HomeMy WebLinkAboutBLD01-165Watnmm S. Kw+Bwldin8
161 Quvwy 8tree4 Sw4 301
Port Towmmd WA 98368
Phone: (360) 3793208 Fu: (360) 385-7615
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 Tor Inspection
Permit Number: BLDO1-16S Issued: 8/13101 Parcel Number: 957602803
Job Address: Gaines and Water Streets Zoning: CC_II Type: IIII=N Occupancy: SS=2
Nature of Work: Construct New Pumn Station/Eneine Generator Occupant Load: N/A
Owner: Citv of Port Townsend Public Works Contractor: Strider Construction
GENERAL CONDTTIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor and Industries @ 360-417-2702
NnTE: Special Inspection required for foundation concrete where structural design is based 3500 psi
per UBC Section 1701.5 Item 1. Special Inspector shall be ICBO certified and listed in the current edition
of WABO Apencv and Inspector Register or present credentials to the Building Department prior to
• performing inspections. Required Special Inspection Reports shall indicate compliance wish the plans and
specifications and shall be copied to the Building Department in a timely manner. Permit Holder or
Permit Holder's Agent shall review and oversee correction of any and all defrciencies noted by required
special inspections.
RE UIRED INSPECTIONS
APPROVED/DATE
TEMP EROSION & SDM'T CONTROL
Erosion control measures to be installed during
construction per the attached plans
DEMOLITION
Materials from demolition shall be disposed ofin azeas of£
site meeting all requirements of State and local law
FOOTINGS
Footings
Forms
Reinforcement -grade 60 steel
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 3
PmnitN BLDOI.165
REQUIRED INSPECTIONS APPRnVF.n/1nATP
SLAB FOUNDATION
Forms
Reinforcement -grade 60 steel
Floor Drain
UFER
FOUNDATION
Below Grade Walls
Reinforcement
PLUMBING
Rough-In (D-W-V & Clean OutsO
Water Supply
Pipe Insulation (R-3)
Pressure Reduction Valve if pressure > 80 psi
Hose Bibbs
1" Backflow Preventer
MECHANICAL
Exhaust and Supply Fans and Terminus
Intake and Exhaust Louvers w/ backdraft dampers
FRAMING - Ald welding to be done by certified
welders
Walls
Roof
Positive Connections
Fireblocking
DRYWALL/NAILING
Walls
LIGHTING
NREC Lighting Budget @ .5 watts/square foot
LANDSCAPING
Per the attached plan; contact Judy Surber @ 379-5084
for inspection
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 3
Permil H BLDOI-165
FINAL
Property Address Posted - nunimum 5" numbers
Fire Department Approval
Electrical Approval (L & n
Barrier Free Access & Design -ramps, handrails, etc.
Final -Plumbing
I Z~ fR (0z (-~
Final -Mechanical
Final -Building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, ho[downs, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Departments final inspection.
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Obtain revisions from the
Building Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3