Loading...
HomeMy WebLinkAboutBLD01-165Watnmm S. Kw+Bwldin8 161 Quvwy 8tree4 Sw4 301 Port Towmmd WA 98368 Phone: (360) 3793208 Fu: (360) 385-7615 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 Tor Inspection Permit Number: BLDO1-16S Issued: 8/13101 Parcel Number: 957602803 Job Address: Gaines and Water Streets Zoning: CC_II Type: IIII=N Occupancy: SS=2 Nature of Work: Construct New Pumn Station/Eneine Generator Occupant Load: N/A Owner: Citv of Port Townsend Public Works Contractor: Strider Construction GENERAL CONDTTIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor and Industries @ 360-417-2702 NnTE: Special Inspection required for foundation concrete where structural design is based 3500 psi per UBC Section 1701.5 Item 1. Special Inspector shall be ICBO certified and listed in the current edition of WABO Apencv and Inspector Register or present credentials to the Building Department prior to • performing inspections. Required Special Inspection Reports shall indicate compliance wish the plans and specifications and shall be copied to the Building Department in a timely manner. Permit Holder or Permit Holder's Agent shall review and oversee correction of any and all defrciencies noted by required special inspections. RE UIRED INSPECTIONS APPROVED/DATE TEMP EROSION & SDM'T CONTROL Erosion control measures to be installed during construction per the attached plans DEMOLITION Materials from demolition shall be disposed ofin azeas of£ site meeting all requirements of State and local law FOOTINGS Footings Forms Reinforcement -grade 60 steel Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 PmnitN BLDOI.165 REQUIRED INSPECTIONS APPRnVF.n/1nATP SLAB FOUNDATION Forms Reinforcement -grade 60 steel Floor Drain UFER FOUNDATION Below Grade Walls Reinforcement PLUMBING Rough-In (D-W-V & Clean OutsO Water Supply Pipe Insulation (R-3) Pressure Reduction Valve if pressure > 80 psi Hose Bibbs 1" Backflow Preventer MECHANICAL Exhaust and Supply Fans and Terminus Intake and Exhaust Louvers w/ backdraft dampers FRAMING - Ald welding to be done by certified welders Walls Roof Positive Connections Fireblocking DRYWALL/NAILING Walls LIGHTING NREC Lighting Budget @ .5 watts/square foot LANDSCAPING Per the attached plan; contact Judy Surber @ 379-5084 for inspection Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 3 Permil H BLDOI-165 FINAL Property Address Posted - nunimum 5" numbers Fire Department Approval Electrical Approval (L & n Barrier Free Access & Design -ramps, handrails, etc. Final -Plumbing I Z~ fR (0z (-~ Final -Mechanical Final -Building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, ho[downs, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Departments final inspection. 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Obtain revisions from the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3