Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutBLD01-166Waterman & Katy BuOdi~
181 Quincy Street, Sufte 301
Port To~maend, WA 98368
Phone: 360-379-5086 Fax 360J8&7675
r~
u
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDO1-166R-2
Job Address: 1300 Maale Zoning: RR=II
Total Occupant Load: 2
Issued: 06/18/03 Parcel Number: 984 902 801
Type: VAN Occupancy: U-1/R-3(loft)
Nature of Work: Revision #2: Add deck connecting house and earaae: cantilever kitchen &
add window
Owner: Michael Kraiak/Jennifer Foster Contractor: Same as Owner
360-221-8702
GENERAL CONDITIONS APPLY: See last oa¢e
SEPARATE PERMTI'S REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
* *See Also Original Inspection Record BLD01-166*
RE UIRED INSPECTIONS APPROVED/DATE
FLOOR FRAMING
Joists
Blocking
Positive Connections
FRAMING
Steps/Guardrails
Walls
Blocking
Roof
Positive Connections
Posts, beams and headers
Doors/Landings
Weather Resistive Barrier
DRYWALL NAII.ING
Garage/House Occupancy separation @ deck
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 2
Building Permit #BLiXI t-166RQ
FINAL
Final -building (refer to Permit BLDO1-166 & R-1)
GENERAL CONDITIONS
L Contractors working on this project are required to have a Labor & Industries
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and
inspected prior to beginning construction; ca11385-2294. Measures shall include
installation of silYfencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is repaired. Public Works approval
must be received prior to scheduling the Building Deoartroent's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
8. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval rior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
Waterman & Katz Building
181 Quincy Street, Suile 301
Port Townsend, WA 98368
Phone: 360-379-5086 Fax 360385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDOI-166R-1 .Issued: 08/27/01 Parcel Number: 984 902.801
Job Address: 1300 Maale Zoning: RR=H Type: VV=N Occupancy: U-1/R-3(loftl
Total Occupant Load: 2
Nature of Work: Detached Garage with Loft (see BLDOl-166 for single-family residence)
Owner: Michael Kraiak/JenniferFnster Contractor: Same as Owner
360-221-8702
GENERAL CONDITIONS APPLY: See last ease
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
RF.OUiRED INSPECTIONS
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition #2 & attached Street and
Development Permit
Silt Fencing
Graveled construction entrance required to prevent
dirt and sediment from leaving the site
MONOLITHIC SLAB
Setbacks
Forms
Reinforcement
LIFER
Anchor Bolts & Washers
Interior Footing
CALL 48 hours before you dig for Utility Tine locates
1-800-424-5555
Page 1 of 3
Building Permit g04166R-I
REQUIRED INSPECTIONS
APPROVED/DATE
J
FLOOR FRAMING
Joists
Blocking
Positive Connection
FRAMING
Stairs/Handrails
Walls
Roof
Rafter positive connection
Blocking ,1
~~~~~fthr~lt~~ DX `
a3
' ~ `
Attic venting -ridge vent 7
!
