Loading...
HomeMy WebLinkAboutBLD01-161 Watermmt & Katz Building 181 Quinry Street, Suite 301 Pmt 7ouiuend, WA 98368 Phone: (360) 379-37AB Fax: (360) 3857675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO1-161 Issued: 08/03/01 Parcel Number: 957-308-006 Job Address: 430 Cass Street Zoning: R-II Type: VV=N Occupancy: U-1 Nature of Work: Construct 580 square foot unheated Pole Buildine (Shop/Outbuilding) Owner: John Strunk Contractor: Dale West Specialty Woodworkin¢, Inc. (360) 460-8643 GENERAL CONDITIONS APPLY -SEE LAST PAGE REQUIRED INSPECTIONS APPROVED/DATE TEMPORARY EROSION & SEDIMENT CONTROL See General Condition No 2, install on-site as needed during construction -okay to use existing driveway as construction entrance FOOTING .'7jha7^~ ~ ` ~ ~Jl v~(7/ ~ Setbacks Footings 1 ~~ ~ ~~G ~I~~ ~, Forms J ~ Reinforcement - #5, grade 60 steel Porch Piers FOUNDATION Stem Wall Forms Reinforcement - #5, grade 60 steel Anchor Bolts - S/8" Threaded Rod - 5/8" Vents Crawl Access Engineered Holdowns Call 48 hours before you dig for utility line locates I-800-424-5555 Page I of 3 Permit#BI.D01-161 REQUIRED INSPECTIONS APPROVF.iI/iIATF. FLOORFRAMING -Engineered BCI plan shall be on- site at time of inspeciion r , l 1j n Joists ~ ~ ®/ ~ UX1 ~ J Blocking „- l , Building Paper Concrete-to-Joists (per engineering) Hangers Positive Connections Post Base Anchor Bolts & Washers FRAMING -Timbers to be DF#1 or better Walls / ///}}} /~ /QIg/ O~ / J// Ceiling/Roof -refer to sheet TF2 for post/beam and I I l_r-V rafter connections Blocking O ~ R~ ~ . Fire Bocking Weather Resistive Barrier ~~~ ~ ?~ O 1 FINAL Stairs / n~ Handrail ~ Z ~~ ~~ I l.( Porch Final -Building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's recistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance. Adjacent rights-of--way shall be kept free of dirt & debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. .J Ca1148 hours before you dig Tor utility line locates I-800-424-5555 Page 2 of 3 r r~rc u si,uot-ici • 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A 7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required fora non- residential project. 8. Atl building permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3 1 J U r