ ~t• w aU - I Roof ~b C ~ -a~•a3 Rafter positive connection Attic venting - soft and ridge vents Posts, beams and headers Wi d ows -escape n Windows-safety glazing j~'-®+-14d~-~+T)~G D1 ~~~4~63 CC Window U-factor - .60 or better NFRC sticker must be on windows at time of inspection Doors - .40 or better -- -- 2 -o r ea ----- o t<- 6 - 3 _ _ ~---__________. Fireblocking Weather Resistive Barrier INSIILATION Slab (R-10 required) Walls (R-19) Ceiling (R-30) Baffles ~ ~ z3 O 3 Vapor Battier -vapor barrier paint DRYWALL NAILING Walls n / Ceiling I ~''~ ~~7 f Z/b~ 1~(auSEDt~c~ ` Enclosed Usable Space under Stairs FINAL Public Works Sign-off LPG ~' House Numbers - 5 "numbers minimum Plumbing Mechanical/Heating Insulation Certificate ` ~ Vapor Barrier Paint Certificate , ~ '-^ j" Smoke Detectors ~ ~ - Final. -building • Ca1148 hours before you dig Tor utility line locates 1-800-424-5555 Page 3 of 4 Building Pemtit f701-166 GENERAL CONDTCIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to :provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public . Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to schedulinP the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5081; prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates • 1-800-424-5555 Page 4 bf 4