Posts, beams and headers
Doors/Landings
Fireblocking
Weather Resistive Barrier
Garage/loft occupancy sepazation
20 minute rated self-closing door
DRYWALL NAILING
Walls
Ceiling
Garage/Loft Occupancy separation including stairs
FINAL
Final -building (refer to Permit BLDO1-166 for house
construction)
r'1
Ca1148 hours before you dig for utility line -ocates
1-800-424-5555
Page 2 of 3
GENERAL CONDITIONS
Building Permit p01-166R-1
1. Contractors working on this project are required to have a Labor & Industries
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; ca11385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
ti. The Building Department is unable to pass foal inspection on your project until Public
• Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is required. Public Works approval
must be received prior to scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
8. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
• Call 48 hours before you dig Tor utility line locates
1-800-424-5555
Page 3 of 3
._.~
n
u
r
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDO1-166 Issued: 08/27/01 Parcel Number: 984902801
Job Address: 1300 Maple Zoning: RR=H Type: VV=N Occupancy: RR=3
Total Occupant Load: 4 Nature of Work: Sinele-family Dwelling (see BLDOl-166R-1 for
detached earaQe)
Owner: Michael KraiaWJennifer Foster Contractor: Same as Owner
360-221-8702
GENERAL CONDITIONS APPLY: See last pate
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 3G0-417-2702
T2F(1TTTRFTI TNCPF(`TT(1Nfi
Waterman & Katz Building
181 Quinry Street, Sulte 301
Porl7ownaend, WA 98368
Phone: 360379-5086 Paz 360J83-7675
APPRnVF,n/nATF,
TEMP EROSION & SEDIMENT CONTROL
See General Condition #2 & attached Street and
Development Permit
Silt Fencing
Graveled construction entrance required to prevent
dirt and sediment from leaving the site
FOOTINGS
Setbacks
~~~~~
Footings
Forms C~/~t~'~3G~~
Reinforcement
7/~/~~ ?i1
CCU
InteriorFootings
Porch Piers
LIFER
•
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
•
Page 1 of 4
Building Prnnit #01-166
REQUIRED INSPECTIONS
FOUNDATION
~
Stem Wall fC/~/0 ~ /
Forms / ( u/
Reinforcement
Anchor Bolts & Washers -per shear wall schedule
Engineered Holdowns l
,, 1 ~~
/~ U ~~, ~'I©7i ~'{~
l: "I
Waterproofing
SLAB
Hydronic Tubing
R-10 Insulation
Interior Footing
FLOOR FRAMING
Joists
Blocking
Positive Connection
Treated Wood to Concrete
Anchor Bolts & Washers -per shear wall schedule
PLUMBING
Rough-In (D-V-T & Clean outs) ~ ~ /~
DUJII b (~ ll
/
Water Supply ~
O (~'
Water Hammer Arrestor @ clothes and dishwasher
Gas Supply
Hose Bibbs - backflow protection required
Pipe Insulation (R-3)
Pres re Reduction Valve if> 80 si
ater Heater
Seismic Restraint - 2 places C
t~+~ ""'
Pressure Relief Valve drain to exterior, terminate ~ I / `'-v
~~
V
6" -24" above ground 1.
MECHANICAL
LPG Boiler/water heater
Hydronic in-floor heating
Whole house ventilation
Whole house fan in master bath
Wall ports
Source Specific Exhaust Fans @ bathrooms (SOcfin),
kitchen (100 cfm) and utility room (50 cfin}
Environmental air exhaust ducting (with backdraft
dampers), insulation (R-4) and terminus (3' from
openings into building)
APPROVED/DATE.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
RF(liiiRF.n iN~PF,('TinNS
Building Permit #01-166
APPROVED/DATE
FRAMING --- -- -
Wal(s
Engineered Shear Walls -- ~~`7 p
v-K ~'d ~ n S~~`\ S''0~ '~^'1
Ceiling Joists n~-~ ~`~ ~t• w aU - I
Roof ~b C ~ -a~•a3
Rafter positive connection
Attic venting - soft and ridge vents
Posts, beams and headers
Wi
d
ows -escape
n
Windows-safety glazing
j~'-®+-14d~-~+T)~G D1 ~~~4~63
CC
Window U-factor - .60 or better
NFRC sticker must be on windows at time of inspection
Doors - .40 or better
-- --
2 -o
r ea -----
o t<- 6 - 3 _ _ ~---__________.
Fireblocking
Weather Resistive Barrier
INSIILATION
Slab (R-10 required)
Walls (R-19)
Ceiling (R-30)
Baffles
~ ~ z3 O 3
Vapor Battier -vapor barrier paint
DRYWALL NAILING
Walls n
/
Ceiling I
~''~ ~~7 f Z/b~ 1~(auSEDt~c~
`
Enclosed Usable Space under Stairs
FINAL
Public Works Sign-off
LPG ~'
House Numbers - 5 "numbers minimum
Plumbing
Mechanical/Heating
Insulation Certificate `
~
Vapor Barrier Paint Certificate ,
~
'-^ j"
Smoke Detectors ~ ~ -
Final. -building
• Ca1148 hours before you dig Tor utility line locates
1-800-424-5555
Page 3 of 4
Building Pemtit f701-166
GENERAL CONDTCIONS
1. Contractors working on this project are required to have a Labor & Industries
contractor's registration number and a City business license. Failure to :provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; call 385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public .
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is required. Public Works approval
must be received prior to schedulinP the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
8. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the
Building Department at 379-5081; prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates •
1-800-424-5555
Page 4 bf 4